Do you install residential solar?
No. We are a commercial, industrial, institutional, and municipal contractor. Commercial rooftop, carport, and ground systems, storage, and EV charging are our work; residential rooftop solar is a different market with different economics.
Do you handle the TEP or Trico interconnection?
Yes. We run the interconnection application and design coordination, build the service and metering to the utility's construction standards, and schedule and attend the inspection and witness testing required before the system can operate. We keep a TEP standards reference hub because we deal with these requirements weekly.
What is TEP's DGIR, and does it apply to my project?
The DGIR is Tucson Electric Power's set of interconnection requirements for distributed generation — the rules any solar or battery system operating in parallel with TEP's grid is designed, reviewed, and tested against. If your system can run in parallel with the utility, it applies; Trico runs its own equivalent process for its cooperative territory. We keep the working references on our TEP standards hub and design to them from the first drawing.
How long does a commercial solar project take?
The construction is usually the shorter half. Utility interconnection review, permitting, and approval to operate frequently drive the calendar more than procurement or installation do, which is why we start the utility process as early as the design allows.
Should we add battery storage?
It depends on your rate structure and load profile. Storage earns its cost by shaving peak demand, shifting energy, or backing up critical loads — sometimes all three. We look at your actual usage before recommending it, rather than selling batteries by default.
How do you size a commercial battery system?
From your load profile, not the battery's nameplate. We start with utility interval data — how deep and how long your demand peaks actually run — and the short list of loads that genuinely must ride through an outage. Those two numbers set the power and energy ratings; the spec sheet comes last. A battery sized from a brochure is usually too big for the bill savings and too small for the backup.
What safety codes apply to commercial battery storage?
The core requirements are UL 9540 listing for the storage system itself, UL 9540A fire-test data where the fire code asks for it, NEC Article 706 for the electrical installation, and fire-code separation rules governing where units can sit relative to buildings, openings, and each other. We settle those clearances with the fire authority before equipment is ordered — relocating a battery after the pad is poured is nobody's idea of value engineering.
Are there incentives or tax credits for commercial solar in Arizona?
Incentive programs and federal tax provisions exist and change. We confirm current utility offerings during design and provide the documentation a claim requires — but the tax treatment of your project is a question for your CPA or tax advisor, not your electrical contractor.
Does battery storage qualify for the federal investment tax credit?
Federal credit provisions cover commercial energy storage as well as solar, and utility incentives are sometimes available on top — but values, eligibility rules, and documentation requirements change with legislation and program cycles. We provide the equipment listings and cost documentation a claim requires; confirm the current credit values and your project's eligibility with your CPA or tax advisor before counting them in the budget, then request a bid for hard numbers on the construction side.
Can you install EV chargers as part of the same project?
Yes, and it is usually cheaper to do it at the same time. We are a Tesla Certified Installer for EV charging equipment, and chargers, solar, and site lighting frequently share the same service capacity and the same trench — see commercial EV charging.