Electrical permit history — 7471 S Houghton Rd
7471 S Houghton Rd, Tucson — built 2022, with 8 permits on record. Review electrical, HVAC and remodel history with links to official records.
Commercial property
7471 S Houghton Rd
Build year not published — permits on file from 2022 · 8 permits on record; no permitted panel/service or HVAC work among them
Permanent link: Electrical permit history for 7471 S Houghton Rd (aztucsonelectricalsolutions.com/property/141177510/7471-s-houghton-rd-tucson-az-85747) · Public records last checked 2026-08-16
- Parcel
- 141177510
- Built
- 2022 (earliest permit on file)
- Jurisdiction
- Tucson
- Zoning
- I-2
- Assessor use
- Car/Truck Wash Full Service
- Parcel size
- 1.32 acres
- Sewer
- No connection on file (sewer or septic status not confirmed by the record — verify on site)
- Flood zone
- X — minimal flood hazard (FEMA)
- Historic preservation
- Not on file (City of Tucson HP layers)
See the property
Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.
Is it time to upgrade?
- Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
- Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
- Fire alarm & life safetyNot in this windowNothing in the permit records we read for this parcel that names this system. Any alarm or sprinkler work here predates this feed. For an occupied commercial building that is worth confirming from the panel and the inspection tags rather than assuming.
- RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.
A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.
What that usually means electrically
- Era-based check
A capacity and condition review is the usual starting point before any tenant improvement or added load. The permit record does not confirm this; an on-site inspection is required.
Most recent permit on record for this parcel: 2026-04-08 (TR-UTL-0426-00635) — 2 5x5 bellholes in dirt/blktop front for crews to obtain CP reads on gas facilities.
Permit history (8)
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2026-04-08expired 2026-06-15 | TR-UTL-0426-00635City permit record | Right-of-Way (ROW) - Utility2 5x5 bellholes in dirt/blktop front for crews to obtain CP reads on gas facilities | Inspections | |
| 2024-12-11finaled | TR-ROW-1224-01418City permit record | Right-of-Way (ROW)Refresh Existing Center Line, Turn Line and Stop Bar per City of Tucson Drawing. | Complete | |
| 2024-10-16finaled | TR-ROW-1024-01218City permit record | Right-of-Way (ROW)On the southwest side remove and replace 20’ of asphalt path and replace with 30’ of new standard concrete sidewalk. On the southeast side remove 30’ of asphalt path and replace with 30’ of new asphalt.*** | Complete | |
| 2024-09-09finaled | TC-CFO-0924-00189City permit record | Certificate of OccupancyGround-up car wash tunnel and associated facilities | Complete | |
| 2024-09-06 | TC-CFO-0924-00187City permit record | Certificate of OccupancyWhen requesting TCO please request under TC-CFO-0924-00189. Pay TCO extension under TC-CFO-0924-00189 This project needs the okay for a Temporary Certificate of Occupancy and building level from a Building and Engineering Inspector. And a Water Sterilization Report is needed prior to TCO. Please schedule inspections and submit Water Sterilization Report. Once both inspectors have given an okay for TCO and Water Sterilization Report is submitted and satisfied re-request TCO. If you have any questions, please get in touch with building_official@tucsonaz.gov Ground-up car wash tunnel and associated facilities | Denied | |
| 2024-07-11finaled | TR-ROW-0724-00783City permit record | Right-of-Way (ROW)Install 6’ W X 200’ L of new sidewalk.*** PREVIOUS PERMIT TR-ROW-0224-00183 (Sewer Work) | Complete | |
| 2023-04-06expired 2026-02-18 | TS-PRM-0423-00256City permit record | Fence / wallVarious Led illuminated directionals, wall signs, and monument | Issued | |
| 2022-10-20finaled | T22CM08170City permit record | Commercial BuildingGround-up car wash tunnel and associated facilities | Complete |
How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.
Code enforcement (2)
Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.
| Date | Record | What | Status |
|---|---|---|---|
| 2023-10-03closed 2023-10-24 | CE-VIO1023-05867Code enforcement case | Vegetation | Closed - Resolved |
| 2023-05-12closed 2023-05-24 | CE-VIO0523-03489Code enforcement case | Vegetation | Closed - Resolved |
Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.
This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel.
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
The permanent link and the summary above, once. No list, no follow-up unless you ask for it.
How this report was built
This is a reading of public records for parcel 141177510 — 8 permits on file from 2022 to 2026 (3 right-of-way (row), 2 certificate of occupancy, 1 right-of-way (row) - utility, 1 fence / wall) and 2 code enforcement cases — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.
The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).
Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.
