Electrical permit history — 10000 S Wilmot Rd

10000 S Wilmot Rd, Tucson — built 1993, with 25 permits on record. Review electrical, HVAC and remodel history with links to official records.

Commercial property

10000 S Wilmot Rd

Built 1993 — 1990s commercial stock · 25 permits on record; no permitted panel/service or HVAC work among them

Parcel
30309018A
Built
1993 (assessor record)
Jurisdiction
Tucson
Zoning
RH
Assessor use
State Vacant Land
Parcel size
681.73 acres
Building area
829,515 sq ft (assessor record)
Sewer
Connection on file (2008) (county sewer connection records)
Flood zone
X — minimal flood hazard (FEMA)
Historic preservation
Not on file (City of Tucson HP layers)

See the property

County aerial photograph centered on 10000 S Wilmot Rd, parcel outlined

Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.

Is it time to upgrade?

  • Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
  • Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
  • Fire alarm & life safetyNot in this windowNothing in the permit records we read for this parcel that names this system. Any alarm or sprinkler work here predates this feed. For an occupied commercial building that is worth confirming from the panel and the inspection tags rather than assuming.
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Era-based check

    Gear in this age range is usually still supported but is due for infrared scanning and torque verification if that has not been done recently. The permit record does not confirm this; an on-site inspection is required.

  • Era-based check

    NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.

  • Worth confirming

    Vacant or limited-use parcels often need the service re-established or re-sized before a tenant can occupy the space.

Most recent permit on record for this parcel: 2023-05-24 (TR-UTL-0523-01636) — AFTER-THE-FACT: WO T75226. TEP CREW REPLACED OVERHEAD CAPACITOR AT CIRCLED LOCATION ON MAP AS A PRIORITY..

Permit history (25)

