Electrical permit history — 9090 S Houghton Rd

9090 S Houghton Rd, Tucson — built 2020, with 10 permits on record. Review electrical, HVAC and remodel history with links to official records.

Commercial property

9090 S Houghton Rd

Built 2020 — 2020s commercial stock · 10 permits on record; no permitted panel/service or HVAC work among them

Parcel
14118612A
Built
2020 (assessor record)
Jurisdiction
Tucson
Zoning
I-2
Assessor use
Restaurant Fast Food
Parcel size
0.97 acres
Building area
4,859 sq ft (assessor record)
Sewer
Connection on file (2018) (county sewer connection records)
Flood zone
X — minimal flood hazard (FEMA)
Historic preservation
Not on file (City of Tucson HP layers)

See the property

County aerial photograph centered on 9090 S Houghton Rd, parcel outlined

Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.

Is it time to upgrade?

  • Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2019 firecons permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
  • Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2019 firecons permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
  • Fire alarm & life safetyCurrentLast permitted 2019 (7 years ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. T19FC00905 — New dedicated function fire alarm
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Worth confirming

    Food service carries heavy, cycling kitchen loads and exhaust interlocks. Capacity and existing panel space are the first things to verify on any remodel.

Recorded sales (1)

Recorded transfers from the Pima County Assessor — 1 of 1
DatePriceType
2014-06-26$790,000Warranty Deed

Recorded sales are the sales the Pima County Assessor has on file from affidavits of property value — not every transfer, not listings, and not a valuation. Parties are never shown here. A sale with no permitted electrical work since is worth knowing before the next sale or a remodel.

Most recent permit on record for this parcel: 2026-08-14 (TF-FCP-0826-00517) — Ansul system installs on 2 hoods Double expedite review needed on this one..

Permit history (10)

Permit history for this parcel — 8 of 10 records
DateRecordWhatStatusValue
2026-08-14TF-FCP-0826-00517City permit recordFire ConstructionAnsul system installs on 2 hoods Double expedite review needed on this one.Submitted - online
2026-08-10TC-COM-0826-01262City permit recordFence / wallImprovements to the existing cook line. New traulsen refrigerator, new work cart, and new mechanical chase, universal hood and hood capture jet. Relocation of some existing equipment including 4-vat fryer, 3 platen grill, mechanical chase, meat freezer, combi-oven, chase, wall mount freezer and base refrigerator.In review
2019-11-07finaledT19FO00980City permit recordFIREOPEROCC LOAD 118Final
2019-10-29finaledT19FC00905City permit recordFIRECONSNew dedicated function fire alarmFinal
2019-10-22finaledT19FC00872City permit recordFIRECONSINSTALLATION OF (2) ANSUL FIRE SYSTEMFinal
2019-09-26finaledT19FO00774City permit recordFIREOPERBowlero - Installing CO2 Detection SystemFinal
2019-08-22finaledT19FC00668City permit recordFIRECONSInstallation of Underground Fire Line Piping for Ground up Commercial ConstructionFinal
2019-08-02expired 2020-02-15T19OT00725City permit recordSign - Permanent9 ILLUM SIGNS FOR NEW MCDONALDSExpired
Show 2 older records
Permit history for this parcel — remaining 2 records
DateRecordWhatStatusValue
2019-07-30expired 2020-07-31T19FC00586City permit recordFire ConstructionAutomatic Fire Extingshing Sys - New Fire Sprinkler System for Ground-Up ConstructionExpired
2013-09-06finaledDP13-0178City permit recordDevelopment PackageSITE/GRADING/SWPPP - McDonald's.Complete

How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.

Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.

Planning work at this property?

Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this report was built

This is a reading of public records for parcel 14118612A — 10 permits on file from 2013 to 2026 (3 firecons, 2 fire construction, 2 fireoper, 1 fence / wall) — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.

The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.