Electrical permit history — 9800 E Rita Rd
9800 E Rita Rd, Tucson — built 2003, with 57 permits on record. Review electrical, HVAC and remodel history with links to official records.
Commercial property
9800 E Rita Rd
Build year not published — permits on file from 2003 · 57 permits on record; no permitted panel/service or HVAC work among them
Permanent link: Electrical permit history for 9800 E Rita Rd (aztucsonelectricalsolutions.com/property/14118002c/9800-e-rita-rd-tucson-az-85747) · Public records last checked 2026-08-16
- Parcel
- 14118002C
- Built
- 2003 (earliest permit on file)
- Jurisdiction
- Tucson
- Zoning
- RX-1
- Assessor use
- Municipal Vacant Land
- Parcel size
- 6.30 acres
- Sewer
- No connection on file (sewer or septic status not confirmed by the record — verify on site)
- Flood zone
- X — minimal flood hazard (FEMA)
- Historic preservation
- Not on file (City of Tucson HP layers)
See the property
Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.
Is it time to upgrade?
- Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2024 fire operational permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
- Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2024 fire operational permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
- Fire alarm & life safetyCurrentLast permitted 2023 (3 years ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. TF-FCP-0823-01023 — Fire Suppression System installation
- RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.
A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.
What that usually means electrically
- Era-based check
NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.
- Worth confirming
Vacant or limited-use parcels often need the service re-established or re-sized before a tenant can occupy the space.
- Worth confirming
Solar was permitted here in 2023. That means there is an existing interconnection, and the main breaker and busbar rating already carry a PV backfeed — so anything else you add (an EV charger, a heat pump) has to be checked against what is left under the 120% rule, not against the service size alone.
Most recent permit on record for this parcel: 2026-08-05 (TR-UTL-0826-01298) — WO# 3339974 9800 E RITA RD aka 10000 E Rita Rd for meter 15 15 23 sw repair leaking service line east side of lot in dirt easement. 8LF/QL.
Permit history (57)
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2026-08-05 | TR-UTL-0826-01298City permit record | Right-of-Way (ROW) - UtilityWO# 3339974 9800 E RITA RD aka 10000 E Rita Rd for meter 15 15 23 sw repair leaking service line east side of lot in dirt easement. 8LF/QL | Needs resubmittal | |
| 2024-08-12finaled | TC-UTL-0824-00064City permit record | UtilitiesAT&T Tower Modification | Inspections complete | |
| 2024-06-03finaled | TF-FOP-0624-00651City permit record | Fire OperationalSkateboarding competition - special events organizer | Complete | |
| 2023-11-28expired 2025-06-12 | TC-COM-1123-02733City permit record | Commercial BuildingApplication for a building permit to construct a group ramada within the Purple Heart Park | Issued | |
| 2023-11-28expired 2024-05-26 | TC-DMO-1123-00239City permit record | DemolitionMinor demolition within Purple Heart Park in order to clear an area for the construction of a new Group Ramada | Expired | |
| 2023-10-11expires 2027-03-15 | TD-DEV-1023-00420City permit record | Development PackageDevelopment Package for the Purple Heart Park Group Ramada | Issued | |
| 2023-08-29finaled | TC-COM-0823-02103City permit record | Solar PVInstall PV Solar canopy 29.16 KW DC 20 KW AC This job is associate with BP- TC-COM-0423-01041 and DP TD-DEV-0323-00185 | Complete | |
| 2023-08-23finaled | TF-FCP-0823-01023City permit record | Fire ConstructionFire Suppression System installation | Complete |
49 older records are not shown here. — each links to its official file.
How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.
Code enforcement (8)
Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.
| Date | Record | What | Status |
|---|---|---|---|
| 2016-10-11 | T16DV07031Housing code violation | SIGN VIOLATIONrecorded before 2023 | COMPLIAN |
| 2016-08-17 | T16DV04943Code enforcement case | Sign | Noverify |
| 2016-06-22 | T16DV03728Code enforcement case | Code enforcement case | Complian |
| 2016-06-22 | T16DV03729Code enforcement case | Code enforcement case | Complian |
| 2016-06-10 | T16DV03457Code enforcement case | Code enforcement case | Complian |
| 2016-06-10 | T16DV03470Code enforcement case | Code enforcement case | Complian |
| 2010-10-01finaled | T10FR02014Code enforcement case | Fire | Complete |
| 2009-10-01finaled | T09FR03134Code enforcement case | Code enforcement case | Complete |
Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.
This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel.
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
The permanent link and the summary above, once. No list, no follow-up unless you ask for it.
How this report was built
This is a reading of public records for parcel 14118002C — 57 permits on file from 2003 to 2026 (20 combo, 7 commercial building, 6 development package, 6 row) and 8 code enforcement cases — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.
The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).
Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.