Electrical permit history — 8755 S Rita Rd
8755 S Rita Rd, Tucson — built 2002, with 44 permits on record. Review electrical, HVAC and remodel history with links to official records.
Commercial property
8755 S Rita Rd
Built 2002 — 2000s commercial stock · HVAC 2021 (permit expired without a confirmed final)
Permanent link: Electrical permit history for 8755 S Rita Rd (aztucsonelectricalsolutions.com/property/14122004l/8755-s-rita-rd-tucson-az-85747) · Public records last checked 2026-08-17
- Parcel
- 14122004L
- Built
- 2002 (county record)
- Jurisdiction
- Tucson
- Zoning
- I-2
- Assessor use
- Manufacture Food Products
- Parcel size
- 85.39 acres
- Building area
- 499,616 sq ft (assessor record)
- Sewer
- Connection on file (2002) (county sewer connection records)
- Flood zone
- X — minimal flood hazard (FEMA)
- Historic preservation
- Not on file (City of Tucson HP layers)
See the property
Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.
Is it time to upgrade?
- Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2022 firecons permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
- Heating, cooling & mechanicalPermitted — completion not confirmedA 2021 permit specifies this work (the permit description states “Installation of chiller and cooling tower”), but the available record does not show a final inspection. The permit expired without a confirmed final status. Official status: Expired. T21CM05762 — Installation of chiller and cooling tower
- Fire alarm & life safetyCurrentA newer 2026 permit for the same system is recorded as “Issued” — The work was permitted, but final completion is not confirmed. The permit description states “Fire Alarm panel install for dedicated sprinkler monitoring”. Last permitted 2022 (4 years ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. T22FC00049 — Install 3 new modules to monitor new sprinkler riser installed and permitted by Kazal Fire.
- RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.
A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.
What that usually means electrically
- Era-based check
NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.
- Worth confirming
Food service carries heavy, cycling kitchen loads and exhaust interlocks. Capacity and existing panel space are the first things to verify on any remodel.
Recorded sales (2)
| Date | Price | Type |
|---|---|---|
| 2002-07-26 | $52,000,000 | Special Warranty Deed |
| 2000-12-05 | $2,850,000 | Special Warranty Deed |
Recorded sales are the sales the Pima County Assessor has on file from affidavits of property value — not every transfer, not listings, and not a valuation. Parties are never shown here. A sale with no permitted electrical work since is worth knowing before the next sale or a remodel.
Most recent permit on record for this parcel: 2026-07-15 (TF-FCP-0726-00450) — Fire Alarm panel install for dedicated sprinkler monitoring.
Permit history (44)
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2026-07-15expires 2027-01-27 | TF-FCP-0726-00450City permit record | Fire ConstructionFire Alarm panel install for dedicated sprinkler monitoring | Issued | |
| 2026-06-11 | TC-COM-0626-00868City permit record | New constructionTP-PRE-1125-00238, TD-DEV-0126-00008 Wastewater pretreatment expansion: 1. New concrete slab with canopy (sides are open air) covers wastewater process equipment. 2. New pre-engineered metal building to house electrical equipment, blowers, chemical dosing equipment. 3. Two new bolted-steel, open-top, above grade tanks wastewater equalization and biological treatment, two new closed-top FRP sludge storage tanks. 4. New cooling tower on 12’x12’ concrete slab. Split Commercial New Building application into (2) permits: 1. SEE SEPARATE PERMIT “Permit #1” two bolted steel wastewater treatment tanks, cooling tower, and sludge storage tanks, and associated underground piping TC-COM-0526-00737. 2. Permit #2 broken into “Phase 1” (Permit #2 Phase #1 SEE SEPARATE PERMIT TC-COM-0526-00763) foundation/slab design, associated piping to expedite review of concrete work. Permit #2 Phase 2 (******THIS PERMIT******) above-grade building/canopy structure, equipment anchorage, electrical, heating/cooling, plumbing disciplines, site civil, demolition, structural anchorage, electrical, HVAC, plumbing drawings & calculations. | In review | |
