Electrical permit history — 7762 E Science Park Dr

7762 E Science Park Dr, Tucson — built 2009, with 13 permits on record. Review electrical, HVAC and remodel history with links to official records.

Commercial property

7762 E Science Park Dr

Build year not published — permits on file from 2009 · 13 permits on record; no permitted panel/service or HVAC work among them

Parcel
14122004U
Built
2009 (earliest permit on file)
Jurisdiction
Tucson
Zoning
I-2
Assessor use
State School Prop
Parcel size
348.85 acres
Sewer
No connection on file (sewer or septic status not confirmed by the record — verify on site)
Flood zone
A — Special Flood Hazard Area (FEMA)
Historic preservation
Not on file (City of Tucson HP layers)

See the property

County aerial photograph centered on 7762 E Science Park Dr, parcel outlined

Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.

Is it time to upgrade?

  • Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2010 build permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
  • Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2010 build permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
  • Fire alarm & life safetyGetting onLast permitted 2010 (16 years ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. T10BU00344 — Install 536 fire sprinklers
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Era-based check

    A capacity and condition review is the usual starting point before any tenant improvement or added load. The permit record does not confirm this; an on-site inspection is required.

Most recent permit on record for this parcel: 2026-08-11 (TD-DEV-0826-00219) — VOID-This plan will modify the F-009 well site to deliver water from the F-009B well and F2 water service area(WSA) to the G2 WSA. Modifications include: equipping the F-009B well, changing the booster station pumps, installing new chlorination equipment, modifying the site control panel, and adding site piping and an MOV flow control valve to connect to the F2 WSA. Additional work includes rehabilitation of the reservoir and above-ground piping..

Permit history (13)

Permit history for this parcel — 8 of 13 records
DateRecordWhatStatusValue
2026-08-11TD-DEV-0826-00219City permit recordAddition / alterationVOID-This plan will modify the F-009 well site to deliver water from the F-009B well and F2 water service area(WSA) to the G2 WSA. Modifications include: equipping the F-009B well, changing the booster station pumps, installing new chlorination equipment, modifying the site control panel, and adding site piping and an MOV flow control valve to connect to the F2 WSA. Additional work includes rehabilitation of the reservoir and above-ground piping.Void
2025-01-14TR-UTL-0125-00082City permit recordRight-of-Way (ROW) - UtilityPothole applicationVoid
2023-10-12TR-UTL-1023-02681City permit recordRight-of-Way (ROW) - UtilityBarricade only: PRJ258466-1: Cox to Pull 1134' through existing conduit, pothole and locate conduit to place a vault for system tie.Void
2013-06-24expired 2013-08-23T13EX00853City permit recordEXCAVTRENCH & REPLACE NEW MANHOLE 15 x 15 EXCAVATION IN DIRT AREA. MANHOLE 4277-03Closed
2012-04-12finaledT12BU00469City permit recordTENTSCANOPYFinal
2010-07-09finaledT10BU01095City permit recordBUILDANSUL SYSTEM ON KITCHEN HOODFinal
2010-03-02finaledT10BU00360City permit recordBUILDFIRE INSPECTIONS FOR NEW CHARTER SCHOOLFinal
2010-02-24finaledT10BU00344City permit recordSPKLRInstall 536 fire sprinklersFinal
Show 5 older records
Permit history for this parcel — remaining 5 records
DateRecordWhatStatusValue
2010-02-22finaledT10BU00319City permit recordSPKLRINSTALL 266 LF OF 6 INCH FIRE UNDERGROUND.Final
2010-02-08finaledT10BU00240City permit recordBUILDNEW FIRE ALARM SYSTEMFinal
2009-06-29T09BU00951City permit recordGRADSWPPGRADING: 19,887CY CUT 7941 CY FILLWithdrwn
2009-06-29T09CM01657City permit recordCOMBONEW CHARTER SCHOOLWithdrwn
2009-06-17T09AN00361City permit recordADDRNEWIssued

How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.

Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.

Planning work at this property?

Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this report was built

This is a reading of public records for parcel 14122004U — 13 permits on file from 2009 to 2026 (3 build, 2 right-of-way (row) - utility, 2 spklr, 1 addition / alteration) — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.

The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.