Electrical permit history — 1922 E 8th St
1922 E 8th St, Tucson — built 1945, with 6 permits on record. Review electrical, HVAC and remodel history with links to official records.
Electrical Property Screening Report · Home
1922 E 8th St
A screening report for electrical planning, assembled from public-record indicators. It is not an official record and every figure in it should be verified against the issuing agency before it is relied on.
Verify parcel data at official source ↗
Built 1945 — pre-1950 knob-and-tube era · last permitted panel/service work 2020 (finaled)
Permanent link: Electrical permit history for 1922 E 8th St (aztucsonelectricalsolutions.com/property/129040040/1922-e-8th-st-tucson-az-85719) · Public records last checked 2026-08-19
Public record indicators for electrical planning
- Parcel
- 129040040
- Year constructed
- 1945 (county record)
- Permitting authority
- Tucson
- Zoning
- R-1
- Lot size
- 0.14 acres
- Sewer
- Connection on file (1941) (county sewer connection records)
- Flood zone
- X — minimal flood hazard (FEMA)
- Historic preservation
- Sam Hughes Residential Historic District — National Register district (City of Tucson)
- Estimated electrical service era
- approximately 30–60 A (estimated from the year built, 1945 — not a measurement; verify on site)
- Service on record
- City records show the 2020 permit was finalized; the permit description states “200 AMPS electric service upgrade vh” — an increase in capacity as described, not a confirmed installed rating.
See the property
Satellite imagery © Google. Imagery can predate recent work and shows nothing about what is inside — context, not evidence.
Flood and drainage
The federal flood map and the local one are not the same map, and they do not always agree. FEMA’s is the insurance map; the City of Tucson regulates against its own, and that is the one a permit here is judged against.
- FEMA: FEMA flood zone X — minimal flood hazard, not a Special Flood Hazard Area. FIRM panel 04019C2277L, effective 2011-06-16. Open this property on FEMA’s official flood map ↗
- Local floodplain (the City of Tucson): local floodplain mapping is not reproduced here. A property can sit outside FEMA’s zone and still be inside a locally regulated floodplain, floodway, sheet-flooding area or erosion hazard setback, so check the authority’s own map before planning work. Pima County RFCD flood hazard map for parcel 129040040 ↗ · the City of Tucson ↗
Is it time to upgrade?
- Electrical service & panelFinaled permit foundLast permitted 2020 (6 years ago). City inspection record: ELECTRIC - FINAL approved 2020-01-27. Contractor of record: WINKLE ELECTRIC. The permit describes an increase in capacity, which is the single best sign the electrical has actually been brought forward. T20EL00012 — 200 AMPS electric service upgrade vh
- Heating & coolingNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2020 combo permit is on file — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Cooling equipment works harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes.
- Water heaterNot in this windowNothing in the permit records we read for this parcel that names this system. Water heaters are frequently swapped without a permit, so this line is especially weak evidence either way.
- RoofNot in this windowNothing in the permit records we read for this parcel that names this system.
- Plumbing work on recordNot in this windowNothing in the permit records we read for this parcel that names this system. Unremarkable — plenty of buildings never need a permitted plumbing repair.
A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitized. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.
What that usually means electrically
- Era-based check
A finaled 2020 panel/service permit is on record for this parcel, which makes it unlikely the original 30–60 A equipment is still in place. That is a permit record, not an inspection — verify the installed rating and the panel brand on site before sizing anything new. The permit record does not confirm this; an on-site inspection is required.
- Era-based check — high priority
Knob-and-tube wiring may still be present in original, un-remodeled areas. It has no ground and is not rated for modern loads or insulation contact. The permit record does not confirm this; an on-site inspection is required.
- Era-based check — high priority
Branch circuits from this era are typically ungrounded two-wire — the reason you see two-prong outlets or ungrounded three-prong replacements. The permit record does not confirm this; an on-site inspection is required.
What to check at the panel
Everything above is read off public records. These are the things only someone standing at the panel can settle, and they take about a minute. Check them against the rating the permit above describes rather than against the era — the permit is the better evidence, and neither one is an inspection.
- The number stamped on the main breaker handle — 100, 125, 150, 175 or 200. That is the service rating, and no record on this page confirms it.