| 2026-06-03expires 2027-01-25 | TC-UTL-0626-00079City permit record | UtilitiesThis Development Package submittal is a follow-up to the Pre-Application Conference review of the proposed wastewater pretreatment facility expansion at the Faribault Foods, Inc (Arizona Canning Company, LLC) site under Plan Number TP-PRE-1125-00238. The proposed construction will consist of: 1. A new concrete slab with a protective canopy of approximately 18’ interior eave height to cover the wastewater process equipment. The sides of the canopy will be open air. 2. A new pre-engineered metal building (PEMB) approximately 45’x38’ (1,710 square feet) to house electrical equipment, blowers, and chemical dosing equipment. 3. Two new bolted-steel, open-top, above grade tanks for wastewater equalization (47.5’ diameter and 32.5’ tall) and biological treatment (55.5’ diameter and 24.75’ tall), and two new closed-top FRP sludge storage tanks approximately 13’ diameter and 28’ tall. 4. A new cooling tower (18’ tall) installed on a 12’x12’ concrete slab. | Inspections | |
| 2026-06-03 | TF-FCP-0626-00372City permit record | Fire ConstructionVOID - Submitted new Permit#TF-FCP-0726-00450 - New fire alarm system for new wastewater pretreatment building and equipment canopy area associated with TD-DEV-0126-00008 and TC-COM-0526-00763. | Void | |
| 2026-06-03 | TF-FCP-0626-00374City permit record | Fire ConstructionVOID - Duplicate Permit#TF-FCP-0626-00372 - New fire automatic extinguishing system for new wastewater pretreatment building and equipment canopy area associated with TD-DEV-0126-00008 and TC-COM-0526-00763. | Void | |
| 2026-05-22expires 2027-08-06 | TC-COM-0526-00763City permit record | New constructionWastewater pretreatment expansion: 1. New concrete slab with canopy (sides are open air) covers wastewater process equipment. 2. New pre-engineered metal building to house electrical equipment, blowers, chemical dosing equipment. 3. Two new bolted-steel, open-top, above grade tanks wastewater equalization and biological treatment, two new closed-top FRP sludge storage tanks. 4. New cooling tower on 12’x12’ concrete slab. Split Commercial New Building application into (2) permits: 1. SEE SEPARATE PERMIT: “Permit #1” two bolted steel wastewater treatment tanks, cooling tower, sludge storage tanks, underground piping. Structural foundation/slab design. Special Inspections Certificate form be submitted prior to Start of Inspections as deferred submittal. 2. THIS PERMIT: Permit #2 broken into Phase 1” (******THIS PERMIT******) foundation/slab design to expedite review of concrete work. Permit #2 Phase 2 (SEE SEPARATE PERMIT) above-grade building/canopy structure, equipment anchorage, electrical, heating/cooling, plumbing disciplines. | Inspections | |
| 2026-05-19expires 2027-08-06 | TC-COM-0526-00737City permit record | New constructionWastewater pretreatment expansion: 1. New concrete slab with canopy (sides are open air) covers wastewater process equipment. 2. New pre-engineered metal building to house electrical equipment, blowers, chemical dosing equipment. 3. Two new bolted-steel, open-top, above grade tanks wastewater equalization and biological treatment, two new closed-top FRP sludge storage tanks. 4. New cooling tower on 12’x12’ concrete slab. Split Commercial New Building application into (2) permits: 1. (******THIS PERMIT******): “Permit #1” two bolted steel wastewater treatment tanks, cooling tower, sludge storage tanks, underground piping. Structural foundation/slab design. Special Inspections Certificate form be submitted prior to Start of Inspections as deferred submittal. 2. SEE SEPARATE PERMIT: Permit #2 broken into “Phase 1” foundation/slab design to expedite review of concrete work. Permit #2 Phase 2 above-grade building/canopy structure, equipment anchorage, electrical, heating/cooling, plumbing disciplines. | Issued | |
