Electrical permit history — 10039 E Old Vail Rd

10039 E Old Vail Rd, Tucson — with 40 permits on record. Review electrical, HVAC and remodel history with links to official records.

Electrical Property Screening Report · Property

10039 E Old Vail Rd

A screening report for electrical planning, assembled from public-record indicators. It is not an official record and every figure in it should be verified against the issuing agency before it is relied on.

Verify parcel data at official source ↗

1 open code case · 40 permits on record; no permitted panel/service or HVAC work among them

No published build year for this parcel. Year built is only published for part of the county — most of it inside Tucson city limits — and this parcel isn't in that dataset. Tell us roughly when it was built and you'll get the same read.

Is it time to upgrade?

  • Electrical service & panelNot in this windowNothing in the permit records we read for this parcel that names this system. A blank line here is weak evidence either way: nothing has needed a service permit in the window we read, and the build year — asked for above — is the better clue to what era the service belongs to.
  • Heating & coolingNot in this windowNothing in the permit records we read for this parcel that names this system. Cooling equipment works harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes.
  • Water heaterNot in this windowNothing in the permit records we read for this parcel that names this system. Water heaters are frequently swapped without a permit, so this line is especially weak evidence either way.
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system.
  • Plumbing work on recordNot in this windowNothing in the permit records we read for this parcel that names this system. Unremarkable — plenty of buildings never need a permitted plumbing repair.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitized. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Worth looking at

    There is an open code enforcement case on this parcel. An open case can hold up a permit, and if it touches unpermitted work the electrical scope usually has to be brought up to code as part of resolving it.

  • Routine

    We could not read a build year for this parcel, so we cannot infer the wiring era. A visual check of the panel is the fastest way to establish what is there.

What to check at the panel

Everything above is read off public records. These are the things only someone standing at the panel can settle, and they take about a minute.

  1. The number stamped on the main breaker handle — 100, 125, 150, 175 or 200. That is the service rating, and no record on this page confirms it.
  2. The busbar rating printed on the panel label. It is a different number from the main breaker, and it is the one that decides how much solar a panel can take under the 120% rule.
  3. The manufacturer and catalog number on the label inside the door.
  4. How many full-size spaces are left, how many positions the label permits a tandem breaker in, and the tandem limit the label states. A full panel is a different job from a full service.
  5. The conductor material at the main lugs, and whether the terminations look clean and tight.
  6. Whether there is a separate meter-main outside as well as the panel indoors — that changes where a disconnect and any new feeder would land.
  7. Whether the water heater, dryer and range are gas or electric. No public record carries fuel type, and it is the single biggest variable in a load calculation — it can move the calculated load on the same house by more than 40 A.

With those in hand you can run the numbers yourself. The load calculator does the NEC 220.82 optional-method calculation — the same method a permit application uses — and shows its work.

Open the load calculator →

What these jobs cost here

The public record for this parcel is too thin to price it honestly — only installed equipment from a permit is known for this parcel — not enough to price it as anything but a city average. Rather than show you a number that is really just a City of Tucson average wearing this address, the calculator will ask you the four or five things that actually decide it and price it properly.

Price a panel upgrade or AC replacement →

See the property

Satellite imagery © Google. Imagery can predate recent work and shows nothing about what is inside — context, not evidence.

Flood and drainage

The federal flood map and the local one are not the same map, and they do not always agree. FEMA’s is the insurance map; the City of Tucson regulates against its own, and that is the one a permit here is judged against.

The record behind this read

Parcel
14118602A
Permitting authority
Tucson
Zoning
I-1

The most recent permit with evidence of issuance is dated 2026. The work was permitted, but final completion is not confirmed. The permit covers only the work described in that record.

What this means for work here

Informational public-record summary — not engineering, inspection, valuation or purchasing advice, and not the official record.

The most recent permit with evidence of issuance is dated 2026. The work was permitted, but final completion is not confirmed. The permit covers only the work described in that record.

What that reading rests on. The issuing offices hold 40 building permits for this parcel dated between 2007 and 2026. By category the work is addition / alteration (7), fire automatic extinguishing system (7), permanent sign (6) and fire alarm system (3). 6 of them carry a final inspection; the other 34 were issued, expired or are still open, which is not the same as work completed. There is 1 code-enforcement case recorded against the parcel, 1 of which is open. We do not reproduce complaint text — it routinely names people with no connection to the property.

Go straight to the records

Each link opens the issuing office’s own file for that record — dates, scope, status and inspections are theirs to publish, and they are all on the other side of these links.

Read the records yourself. We republish selected facts and record numbers so you can find the file; the issuing agency’s record controls. The files are held by City of Tucson permit record (PRO) ↗ — search the parcel number 14118602A. Permit and parcel information courtesy of the City of Tucson and Pima County; their files are the official record and control over anything summarized here.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.

