Electrical permit history — 105 E Mohave Rd

105 E Mohave Rd, Tucson — built 1941, with 9 permits on record. Review electrical, HVAC and remodel history with links to official records.

Home

105 E Mohave Rd

Built 1941 — pre-1950 knob-and-tube era · last permitted panel/service work 2023 (permitted, completion not confirmed)

Parcel
10603031C
Built
1941 (county record)
Jurisdiction
Tucson
Zoning
R-3
Assessor use
Sfr Grade 010-3 Urban Subdivided
Parcel size
0.33 acres
Living area
1,084 sq ft (assessor record)
Cooling
Refrigeration (assessor record)
Heating
Forced Air (assessor record)
Roof
Prepared Roll (assessor record)
Sewer
Connection on file (1958) (county sewer connection records)
Flood zone
AE — Special Flood Hazard Area (FEMA)
Historic preservation
Not on file (City of Tucson HP layers)
Typical original service for a 1941 home
approximately 30–60 A
Service on record
A 2023 permit was issued; completion is not confirmed in the available record; the permit description states “Main panel upgrade form 100A all in one to 200A all in one” — an increase in capacity as described, not a confirmed installed rating.

See the property

County aerial photograph centered on 105 E Mohave Rd, parcel outlined

Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.

Is it time to upgrade?

  • Electrical service & panelPermitted — completion not confirmedA 2023 permit specifies this work (the permit description states “Main panel upgrade form 100A all in one to 200A all in one”), but the available record does not show a final inspection. The work was permitted, but final completion is not confirmed. Official status: Issued. City inspection record: COT - RSEL - Electrical Final approved 2023-06-21. TC-RES-0123-02079 — Main panel upgrade form 100A all in one to 200A all in one
  • Heating & coolingNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2024 solar pv permit is on file (and 1 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. The assessor records cooling as Refrigeration and heating as Forced Air. Cooling equipment works harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes.
  • Water heaterNot in this windowNothing in the permit records we read for this parcel that names this system. Water heaters are frequently swapped without a permit, so this line is especially weak evidence either way.
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. The assessor records the roof as Prepared Roll.
  • Plumbing work on recordNot in this windowNothing in the permit records we read for this parcel that names this system. Unremarkable — plenty of buildings never need a permitted plumbing repair.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Era-based check — high priority

    Knob-and-tube wiring may still be present in original, un-remodeled areas. It has no ground and is not rated for modern loads or insulation contact. The permit record does not confirm this; an on-site inspection is required.

  • Era-based check — high priority

    Original services this age were 30–60 A fuse panels. Nearly every one still in place is undersized for a modern household. The permit record does not confirm this; an on-site inspection is required.

  • Era-based check — high priority

    Branch circuits from this era are typically ungrounded two-wire — the reason you see two-prong outlets or ungrounded three-prong replacements. The permit record does not confirm this; an on-site inspection is required.

  • Worth confirming

    Solar was permitted here in 2024. That means there is an existing interconnection, and the main breaker and busbar rating already carry a PV backfeed — so anything else you add (an EV charger, a heat pump) has to be checked against what is left under the 120% rule, not against the service size alone.

Recorded sales (1)

Recorded transfers from the Pima County Assessor — 1 of 1
DatePriceType
2001-01-12$87,000Warranty Deed

Recorded sales are the sales the Pima County Assessor has on file from affidavits of property value — not every transfer, not listings, and not a valuation. Parties are never shown here. A sale with no permitted electrical work since is worth knowing before the next sale or a remodel.

Most recent permit on record for this parcel: 2024-09-17 (TE-FPU-0924-00293) — Due to the fact that this project is within a regulated floodplain and requires a Floodplain Use Permit (FUP.), we have moved this project into a standard 30 Day Review Time Frame. Please start a new FUP at our permit application web page: https://tdc-online.tucsonaz.gov/#/home NOTE: Documentation of a cost estimate will be required for solar installations. The cost estimate must have a cost breakdown, it must include both the cost of materials and the cost of labor, and it may not be a leasing document. Instructions: 1. Navigate into the current project in the “My Work” tab. Within the permit, navigate to the “Sub-Records” tab and click “Apply” on the Floodplain Use Permit Sub-Record 2. Locations -> Confirm the location is accurate to the project. Click “Next” 3. Type -> Fill in the “Square Feet” and “Valuation” boxes with the project area and a contractor-provided cost estimate (See note above: for new structures, input 0). Click “Next” 4. Contacts -> Confirm contacts and add any additional contacts if applicable. Click “Next” 5. More Info -> This will be filled in by the engineer assigned to your case, Click “Next” 6. Attachments -> Please attach the project plan, supporting documentation for the cost estimate (if applicable), and a drainage/hydrology report (if applicable). Click “Next” 7. Signature -> Read the statement and type your name. Sign your name below (You may Enable Type Signature to have the software sign for you.) Click “Next” 8. Review and Submit -> Review all information to ensure accuracy. Click “Submit” Contact Michael Ortiz at michael.ortiz@tucsonaz.gov if you have any questions about the FUP. Approval ID: SA20240815-9-1069-7097-A 9.315 kW DC/ 7.475 kW AC PV SYSTEM (23) SEG SOLAR-405-BMD-TB MODULES (23) ENPHASE ENERGY IQ8M-72-2-US INVERTERS.

