Electrical permit history — 2822 S Bonanza Av

2822 S Bonanza Av, Tucson — built 1978, with 4 permits on record. Review electrical, HVAC and remodel history with links to official records.

Home

2822 S Bonanza Av

Built 1978 — FPE/Zinsco panel era · HVAC 2024 (finaled)

Parcel
136124000
Built
1978 (county record)
Jurisdiction
Tucson
Zoning
R-1
Assessor use
Sfr Grade 010-3 Urban Subdivided
Parcel size
0.22 acres
Living area
1,424 sq ft (assessor record)
Cooling
Evaporative (assessor record)
Heating
Forced Air (assessor record)
Roof
Built Up (assessor record)
Garage
Carport (2-car) (assessor record)
Sewer
No connection on file (sewer or septic status not confirmed by the record — verify on site)
Flood zone
X — minimal flood hazard (FEMA)
Historic preservation
Not on file (City of Tucson HP layers)
Typical original service for a 1978 home
approximately 100–150 A

See the property

County aerial photograph centered on 2822 S Bonanza Av, parcel outlined

Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.

Is it time to upgrade?

  • Electrical service & panelNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2024 residential building - one or two family permit is on file — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not tell you the service is original — only that nothing has been permitted here recently. The build year is the better clue, and it is above.
  • Heating & coolingCurrentLast permitted 2024 (2 years ago). City inspection record: RSBU - Building Final approved 2025-03-12. The assessor records cooling as Evaporative and heating as Forced Air (assessor characteristics can lag permitted work). Cooling equipment works harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. TC-RES-0624-03423 — CE-VIO0524-02027 1. Remove existing roof Sheathing. No beams or rafter have been removed. 2. Remove existing plywood. 3. Install new plywood; approx. 75 sheets. (PLYWOOD WILL BE PROVIDED BY CUSTOMER) 4. Replace ALL fascia board. 5. Remove cooler/A/C unit for proper re-roofing and set it back, if applies. 6. Furnish and install a 75lb fiberglass base sheet and two layers #16lb of type IV fiberglass, finishing felts with hot asphalt in between each layer. 7. At damaged tail beam, install 2"X 12" block on top OR two blocks at side. 8. Install new 2in x 2in galvanized metal edge. 9. Seal all pipes and projections with APOC 264 Flash N Seal and t-tex fiber. 10. Apply fiber emulsion #293. 11. Apply two coats of Acrylic elastomeric #7000-3R white or desert tan paint color. 12. Clean area of roofing debris and remove from the premises unless otherwise specified. 13. Furnish four year warranty against leaks. We are not liable for any interior damage a leak may cause should one occur under warranty period/re-occur for leak related work.
  • Water heaterNot in this windowNothing in the permit records we read for this parcel that names this system. Water heaters are frequently swapped without a permit, so this line is especially weak evidence either way.
  • RoofCurrentLast permitted 2024 (2 years ago). The assessor records the roof as Built Up. TE-FPU-1124-00422 — Hot tar roof replacement
  • Plumbing work on recordNot in this windowNothing in the permit records we read for this parcel that names this system. Unremarkable — plenty of buildings never need a permitted plumbing repair.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Era-based check — high priority

    Federal Pacific Stab-Lok and Zinsco/Sylvania panels were still being installed into the 1980s. Both have documented failure-to-trip histories, by different routes: Stab-Lok breakers fail internally — the trip mechanism jams or sits out of calibration — while Zinsco breakers can weld to the bus, so the handle moves but the circuit stays live. Neither is fixed by a replacement breaker, which is why the panel is what gets replaced. The permit record does not confirm this; an on-site inspection is required.

  • Era-based check

    100–150 A was typical. Workable for the original house, tight once you add EV charging or electric heat. The permit record does not confirm this; an on-site inspection is required.

Most recent permit on record for this parcel: 2024-11-27 (TE-FPU-1124-00422) — Hot tar roof replacement.

Permit history (4)

Permit history for this parcel — 4 of 4 records
DateRecordWhatStatusValue
2024-11-27finaledTE-FPU-1124-00422City permit recordFloodplain UseHot tar roof replacementComplete
2024-06-06finaledTC-RES-0624-03423City permit recordResidential Building - One or Two FamilyCE-VIO0524-02027 1. Remove existing roof Sheathing. No beams or rafter have been removed. 2. Remove existing plywood. 3. Install new plywood; approx. 75 sheets. (PLYWOOD WILL BE PROVIDED BY CUSTOMER) 4. Replace ALL fascia board. 5. Remove cooler/A/C unit for proper re-roofing and set it back, if applies. 6. Furnish and install a 75lb fiberglass base sheet and two layers #16lb of type IV fiberglass, finishing felts with hot asphalt in between each layer. 7. At damaged tail beam, install 2"X 12" block on top OR two blocks at side. 8. Install new 2in x 2in galvanized metal edge. 9. Seal all pipes and projections with APOC 264 Flash N Seal and t-tex fiber. 10. Apply fiber emulsion #293. 11. Apply two coats of Acrylic elastomeric #7000-3R white or desert tan paint color. 12. Clean area of roofing debris and remove from the premises unless otherwise specified. 13. Furnish four year warranty against leaks. We are not liable for any interior damage a leak may cause should one occur under warranty period/re-occur for leak related work.Complete
2002-08-20expired 2004-03-16T02PL01524City permit recordPLUMBINSTALL:NEW GAS LINE/RELOCATE METERExpired
2002-08-15finaledT02ME00564City permit recordMECHREPLACE:SPLIT SYSTEM (APA)Final

How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.

Code enforcement (2)

Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.

Code enforcement history for this parcel — 2 of 2 records
DateRecordWhatStatus
2024-05-29CE-VIO0524-02027Code enforcement caseWork without permitClosed - resolved
2007-05-23T07DV04724Code enforcement caseVegetationCancel

Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.

Planning work at this home?

Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this report was built

This is a reading of public records for parcel 136124000 — 4 permits on file from 2002 to 2024 (1 floodplain use, 1 residential building - one or two family, 1 plumb, 1 mech) and 2 code enforcement cases — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-17; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.

The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.