| 2026-03-25expires 2029-07-06 | TD-DEV-0326-00077City permit record | Development PackageThis Development Package submittal is a follow-up to the previous Development Package submitted under Plan Number TP-PRE-1125-00238 for the proposed wastewater pretreatment facility expansion at the Faribault Foods, Inc (Arizona Canning Company, LLC) site. This separate Development Package is associated with "At-risk Grading" in relation to the previous Development Package application and proposes to include only site grading work and proposed below grade wastewater piping associated with the project to improve the overall project timeline. | Inspections |
Show 36 older records
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2026-01-09expires 2029-07-13 | TD-DEV-0126-00008City permit record | Development PackageThis Development Package submittal is a follow-up to the Pre-Application Conference review of the proposed wastewater pretreatment facility expansion at the Faribault Foods, Inc (Arizona Canning Company, LLC) site under Plan Number TP-PRE-1125-00238. The proposed construction will consist of: 1. A new concrete slab with a protective canopy of approximately 18’ interior eave height to cover the wastewater process equipment. The sides of the canopy will be open air. 2. A new pre-engineered metal building (PEMB) approximately 45’x38’ (1,710 square feet) to house electrical equipment, blowers, and chemical dosing equipment. 3. Two new bolted-steel, open-top, above grade tanks for wastewater equalization (47.5’ diameter and 32.5’ tall) and biological treatment (55.5’ diameter and 24.75’ tall), and two new closed-top FRP sludge storage tanks approximately 13’ diameter and 28’ tall. 4. A new cooling tower (18’ tall) installed on a 12’x12’ concrete slab. | Inspections | |
| 2025-06-12finaled | TR-ROW-0625-00800City permit record | Right-of-Way (ROW)AZTEC will perform 3 utility potholes in the Rita Rd right of way at 8800 S Rita Rd | Complete | |
| 2023-05-09finaled | TR-UTL-0523-01527City permit record | Right-of-Way (ROW) - UtilityCox to overlash 414' of existing CATV aerial strand, trench 25' & bore 135' to install new CATV conduit for system tie. | Complete | |
| 2022-01-18finaled | T22FC00049City permit record | FIRECONSInstall 3 new modules to monitor new sprinkler riser installed and permitted by Kazal Fire. | Final | |
| 2021-10-12 | T21RW04647City permit record | ROWS.2878460-2- ALONG WEST SIDE OF S. RITA RD. ACCESS MH 22824 TO SPLICE EXISTING CABLE. | Withdrwn | |
| 2021-08-18finaled | T21FC00643City permit record | FIRECONSModify existing wet pipe fire sprinkler system. | Final | |
| 2021-08-06finaled | T21RW03645City permit record | ROWUNION PACIFIC RAILROAD HAS A 6 HOUR REPAIR REQUIRING A FULL CLOSURE THEY INTEND TO DO TO THE RAILROAD TRACKS LOCATED ON RITA WAY SOUTH OF E OLD VAIL ROAD. | Final | |
| 2021-07-14 | T21CM05762City permit record | Commercial BuildingInstallation of chiller and cooling tower | Expired | |
| 2021-06-11expired 2022-09-28 | T21CM04898City permit record | Commercial Buildingany exInstallation of Hydro-sterilization unit in the existing facility. Structural work includes th | Expired | |
| 2021-02-19expired 2021-12-01 | T21CM01497City permit record | Addition / alterationBoiler Addition | Expired | |
| 2020-05-11finaled | T20RW02638City permit record | ROWPAVNG JULAIN WASH BIKE PATH, LANE CLOSURE FOR TRUCK ACCESS ****PERMIT FOR WORK WITHIN COT ROW ONLY**** ADDRESS CHANGED FROM "UPRR AT HOUGHTON & RITA ROAD" TO "8755 S RITA RD" ***CONTRACTOR MUST REACH OUT TO INSPECTOR FOR PRE-CON BEFOR ANY WORK CAN BE DONE*** | Final | |
| 2019-12-30finaled | T19RW07763City permit record | ROWEXCAVATE / INSPECT AND REPAIR KINDER MORGAN'S PETROLEUM PIPELINE (JET FUEL) PER FEDERAL D.O.T REQUIREMENTS. | Final | |
| 2019-11-07finaled | T19RW06867City permit record | ROWSETUP MIOVISION SCOUT MOUNTED ON A POLE FOR 48-HOUR VIDEO COLLECTION IN THE AREA OF RITA ROAD AND OLD VAIL ROAD NOTE: WORK IS IN THE AREA OF THE RAILROAD TRACKS - ADDRESS ON PERMIT IS FOR PERMITTING PURPOSES ONLY | Final | |
| 2019-10-17finaled | T19RW06193City permit record | ROWSetting up a flagging operation near the railroad crossing for the railroad. The railroad signals will be shut off during working hours and flaggers will be placed at the crossing to act as a signal when trains and machines travel through the crossings. Traffic control will be set up per the TA-13 from the MUTCD. ADDRESS ON APPLICATION-8753 S RITA RD | Final | |
