Electrical permit history — 5114 E Ferry Dr

5114 E Ferry Dr, Tucson — built 1972, with 1 permit on record. Review electrical, HVAC and remodel history with links to official records.

Home

5114 E Ferry Dr

Built 1972 — aluminum branch-wiring era · last permitted panel/service work 2024 (permitted, completion not confirmed)

Parcel
131051240
Built
1972 (county record)
Jurisdiction
Tucson
Zoning
R-1
Assessor use
Sfr Grade 010-3 Urban Subdivided
Parcel size
0.18 acres
Living area
1,417 sq ft (assessor record)
Cooling
Refrigeration (assessor record)
Heating
Forced Air (assessor record)
Roof
Built Up (assessor record)
Garage
Garage\Carport (3-car) (assessor record)
Sewer
Connection on file (1971) (county sewer connection records)
Flood zone
X — minimal flood hazard (FEMA)
Historic preservation
Not on file (City of Tucson HP layers)
Typical original service for a 1972 home
approximately 100 A
Service on record
A 2024 permit was issued; completion is not confirmed in the available record; the permit description states “PV SOLAR INSTALLATION / MAIN PANEL UPGRADE 225A” — an increase in capacity as described, not a confirmed installed rating.

See the property

County aerial photograph centered on 5114 E Ferry Dr, parcel outlined

Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.

Is it time to upgrade?

  • Electrical service & panelPermitted — completion not confirmedA 2024 permit specifies this work (the permit description states “PV SOLAR INSTALLATION / MAIN PANEL UPGRADE 225A”), but the available record does not show a final inspection. The work was permitted, but final completion is not confirmed. Official status: Inspections. City inspection record: COT - RSOL - Electrical Final Solar Project approved 2024-10-03. TC-RES-0524-02942 — PV SOLAR INSTALLATION / MAIN PANEL UPGRADE 225A
  • Heating & coolingNot in this windowNothing in the permit records we read for this parcel that names this system. The assessor records cooling as Refrigeration and heating as Forced Air. Cooling equipment works harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes.
  • Water heaterNot in this windowNothing in the permit records we read for this parcel that names this system. Water heaters are frequently swapped without a permit, so this line is especially weak evidence either way.
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. The assessor records the roof as Built Up.
  • Plumbing work on recordNot in this windowNothing in the permit records we read for this parcel that names this system. Unremarkable — plenty of buildings never need a permitted plumbing repair.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Era-based check — high priority

    This is the aluminum branch-circuit window (roughly 1965–1973). Solid aluminum on 15/20 A circuits is a recognized fire hazard at the terminations and needs approved repair — COPALUM or AlumiConn, not a wire nut. The permit record does not confirm this; an on-site inspection is required.

  • Era-based check — high priority

    Federal Pacific (Stab-Lok) and Zinsco/Sylvania panels were sold through this period. Stab-Lok breakers have a documented history of failing to trip internally; Zinsco breakers can weld to the bus so the handle moves without breaking the circuit. In both cases a replacement breaker does not resolve it — the panel itself is what gets replaced. The permit record does not confirm this; an on-site inspection is required.

  • Era-based check

    100 A was typical. Adding an EV charger, heat pump, or casita usually forces a service upgrade first. The permit record does not confirm this; an on-site inspection is required.

Recorded sales (4)

Recorded transfers from the Pima County Assessor — 4 of 4
DatePriceType
2022-07-25$309,900Warranty Deed
2020-03-03$183,000Warranty Deed
2018-05-29$160,000Warranty Deed
2003-07-09$114,500Joint Tenancy Deed

Recorded sales are the sales the Pima County Assessor has on file from affidavits of property value — not every transfer, not listings, and not a valuation. Parties are never shown here. A sale with no permitted electrical work since is worth knowing before the next sale or a remodel.

Most recent permit on record for this parcel: 2024-05-14 (TC-RES-0524-02942) — PV SOLAR INSTALLATION / MAIN PANEL UPGRADE 225A.

Permit history (1)

Permit history for this parcel — 1 of 1 records
DateRecordWhatStatusValue
2024-05-14expired 2025-04-01TC-RES-0524-02942City permit recordSolar PVPV SOLAR INSTALLATION / MAIN PANEL UPGRADE 225AInspections

How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.

Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.

Planning work at this home?

Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this report was built

This is a reading of public records for parcel 131051240 — 1 permit on file from 2024 to 2024 (1 solar pv) — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-17; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.

The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.