- The busbar rating printed on the panel label. It is a different number from the main breaker, and it is the one that decides how much solar a panel can take under the 120% rule.
- The manufacturer and catalog number on the label inside the door.
- How many full-size spaces are left, how many positions the label permits a tandem breaker in, and the tandem limit the label states. A full panel is a different job from a full service.
- The conductor material at the main lugs, and whether the terminations look clean and tight.
- Whether there is a separate meter-main outside as well as the panel indoors — that changes where a disconnect and any new feeder would land.
- Whether the water heater, dryer and range are gas or electric. No public record carries fuel type, and it is the single biggest variable in a load calculation — it can move the calculated load on the same house by more than 40 A.
- Whether any knob-and-tube is still live where it is visible — in the attic, the basement or a crawlspace — and whether insulation has been laid over it.
- Whether receptacles are two-prong, and whether any three-prong replacements have an actual ground behind them. A $10 tester answers this at every outlet.
- Whether the kitchen counter, bathroom, garage and exterior receptacles have GFCI protection, and whether the test button actually trips them.
With those in hand you can run the numbers yourself. The load calculator does the NEC 220.82 optional-method calculation — the same method a permit application uses — and shows its work.
The most recent permitted work on this parcel was in 2026. That says the parcel was worked on under permit, not what the work covered — a roof, a pool or a changeout tells you nothing about the electrical service. Work done without a permit leaves no trace here at all.
What this means for work here
Informational public-record summary — not engineering, inspection, valuation or purchasing advice, and not the official record.
The most recent permitted work on this parcel was in 2026. That says the parcel was worked on under permit, not what the work covered — a roof, a pool or a changeout tells you nothing about the electrical service. Work done without a permit leaves no trace here at all.
What that reading rests on. The issuing offices hold 6 building permits for this parcel dated between 2020 and 2026. By category the work is addition / alteration, solar pv and fence / wall. 3 of them carry a final inspection; the other 3 were issued, expired or are still open, which is not the same as work completed. There are 3 code-enforcement cases recorded against the parcel, all of them closed. We do not reproduce complaint text — it routinely names people with no connection to the property.
Go straight to the records
Each link opens the issuing office’s own file for that record — dates, scope, status and inspections are theirs to publish, and they are all on the other side of these links.
City permit record (6): 2026 TC-RES-0526-02821 · 2022 T22CM01335 · 2021 T21RW04281 · 2020 T20CM05817 · 2020 T20CM01429 · 2020 T20EL00012
Code enforcement cases (3): 2013 T13DV04492 · 2009 T09DV02366 · 2008 T08DV01221
Read the records yourself. We republish selected facts and record numbers so you can find the file; the issuing agency’s record controls. The files are held by City of Tucson permit record (PRO) ↗ — search the parcel number 129040040. Permit and parcel information courtesy of the City of Tucson and Pima County; their files are the official record and control over anything summarized here.
This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.
Utility and upgrade pathElectric service here is Tucson Electric Power (TEP). A service or panel upgrade needs a TEP meter release and has to meet TEP’s service requirements — meter height and location, clearances, and the point of attachment. See TEP new-service requirements and the TEP standards notes.
In the public record: All homes in 85719 · Homes by ZIP code · Commercial property in 85719 · Permit data by neighborhood
Planning work at this home?
Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
The permanent link and the summary above, sent once. No list.One email when a new permit, inspection result or code case appears on this parcel — nothing else, and you can stop any time. No list.
What the flood note is not. The flood zone shown is FEMA’s National Flood Hazard Layer — the federal insurance map. Local floodplain mapping is not reproduced here; use the authority’s own map, linked above. Nothing here is a floodplain determination, an elevation certificate, or a substitute for one. A parcel can straddle a boundary, and a Letter of Map Amendment can remove a structure the map still covers. For a determination, ask the floodplain administrator for the jurisdiction named above; for a design that has to satisfy one, that is work we do.
How this report was built
This is a reading of public records for parcel 129040040 — 6 permits on file from 2020 to 2026 (1 addition / alteration, 1 solar pv, 1 fence / wall, 1 combo) and 3 code enforcement cases — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-19; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.
The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).
Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.