| 2018-08-06finaled | T18FC00647City permit record | FIRECONSFIRE PANEL REPLACEMENT | Final | |
| 2018-06-20finaled | T18RW02805City permit record | ROWNEED (2) MH ACCESS FOR SPLICING ONLY MH # 24674 & 22824 | Final | |
| 2017-11-28expired 2018-08-15 | T17FC00961City permit record | Fire ConstructionAutomatic Fire Extingshing Sys - INSTALL ESFR SYSTEM IN NEW COOLER FROM EXISTING WET PIPE FIRE SPRINKLER SYSTEM.; Commercial Fire Sprinkler Systems - Modification of heads: 36 | Expired | |
| 2016-08-12finaled | T16RW01009City permit record | ROW(2) 5x5 IN DIRT TO INSTALL ANODES ACROSS THE STREET FROM ADDRESS BY JULIAN WASH PASS | Final | |
| 2015-01-12 | T15TC00115City permit record | BARRICADJOB WILL REQ'D TO DIG A PIT TO LOCATE EXISTING CONDUIT, TRENCH +/-6' TO PLACE (1) 4" CONDUIT TO A NEW 3048 HANDHOLE, THEN TRRENCH ANOTHER +/-6' TO EXTEND (1) 4" CONDUIT TO AN EXISTING PEDESTAL. WORK WILL TAKE PLACE APPRX +/-30' OFFSET FROM RITA RD END OF CURVE SEE ATTCHED DETAIL FOR LOCATION | Expired | |
| 2009-08-28finaled | T09BU01293City permit record | SPKLRInstall 39 fire sprinklers | Final | |
| 2009-07-28finaled | T09BU01097City permit record | BUILDFIRE ALARM | Final | |
| 2009-05-05finaled | T09BU00652City permit record | SPKLRInstall 580' of 12" & 493' of 8" underground & 968 fire sprinklers | Final | |
| 2009-04-16expired 2009-11-11 | T09CM00859City permit record | COMBOFOUNDATION ONLY | Expired | |
| 2009-02-26completed 2009-04-24 | T09SA00059Variance | Zoning ComplianceVariance request to reduce parking associated with a warehouse expansion | Effectuated | |
| 2009-01-23 | D09-0001City permit record | Development PackageARIZONA CANNING FACILITY EXPANSION | Approved | |
| 2009-01-23 | T09BU00107City permit record | GRADSWPPGRADING Arizona Canning Expansion | Withdrwn | |
| 2009-01-23finaled | T09CM00182City permit record | Addition / alterationADDITION: "FINISH PRODUCT" STORAGE | Final | |
| 2007-09-20finaled | T07BU02001City permit record | SPKLR24 new sprinkler heads | Final | |
| 2007-03-22finaled | T07BU00628City permit record | BUILDREPLACE FACP EQUIPMENT & RELATED DEVICES | Final | |
| 2007-03-09finaled | T07BU00542City permit record | SPKLRremove and replace sprinkler piping | Final | |
| 2007-03-09 | T07BU00543City permit record | SPKLRremove and replace sprinkler piping | Withdrwn | |
| 2007-01-31finaled | T07CM00373City permit record | COMBOREMOVE ROOF TO MODIFY STORK HYDROSTAT & REATTACH ROOF | Final | |
| 2007-01-17finaled | T07CM00211City permit record | COMBOFOUNDATION ONLY - FOR STORK HYDRO EQUIPMENT IN EXISTING BLDG. | Final | |
| 2006-11-20finaled | T06OT03017City permit record | SIGN12202 | Final | |
| 2006-10-09finaled | T06CM05386City permit record | COMBOFOUNDATION ONLY FOR FUTURE HYDRO STAT | Final | |
| 2006-08-04 | T06OT02042City permit record | C-OF-OC OF O: FACTORY/STORAGE | Withdrwn |
How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.
Code enforcement (4)
Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.
| Date | Record | What | Status |
|---|---|---|---|
| 2014-03-03 | T14DV01207Code enforcement case | Code enforcement case | Noverify |
| 2009-04-23finaled | T09FR01399Code enforcement case | Fire | Complete |
| 2007-03-13finaled | T07FR00478Code enforcement case | Code enforcement case | Complete |
| 2007-01-19finaled | T07FR00173Code enforcement case | Code enforcement case | Complete |
Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.
This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.
Planning work at this property?
Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
The permanent link and the summary above, sent once. No list.One email when a new permit, inspection result or code case appears on this parcel — nothing else, and you can stop any time. No list.
How this report was built
This is a reading of public records for parcel 14122004L — 44 permits on file from 2006 to 2026 (8 row, 5 spklr, 4 fire construction, 4 combo) and 4 code enforcement cases — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-17; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.
The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).
Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.