Utility and upgrade pathElectric service here is Tucson Electric Power (TEP). A service or panel upgrade needs a TEP meter release and has to meet TEP’s service requirements — meter height and location, clearances, and the point of attachment. See TEP new-service requirements and the TEP standards notes.

In the public record: All property under construction · Commercial property in 85747 · Commercial & industrial reports · Homes in 85747 · Permit data by neighborhood

Planning work at this home?

Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

What the flood note is not. The FEMA map linked above is the National Flood Hazard Layer — the federal insurance map. Local floodplain mapping is not reproduced here; use the authority’s own map, linked above. Nothing here is a floodplain determination, an elevation certificate, or a substitute for one. A parcel can straddle a boundary, and a Letter of Map Amendment can remove a structure the map still covers. For a determination, ask the floodplain administrator for the jurisdiction named above; for a design that has to satisfy one, that is work we do.

How this property compares nearby

Properties on E OLD VAIL RD hold 896 City permits on record, 428 of them since 2022.

Computed from the same public records as this report — counts and years, not an appraisal.

Complete permit record (41 entries)

Every permit and case we hold for this parcel, newest first. Each number links to the official file.

YearNumberTypeStatus
2026CE-VIO1126-04578Code enforcement caseReceived
2026TC-COM-0826-01264Commercial Addition/Alteration PermitIssued
2026TS-PRM-1126-00396Permanent Sign PermitIn Review
2026TS-PRM-1026-00385Permanent Sign PermitIn Review
2026TC-COM-0826-01228Commercial Addition/Alteration PermitInspections
2026TC-COM-0626-00970Commercial Addition/Alteration PermitIn Review
2026TS-PRM-0926-00334Permanent Sign PermitIssued
2026TC-CFO-0926-00174Temporary Certificate-of-Occupancy (TCO)Denied
2026TC-COM-0626-00793Commercial Addition/Alteration PermitIssued
2026TC-COM-0226-00150Commercial Addition/Alteration PermitIn Revision
2026TC-COM-0826-01259Commercial Addition/Alteration PermitApproved
2026TS-PRM-0426-00130Permanent Sign PermitIssued
2026recordRight-of-Way (ROW) Permit - UtilityNeeds Resubmittal
2026TC-COM-0426-00484Commercial Addition/Alteration PermitInspections
2026TF-FCP-0526-00358Fire Automatic Extinguishing System PermitIssued
2026TF-FCP-0526-00357Fire Automatic Extinguishing System PermitIssued
2026recordRight-of-Way (ROW) Permit - UtilityIssued
2026TF-FCP-0226-00122Fire Automatic Extinguishing System PermitIssued
2026TS-PRM-0426-00138Permanent Sign PermitNeeds Resubmittal
2026TP-PRE-0426-00078Pre-Application ConferenceComplete
2026recordROW Permit - Development/BuildingInspections
2026TF-FCP-0326-00180Fire Alarm System PermitIssued
2026TF-FCP-0226-00124Fire Automatic Extinguishing System PermitIssued
2026TF-FCP-0226-00123Fire Automatic Extinguishing System PermitIssued
2026TF-FCP-0326-00179Fire Alarm System PermitIssued
2026TF-FCP-0226-00121Fire Alarm System PermitIssued
2026TF-FCP-0326-00166Fire Automatic Extinguishing System PermitFees Due
2026TF-FCP-0226-00105Fire Automatic Extinguishing System PermitInspections
2026TC-COM-1125-02102Commercial New Building PermitInspections Complete
2026TC-COM-0925-01779Commercial New Building PermitIssued
2026TC-COM-0925-01634Commercial New Building PermitComplete
2025TZ-PMT-1225-00124Temporary Use PermitExpired
2025TC-UTL-1025-00088Private Utilities PermitInspections
2025TS-PRM-1025-00438Permanent Sign PermitInspections
2025TD-DEV-0725-00181Development PackageInspections
2025TD-DIV-0825-00085Land Split/Lot SplitComplete
2025TS-MSP0825-00005Master Sign ProgramApproved
2025TW-DEVCON-0426-0011TW Developer Construction PermitInspections
2025TP-PRE-0125-00013Pre-Application ConferenceComplete
2024recordROW Permit - City CIP/JOCComplete
2007S07-156Subdivision/PlatsApproved

prints this report — permits, comparisons and sources — as a clean document

How this report was built

This is a reading of public records for parcel 14118602A — 40 City permits on file from 2007 to 2026 and 1 code enforcement case — assembled from the Pima County parcel file and the City of Tucson’s published permit layers together with the City’s own migrated permit archive, whose records reach back to the mid-1990s. Some records were still not read for this snapshot: City permit records before the mid-1990s were never fully digitized. The assessor’s building record, the sewer connection file and the flood map were also not read for this snapshot. Absence of a permit here is NOT evidence work was never permitted — it may predate the digitized record or sit in a system this snapshot did not read. Public records snapshot taken 2026-11-13.

The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.