Quarterly report · data through 2026-08-15

Tucson Electrical & Remodel Permit Trends — Q3 2026

What the City of Tucson permitted, quarter by quarter, since January 2022 — panel and service upgrades, HVAC changeouts, solar, EV chargers, remodels and additions, tenant improvements, and the electrical code cases opened — computed from the City’s own GIS permit layers with statistics queries, and published with the method. Q3 2026 is quarter to date (1 Jul – 2026-08-15).

Since January 2022

20,630permits issued (residential + commercial)
1,908panel / service upgrade permits
1,169HVAC changeout permits
1,871residential solar permits
93EV charger permits (explicit-language floor)
1,433remodel / addition permits
130commercial tenant-improvement permits
793electrical / wiring code cases opened

The read

The busiest full quarter on record in this window was 2025-Q4 with 1,537 permits. Like-for-like — 1 July to 15 August each year — 2026 is running at 869 permits against 580 in 2025 and 514 in 2024. Panel and service upgrades in the same slice: 50 vs 64 vs 49; HVAC changeouts 58 vs 64 vs 35; solar 65 vs 35 vs 18.

Panel and service upgrades issue fast: the median time from application to issue was 4 days in 2025 (n = 430), 8 days in 2024 (n = 371) and 5 days so far in 2026 (n = 202).

A permit that appears here is strong evidence work was proposed and, where finaled, inspected. Absence from these layers is weak evidence: they cover January 2022 onward, older permits live in the City’s Property Research Online file per parcel, and plenty of work is never permitted at all. Category counts use description keywords (listed in the method) and overlap slightly — do not sum them against the total.

Quarter by quarter

QuarterAll permitsPanel / serviceHVACSolarEVRemodel / additionTenant improvementElec. code cases
2022-Q13382341114668
2022-Q2733892052062613
2022-Q399913820243242119
2022-Q41,22014517234244691
2023-Q11,42313430291143566
2023-Q21,36413593210370785
2023-Q31,2441259172747648
2023-Q41,1171166849644233
2024-Q11,1351105027759247
2024-Q21,2011239651167845
2024-Q3954955646586946
2024-Q4665434562255422
2025-Q1780764366889447
2025-Q21,037857555687432
2025-Q31,364152129821595840
2025-Q41,5371176913311113534
2026-Q11,12860724241291237
2026-Q21,522921338071942652
2026-Q3 (to date)869505865561928

Residential (layer 85) and commercial (layer 81) building permits by issue date; code cases (layer 102) by opened date. The last row is quarter to date through 2026-08-15.

Same slice, three years

1 July to 15 August in each year, so the partial quarter is compared fairly.

Category202420252026
All permits514580869
Panel / service496450
HVAC356458
Solar183565
EV045
Remodel / addition374161
Tenant improvement149
Commercial service / switchgear1121
Elec. code cases261928

Full Q3 for reference: 2024: 954 permits, 95 panel/service, 56 HVAC · 2025: 1,364 permits, 152 panel/service, 129 HVAC.

By City ward, trailing twelve months

2025-08-16 to 2026-08-15. Ward is a field on the permit record itself, so these are exact, not estimated.

WardAll permitsPanel / serviceHVACSolarEVRemodel / addition
Ward 1850614454579
Ward 29758868811387
Ward 3899556733389
Ward 41,0525310786637
Ward 5831505345559
Ward 61,2199858686200

Solar permits that also carried a panel or service upgrade

When the panel upgrade rides inside the solar permit, a separate panel permit never appears — which is why the per-address report reads solar permits for upgrade language.

YearSolar permitsWith upgrade languageShare
20225408515.7%
20236227211.6%
20241863317.7%
20253363410.1%
2026187137%

Method

Source: City of Tucson GIS, PublicMaps/PermitsCode/MapServer layers 85 (residential building permits), 81 (commercial building permits) and 102 (code enforcement cases), read with statistics queries only — counts grouped by year and month, never rows, never description text. Categories are description-keyword filters; the exact clauses are below and in the published dataset (106 requests, generated 2026-08-16). EV counts are a floor (only permits that name the charger explicitly). Solar is WORKCLASS = 'Residential Solar Permit'; the application-stage class is excluded. Panel/service and switchgear share the phrase “service upgrade”; remodel and tenant improvement share “tenant improvement” — categories overlap and are not additive. Medians are found by binary search on counts of (issue date − application date). The layers begin in January 2022; the City’s Property Research Online file holds older permits per parcel.

  • panel: (UPPER(DESCRIPTION) LIKE '%PANEL UPGRADE%' OR UPPER(DESCRIPTION) LIKE '%MPU%' OR UPPER(DESCRIPTION) LIKE '%SERVICE UPGRADE%' OR UPPER(DESCRIPTION) LIKE '%ELECTRICAL UPGRADE%' OR UPPER(DESCRIPTION) LIKE '%ELECTRIC UPGRADE%' OR UPPER(DESCRIPTION) LIKE '%SERVICE CHANGE%')
  • hvac: (UPPER(DESCRIPTION) LIKE '%HVAC%' OR UPPER(DESCRIPTION) LIKE '%CHANGE OUT%' OR UPPER(DESCRIPTION) LIKE '%CHANGEOUT%' OR UPPER(DESCRIPTION) LIKE '%HEAT PUMP%' OR UPPER(DESCRIPTION) LIKE '%AIR CONDITION%' OR UPPER(DESCRIPTION) LIKE '%A/C%')
  • solar: WORKCLASS='Residential Solar Permit'
  • ev: (UPPER(DESCRIPTION) LIKE '%EV CHARG%' OR UPPER(DESCRIPTION) LIKE '%ELECTRIC VEHICLE%' OR UPPER(DESCRIPTION) LIKE '%EVSE%')
  • remodel: (UPPER(DESCRIPTION) LIKE '%REMODEL%' OR UPPER(DESCRIPTION) LIKE '%ADDITION%' OR UPPER(DESCRIPTION) LIKE '%RENOVAT%' OR UPPER(DESCRIPTION) LIKE '%TENANT IMPROVEMENT%' OR UPPER(DESCRIPTION) LIKE '%ADU%' OR UPPER(DESCRIPTION) LIKE '%CASITA%' OR UPPER(DESCRIPTION) LIKE '%GUEST HOUSE%')
  • codeElectrical: (UPPER(DESCRIPTION) LIKE '%ELECTRIC%' OR UPPER(DESCRIPTION) LIKE '%WIRING%')
  • ti: (UPPER(DESCRIPTION) LIKE '%TENANT IMPROVEMENT%' OR UPPER(DESCRIPTION) LIKE '%T.I.%' OR UPPER(DESCRIPTION) LIKE '% TI %')
  • switchgear: (UPPER(DESCRIPTION) LIKE '%SWITCHGEAR%' OR UPPER(DESCRIPTION) LIKE '%SERVICE UPGRADE%' OR UPPER(DESCRIPTION) LIKE '%SWITCHBOARD%' OR UPPER(DESCRIPTION) LIKE '%MDP%')

Cite as: Arizona Electrical Solutions, “Tucson Electrical & Remodel Permit Trends — Q3 2026,” 2026-08-16, https://www.aztucsonelectricalsolutions.com/tucson-permit-report-2026-q3/. Reuse of the numbers with attribution is welcome; questions to (520) 308-6235.

Use it on one address

The same layers, plus the City’s per-parcel file, Pima County and Oro Valley, read for any Pima County address: parcel, year built, permit history with official links, code cases and what each system’s record implies.