Do you take on publicly bid and prevailing-wage projects?
Yes. Publicly bid work is a core market for us. We carry bid, performance, and payment bonds, run certified payroll, and document Davis-Bacon-type prevailing-wage compliance on federally funded projects. The submittal, RFI, and closeout discipline public contracts demand is built into how we run every job — not bolted on for the audit.
What licenses and bonding do public agencies look for?
Agencies typically require an Arizona ROC license that matches the scope, plus bid, performance, and payment bonds. We hold KB-1 dual building (#329360), KA engineering (#312437), CR-11 electrical (#276948), and CR-39 HVAC (#326401) licenses, and we are bonded and insured for public work statewide. Our credentials page lists the full package agencies request at prequalification.
Can you work in occupied public facilities without disrupting services?
Yes. Libraries, administrative offices, and maintenance yards have to keep serving the public while we work. We phase the job around operating hours, schedule shutdowns for nights or weekends with advance notice, keep egress and life-safety systems live throughout, and walk every outage with facility staff before it happens.
Do you build site and roadway lighting to Tucson's dark-sky code?
Yes. Tucson and Pima County enforce an outdoor lighting code that governs shielding, color temperature, and how much light a site can put out — and public projects are expected to lead by example. Our in-house engineers produce the photometric design and our crews install the complete system, the same way we deliver parking lot lighting for private owners.
How do you handle utility coordination on public sites?
We coordinate directly with TEP across the Tucson metro and Trico in rural Pima County — new services, upgrades, and relocations in the public right-of-way. We prepare the utility submittals, build to the service-entrance requirements, and keep the utility's lead times visible in the project schedule. Our TEP standards hub collects the requirements we field most often.
What documentation does the agency get at closeout?
A complete package: as-built drawings, O&M manuals, accurate panel schedules, warranty documentation, test and inspection records, and training for the facility staff who will run the systems. We treat close-out as a deliverable with the same weight as the installation — it is what the agency lives with after we demobilize.