Permit history (9)

Permit history for this parcel — 8 of 9 records
DateRecordWhatStatusValue
2024-09-17TE-FPU-0924-00293City permit recordSolar PVDue to the fact that this project is within a regulated floodplain and requires a Floodplain Use Permit (FUP.), we have moved this project into a standard 30 Day Review Time Frame. Please start a new FUP at our permit application web page: https://tdc-online.tucsonaz.gov/#/home NOTE: Documentation of a cost estimate will be required for solar installations. The cost estimate must have a cost breakdown, it must include both the cost of materials and the cost of labor, and it may not be a leasing document. Instructions: 1. Navigate into the current project in the “My Work” tab. Within the permit, navigate to the “Sub-Records” tab and click “Apply” on the Floodplain Use Permit Sub-Record 2. Locations -> Confirm the location is accurate to the project. Click “Next” 3. Type -> Fill in the “Square Feet” and “Valuation” boxes with the project area and a contractor-provided cost estimate (See note above: for new structures, input 0). Click “Next” 4. Contacts -> Confirm contacts and add any additional contacts if applicable. Click “Next” 5. More Info -> This will be filled in by the engineer assigned to your case, Click “Next” 6. Attachments -> Please attach the project plan, supporting documentation for the cost estimate (if applicable), and a drainage/hydrology report (if applicable). Click “Next” 7. Signature -> Read the statement and type your name. Sign your name below (You may Enable Type Signature to have the software sign for you.) Click “Next” 8. Review and Submit -> Review all information to ensure accuracy. Click “Submit” Contact Michael Ortiz at michael.ortiz@tucsonaz.gov if you have any questions about the FUP. Approval ID: SA20240815-9-1069-7097-A 9.315 kW DC/ 7.475 kW AC PV SYSTEM (23) SEG SOLAR-405-BMD-TB MODULES (23) ENPHASE ENERGY IQ8M-72-2-US INVERTERSIssued
2024-08-16finaledTC-SOL-0824-00396City permit recordSolar PVDue to the fact that this project is within a regulated floodplain and requires a Floodplain Use Permit (FUP.), we have moved this project into a standard 30 Day Review Time Frame. Please start a new FUP at our permit application web page: https://tdc-online.tucsonaz.gov/#/home NOTE: Documentation of a cost estimate will be required for solar installations. The cost estimate must have a cost breakdown, it must include both the cost of materials and the cost of labor, and it may not be a leasing document. Instructions: 1. Navigate into the current project in the “My Work” tab. Within the permit, navigate to the “Sub-Records” tab and click “Apply” on the Floodplain Use Permit Sub-Record 2. Locations -> Confirm the location is accurate to the project. Click “Next” 3. Type -> Fill in the “Square Feet” and “Valuation” boxes with the project area and a contractor-provided cost estimate (See note above: for new structures, input 0). Click “Next” 4. Contacts -> Confirm contacts and add any additional contacts if applicable. Click “Next” 5. More Info -> This will be filled in by the engineer assigned to your case, Click “Next” 6. Attachments -> Please attach the project plan, supporting documentation for the cost estimate (if applicable), and a drainage/hydrology report (if applicable). Click “Next” 7. Signature -> Read the statement and type your name. Sign your name below (You may Enable Type Signature to have the software sign for you.) Click “Next” 8. Review and Submit -> Review all information to ensure accuracy. Click “Submit” Contact Michael Ortiz at michael.ortiz@tucsonaz.gov if you have any questions about the FUP. Approval ID: SA20240815-9-1069-7097-A 9.315 kW DC/ 7.475 kW AC PV SYSTEM (23) SEG SOLAR-405-BMD-TB MODULES (23) ENPHASE ENERGY IQ8M-72-2-US INVERTERSComplete
2023-08-18TE-FPU-0823-00297City permit recordSolar PVInstall roof mounted solar panels,15 modules 6.0KW DC/ 4.5KW ACIssued
2023-07-25expired 2024-04-07TC-RES-0723-06784City permit recordSolar PVInstall roof mounted solar panels,15 modules 6.0KW DC/ 4.5KW ACIssued
2023-01-13expired 2023-12-18TC-RES-0123-02079City permit recordResidential Building - One or Two FamilyMain panel upgrade form 100A all in one to 200A all in oneIssued
2022-01-25finaledT22RW00220City permit recordROW5X5 BELL HOLES IN ASPHALT & 10' TRENCH IN DIRT ROW . TO REPLACE GAS LINE . PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF PRECONSTRUCTION MEETINGFinal
2018-07-13T18OT00751City permit recordFloodplain UseFUP FOR T18CM05485Approved
2018-07-13finaledT18CM05485City permit recordSolar PVINSTALLING OF A NEW 5.13KW RESIDENTAL ROOFTOP SOLAR SYSTEM WITH NEW 200A/200A MAIN PANEL AND MAIN BREAKERFinal
Show 1 older record
Permit history for this parcel — remaining 1 records
DateRecordWhatStatusValue
2013-04-08expired 2013-06-07T13EX00531City permit recordEXCAVREMOVE AND REPLACE 4'LF OF VCP TO PVC 16'LF FROM MANHOLE 9779-01 IN ASPHALT.Closed

How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.

Code enforcement (1)

Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.

Code enforcement history for this parcel — 1 of 1 records
DateRecordWhatStatus
2008-05-19T08DV04123Code enforcement caseVegetationComplian

Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.

Planning work at this home?

Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this report was built

This is a reading of public records for parcel 10603031C — 9 permits on file from 2013 to 2024 (5 solar pv, 1 residential building - one or two family, 1 row, 1 floodplain use) and 1 code enforcement case — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-17; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.

The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.