Electrical permit history — 530 S Placita Quince

530 S Placita Quince

  • Electrical service: panel or service replaced in 2021 (200 A per the permit), passed final inspection.
  • Watch for: built 1977, before GFCI outlets were required at kitchen counters. Worth testing them.
  • Other work on record: heat pump replaced 2013.

From City of Tucson permits and the Pima County Assessor, checked 13 Nov 2026. Not an inspection.

I am a
Get a free panel check

Is it time to upgrade?

Probably not: the 2021 permit shows 200 A of service, and it passed final inspection.

  • Electrical service & panelLooks currentPanel or service replaced under a 2021 permit that passed final inspection (200 A per the permit). The label in your panel is the final word. T21CM05225 — Install 200 amp electrical service in place of existing.
  • Heating & coolingWorth checkingLast permitted 2013 (13 years ago) — the permit passed final inspection. The assessor records cooling as Refrigeration and heating as Forced Air. Cooling equipment works harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. T13ME00080 — Replacement of 2 Split Heat Pump Systems. 4 Ton and 2 Ton
  • Water heaterWorth checkingNo permit on record names this system. Water heaters are frequently swapped without a permit, so this line is especially weak evidence either way.
  • RoofWorth checkingNo permit on record names this system. The assessor records the roof as Built Up.

What to check at the panel

These are the things only someone standing at the panel can settle — about a minute’s work. Check them against the 200 A the 2021 permit describes.

  1. The number stamped on the main breaker handle. The 2021 permit describes 200 A; the handle and the panel label are the final word.
  2. The busbar rating printed on the panel label. It is a different number from the main breaker, and it is the one that decides how much solar a panel can take under the 120% rule.
  3. The manufacturer and catalog number on the label inside the door.
  4. How many full-size spaces are left, how many positions the label permits a tandem breaker in, and the tandem limit the label states. A full panel is a different job from a full service.
  5. The conductor material at the main lugs, and whether the terminations look clean and tight.
  6. Whether there is a separate meter-main outside as well as the panel indoors — that changes where a disconnect and any new feeder would land.
  7. Whether the water heater, dryer and range are gas or electric. No public record carries fuel type, and it is the single biggest variable in a load calculation — it can move the calculated load on the same house by more than 40 A.
  8. The brand on the door or the breaker faces. Federal Pacific panels usually read “Federal Pacific Electric” or “FPE”; Zinsco panels read “Zinsco”, or on later stock “Sylvania” or “Sylvania-Zinsco”. Finding a Square D, Eaton, Cutler-Hammer, Siemens or GE panel here is the ordinary result and is not a finding — those are current, supported lines with breakers on the shelf.
  9. Whether the kitchen counter, bathroom, garage and exterior receptacles have GFCI protection, and whether the test button actually trips them.

With those in hand you can run the numbers yourself. The load calculator does the NEC 220.82 optional-method calculation — the same method a permit application uses — and shows its work. It offers to start from the 2,239 sq ft on the assessor record; every other value is yours to enter. Open the load calculator

What these jobs cost here

Panel or service replaced under a 2021 permit that passed final inspection (200 A per the permit) — an upgrade is not the job here.

Air conditioning or heat pump replacement Estimate

$15,400

Most jobs like this land between $12,400 and $19,500.

Priced from a 4-ton split heat pump on the 2013 permit T13ME00080 (passed final inspection), so the replacement is priced like for like; cooling on the assessor record reads “Refrigeration”; City of Tucson permit fee.

What would move this price
  • Only if the duct has to be replaced — no record carries its condition, and on an attic system at this age it is a real possibility +$10,300

If every one of those turned out to apply, this becomes about $29,800. That is the worst realistic case.

  • Because a permit names the size, this is priced at that size rather than from floor area. Worth asking whether that size was ever right: a Manual J often comes out smaller, and a correctly sized machine costs less and behaves better in the monsoon.
Before you spend anything
  • If someone quotes you “just the outside unit” on a system installed between about 2010 and 2024, stop. New condensers use R-454B or R-32; an R-410A indoor coil cannot be matched to one unless the manufacturer publishes that exact combination with a mitigation kit. The honest options are to find remaining pre-2025 R-410A stock — still legal to install, but scarce, and it still has to meet the Arizona efficiency floor — or to replace both halves as a matched system.
  • If you are told a heat pump means you need a 200 A service, ask which load. It is almost never the compressor — a 5-ton outdoor unit is about a 31 A circuit. It is the electric BACKUP HEAT STRIP, which on a large kit can be a 109 A circuit on its own. In Tucson's mild heating season the strip kit can often be sized far smaller, or left out, and the service question disappears with it.
  • Equipment here lasts ten to fourteen years, not the fifteen to twenty you will read nationally — a rooftop package unit at the short end. Replace rather than repair if the unit is twelve or more and the repair is over $1,500, if the compressor has failed and it is eight or more, or if the repair is over 40% of a new system.