Permit history for this parcel — 8 of 25 records
DateRecordWhatStatusValue
2023-05-24finaledTR-UTL-0523-01636City permit recordRight-of-Way (ROW) - UtilityAFTER-THE-FACT: WO T75226. TEP CREW REPLACED OVERHEAD CAPACITOR AT CIRCLED LOCATION ON MAP AS A PRIORITY.Complete
2022-04-14finaledT22RW01495City permit recordRight-of-Way (ROW)Install new 4" gas main within ROW to provide service to Granite Swan Plant. The project installatio; Work Order: 4307835Complete
2021-01-27finaledT21RW00445City permit recordROWN.826937- ALONG S. WILMONT RD ACCESS MH 19562 FOR SPLICING WORK ON EXISTING CABLE.Final
2020-08-18finaledT20RW04673City permit recordROWINSTALLATION OF 4,151 LF OF (3) 1.25" CONDUIT ALONG OLD VAIL CONNECTION BETWEEN WILMOT ROAD AND SWAN ROAD. ** A PRE-CONSTRUCTION MEETING WITH THE DEPARTMENT OF TRANSPORTATION AND MOBILITY LANDSCAPE ARCHITECH, DAVID MARHEFKA, 520-403-5074, IS REQUIRED.Final
2020-05-15finaledT20RW02778City permit recordROW2 5X5 bellholes in dirt-----to repair/replace gas line crews will not be impeding any traffic and will park truck on property in dirtFinal
2019-11-19finaledT19RW07109City permit recordROWTEP will be raising new pole onto foundation and then moving/pulling new wire across Wilmot and then thru desert to Vail substation.Final
2019-11-06finaledT19RW06838City permit recordROWSTARTING IN FRONT OF 10000 S WILMOT RD AT TEP POLE OVERLASH FIBER GOING N/ 624', RISER DOWN POLE AND TRENCH/BORE S. 25' TO OUT OF ROWFinal
2019-10-17finaledT19RW06184City permit recordROWSet new pole, foundation diameter 9'. Reconductor wire East / West across Wilmot and new wire North across Old Vail Connection. Crew to park on the dirt. WO 6274608. WORK LOCATION: Work on Wilmot Rd & Old Vail Connection RdFinal
Show 17 older records
Permit history for this parcel — remaining 17 records
DateRecordWhatStatusValue
2019-10-09finaledT19RW05934City permit recordROWComplete Closure of E Old Vail Connection Rd between Swan and Wilmot. Investigate and repair possible compaction issues around SS manholes 2474-58, 2474-59, 2474-60, and 2474-61MFinal
2019-07-25finaledT19RW04140City permit recordROWN.574234 JOB WILL REQUIRE ACCESS TO MH # 19562 TO SPLICE FIBERFinal
2019-06-13finaledT19RW03358City permit recordROWThis job trenches 75' of 1.66" futurepath N along S Wilmot Rd. HH access required, we are splicing existing fibers. HH #19562 located on W side of S Wilmot Rd, closest intersection E Old Vail Rd. Placing new telecabinet (big shot ped).Final
2019-04-19finaledT19RW02165City permit recordROWDIRT TRENCH 60' PLACE 2" PVC CONDUIT FOR LEVEL E COMMUNICATIONS FIBERFinal
2019-02-19finaledT19RW00917City permit recordROWN.499884 - This job trenches 75' of 1.66" futurepath N along S Wilmot Rd. HH access required, we are splicing existing fibers. HH #19562 located on W side of S Wilmot Rd, closest intersection E Old Vail Rd. Placing new telecabinet (big shot ped).Final
2016-11-18finaledT16RW02805City permit recordROWISSAP ATLAS 0724 (1 LOCATION) - ABANDON/REPLACE/TIE OVER GAS LINES AT VARIOUS LOCATIONS. (1) 5X5 BELLHOLE IN DIRT SHOULDERFinal
2016-08-22finaledT16RW01153City permit recordFence / wallWilmot Rd: Sahuarita Rd to 1-10 (4RTWNS)The project consists of constructing Wilmot Rd starting at Sahuarita Rd and ending approximately 7.1 miles north of the intersection of Wilmot Rd and Sahuarita Rd. The road will consist of two paved lanes and two paved shoulders with a cement treated sub base. There will be cattle guards, fencing, concrete headers, and concrete ford walls. Pavement markings and signing, reseeding of disturbed areas, and other related incidental work is also included. This project is located within Sections 12, 13, 24, 25, 36; T-16-S, R-14-E; Sections 7, 18, 19, 30, 31; T-16-S, R-15-E; Sections 1, 12; T-17-S, R-14-E; Sections 6, 7; T-17-S, R-15-E, Gila and Salt River Meridian, Pima County, Arizona. NOTE: This permit is for the 1-Mile West border of T16S R15E Sec 18Final
