Is Arizona Electrical Solutions a licensed general contractor in Tucson?
Yes. We hold an Arizona ROC KB-1 Dual Building license (#329360) and are headquartered at 333 N Wilmot Road in Tucson. We can hold the prime contract and self-perform the major trades on commercial projects across the Tucson metro and Pima County.
What does design-build delivery mean for my project?
In design-build, one team owns both the design and the construction. We bring constructability and cost reality into the drawings early, compress the schedule, and give the owner a single point of responsibility from concept to close-out instead of refereeing between a designer and separate subcontractors.
What scopes do you self-perform as the general contractor?
We self-perform the electrical, underground and heavy-civil, and HVAC and mechanical scopes that usually drive commercial schedules, with in-house electrical engineering. These are the same scopes covered by our work as a commercial electrician in Tucson, so the trades that most often hold up a project are controlled directly by us.
What types of commercial buildings do you build in Tucson?
Offices, retail and tenant improvements, industrial and warehouse, healthcare and institutional, and municipal and public projects throughout Tucson, Pima County, and statewide. We also coordinate City of Tucson and Pima County permitting and Tucson Electric Power (TEP) service so the project does not stall.
How early should we bring you into a project?
Before the drawings are done — ideally at the program or concept stage. Pre-construction is where the big money is saved or lost: utility applications, long-lead switchgear, and constructability decisions all reward an early start, and a design-build team can price alternatives while the design is still cheap to change.
What does MEP coordination actually prevent?
The classic field conflicts: a duct in the feeder's path, a disconnect that doesn't match the equipment nameplate, a controls run nobody scoped. Because we self-perform the mechanical and electrical scopes, those conflicts get resolved in coordination before fabrication — not discovered by the crews with the building half built.
How much does design-build construction cost compared to bid-build?
There's no honest flat answer, but the cost structure is different in ways that matter: one contract means one markup stack instead of a general contractor marking up every sub; design happens against a live budget, so you find out what things cost before the drawings are done, not at bid day; and self-performed trades remove the coordination contingency subs price in. What drives the number is scope — building type, site work, utility service size, and finish level. Bring us the program and we'll give you a budget you can steer while it's still cheap to change.