The label in your panel is the final word; the permit on record is T21CM05225. If you need more circuits rather than more service, a subpanel is the far cheaper job.

What the record cannot tell us
  • The duct. No record carries its condition, and on a Tucson house with duct in an unconditioned attic it is often worth more than a bigger machine.
  • Whether that floor area is all conditioned space. An assessor figure can include a garage, an enclosed porch or an addition that was never cooled, and every square foot of that oversizes the equipment this page priced.

Price it for your house — change the assumptions (the panel’s location, the duct, the tonnage, whether the service is overhead or underground) and watch the number move.

Solar potential

The county’s building-footprint layer maps ≈ 3,759 sq ft of roof plan area here. In Tucson a rooftop array produces about 1,645 kWh per installed kW per year (PVWatts), so a typical 6–8 kW home system fits on a fraction of that roof and makes roughly 10,000–13,000 kWh a year. TEP credits exported surplus at its RCP rate — about 5¢/kWh for new applications, locked for 10 years — so sizing to the home’s own use matters more than filling the roof. Already have panels? Check whether they were permitted and finaled.

Flood and drainage

The federal flood map and the local one are not the same map, and they do not always agree. FEMA’s is the insurance map; the City of Tucson regulates against its own, and that is the one a permit here is judged against.

The record behind this read

Parcel
133381740
Year constructed
1977 (county record)
Permitting authority
Tucson
Zoning
RX-1
Living area
2,239 sq ft
Cooling
Refrigeration
Heating
Forced Air
Electrical service
Panel or service replaced under a 2021 permit that passed final inspection (200 A per the permit). The label in your panel is the final word.

Living area, cooling and heating come from the Pima County Assessor’s file published 28 Jan 2026. Check any row against Pima County’s own parcel record ↗.

What this means for work here

The most recent permit with evidence of issuance is dated 2021. City records show the permit was finalized. The permit covers only the work described in that record.

What that reading rests on. The issuing offices hold 2 building permits for this parcel dated between 2013 and 2021. Two trade permits. All 2 carry a final inspection. There is 1 code-enforcement case recorded against the parcel, all of them closed. We do not reproduce complaint text — it routinely names people with no connection to the property.

Go straight to the records

Each link opens the issuing office’s own file for that record — dates, scope, status and inspections are theirs to publish, and they are all on the other side of these links.

Permit records courtesy of the City of Tucson — each link opens the City’s own file. The files are held by City of Tucson permit record (PRO) ↗ — search the parcel number 133381740.

See an error? Report a correction · About this data.

Utility and upgrade pathElectric service here is Tucson Electric Power (TEP). A service or panel upgrade needs a TEP meter release and has to meet TEP’s service requirements — meter height and location, clearances, and the point of attachment. See TEP new-service requirements and the TEP standards notes.

In the public record: All homes in 85748 · Homes by ZIP code · Commercial property in 85748 · Permit data by neighborhood

Planning work at this home?

Arizona Electrical Solutions — electrical, HVAC, underground, design-build and general contracting in Tucson (four Arizona ROC licenses). The address, parcel and this report travel with your request.

Get a free panel check

Want a plain-English brief of this record first?

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this property compares nearby

Built in 1977 — earlier than about 77% of the 7,459 homes in ZIP 85748. 2,239 sq ft of living area — above this ZIP’s median of 1,792 sq ft. About 16% of homes in this ZIP still cool with evaporative — this one has moved to refrigeration cooling. Properties on S PLACITA QUINCE hold 19 City permits on record, 3 of them since 2022.

Counts and years from the same public records.

How this report was built

This is a reading of public records for parcel 133381740 — 2 City permits on file from 2013 to 2021 and 1 code enforcement case — assembled from the Pima County parcel file and the City of Tucson’s published permit layers together with the City’s own migrated permit archive. City of Tucson permit records go back to the mid-1990s, with fewer before 2006, when the City’s older paper files were only partly digitized. The construction year, living area, cooling, heating, roof and walls on this page come from our saved copy of the Assessor’s own published data file (dated 28 Jan 2026). The sewer connection file and the flood map were not read for this snapshot. A permit that is absent here may predate the digitized record or sit in a system this snapshot did not read. This record was built 22 Sep 2026 and compared against the City’s 13 Nov 2026 permit export, with no change for this parcel.

What this report is and is not. This is a screening report written by Arizona Electrical Solutions from public records — the year the building went up, how it is classified and what has been permitted. It is not an inspection, an appraisal, a floodplain determination, or engineering, legal or purchasing advice, and nothing in it confirms what is installed at this address: a permit shows what was permitted, a missing permit does not mean nothing was done, and era notes describe what was common when the building went up, not what is in this one. Price figures are estimates, not quotes. The issuing agency’s own record is the official one and controls over anything summarized here — every permit links to it. Only someone looking at the panel can confirm the service size, the panel brand or the wiring.

Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.