2016-08-22finaledT16RW01154City permit recordFence / wallWilmot Rd: Sahuarita Rd to 1-10 (4RTWNS)The project consists of constructing Wilmot Rd starting at Sahuarita Rd and ending approximately 7.1 miles north of the intersection of Wilmot Rd and Sahuarita Rd. The road will consist of two paved lanes and two paved shoulders with a cement treated sub base. There will be cattle guards, fencing, concrete headers, and concrete ford walls. Pavement markings and signing, reseeding of disturbed areas, and other related incidental work is also included. This project is located within Sections 12, 13, 24, 25, 36; T-16-S, R-14-E; Sections 7, 18, 19, 30, 31; T-16-S, R-15-E; Sections 1, 12; T-17-S, R-14-E; Sections 6, 7; T-17-S, R-15-E, Gila and Salt River Meridian, Pima County, Arizona. NOTE: This permit is for the 1-Mile West border of T16S R15E Sec 19Final
2016-08-22finaledT16RW01155City permit recordFence / wallWilmot Rd: Sahuarita Rd to 1-10 (4RTWNS)The project consists of constructing Wilmot Rd starting at Sahuarita Rd and ending approximately 7.1 miles north of the intersection of Wilmot Rd and Sahuarita Rd. The road will consist of two paved lanes and two paved shoulders with a cement treated sub base. There will be cattle guards, fencing, concrete headers, and concrete ford walls. Pavement markings and signing, reseeding of disturbed areas, and other related incidental work is also included. This project is located within Sections 12, 13, 24, 25, 36; T-16-S, R-14-E; Sections 7, 18, 19, 30, 31; T-16-S, R-15-E; Sections 1, 12; T-17-S, R-14-E; Sections 6, 7; T-17-S, R-15-E, Gila and Salt River Meridian, Pima County, Arizona. NOTE: This permit is for the 1-Mile West border of T16S R15E Sec 30Final
2016-08-22finaledT16RW01156City permit recordFence / wallWilmot Rd: Sahuarita Rd to 1-10 (4RTWNS)The project consists of constructing Wilmot Rd starting at Sahuarita Rd and ending approximately 7.1 miles north of the intersection of Wilmot Rd and Sahuarita Rd. The road will consist of two paved lanes and two paved shoulders with a cement treated sub base. There will be cattle guards, fencing, concrete headers, and concrete ford walls. Pavement markings and signing, reseeding of disturbed areas, and other related incidental work is also included. This project is located within Sections 12, 13, 24, 25, 36; T-16-S, R-14-E; Sections 7, 18, 19, 30, 31; T-16-S, R-15-E; Sections 1, 12; T-17-S, R-14-E; Sections 6, 7; T-17-S, R-15-E, Gila and Salt River Meridian, Pima County, Arizona. NOTE: This permit is for the 1-Mile West border of T16S R15E Sec 31Final
2016-07-26finaledT16RW00815City permit recordFence / wallWilmot Rd: Sahuarita Rd to 1-10 (4RTWNS)The project consists of constructing Wilmot Rd starting at Sahuarita Rd and ending approximately 7.1 miles north of the intersection of Wilmot Rd and Sahuarita Rd. The road will consist of two paved lanes and two paved shoulders with a cement treated sub base. There will be cattle guards, fencing, concrete headers, and concrete ford walls. Pavement markings and signing, reseeding of disturbed areas, and other related incidental work is also included. This project is located within Sections 12, 13, 24, 25, 36; T-16-S, R-14-E; Sections 7, 18, 19, 30, 31; T-16-S, R-15-E; Sections 1, 12; T-17-S, R-14-E; Sections 6, 7; T-17-S, R-15-E, Gila and Salt River Meridian, Pima County, Arizona. NOTE: This is for the one mile East border of T16S R15E Sec 1Final
2016-05-09finaledT16EX01785City permit recordEXCAVTRANSPLANTATION OF 12 FEDERALLY-LISTED ENDANGERED PIMA PINEAPPLE CACTUS PLANTS FOR THE WILMOT ROAD IMPROVEMENT PROJECT. SALVAGE AND TRANSPLANT WITHIN THE EDGE OF THE EXISTING ROW. *** 12 SEPERATE PERMITS FOR EACH PLANT LESS THAN 30 MIN OF WORK FOR EACH. ***Final
2008-04-28expired 2008-10-25T08BU00813City permit recordTENTSCANOPY: 40'x60' FOR HEAVY EQUIPMENT RODEOExpired
2007-07-03finaledT07BU01441City permit recordTENTS40 x 60 CANOPY STRUCTURE FOR TRAINING GROUNDSFinal
2004-12-14T04AN01165City permit recordADDRNEWIssued
2004-09-09expired 2004-11-08T04EX00910City permit recordEXCAVWILMOT ROAD WIDENINGClosed
2002-04-04finaledT02CM01725City permit recordCOMBOSFR:TD#15-40-36 RELOCATE TO NEW ADDRESSC of o

How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.

Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.

Planning work at this property?

Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this report was built

This is a reading of public records for parcel 30309018A — 25 permits on file from 2002 to 2023 (12 row, 5 fence / wall, 2 excav, 2 tents) — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.

The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.