Electrical permit history — 10931 E Mary Ann Cleveland Wy
10931 E Mary Ann Cleveland Wy, Tucson — built 2020, with 7 permits on record. Review electrical, HVAC and remodel history with links to official records.
Commercial property
10931 E Mary Ann Cleveland Wy
Built 2020 — 2020s commercial stock · 7 permits on record; no permitted panel/service or HVAC work among them
Permanent link: Electrical permit history for 10931 E Mary Ann Cleveland Wy (aztucsonelectricalsolutions.com/property/14117011h/10931-e-mary-ann-cleveland-wy-tucson-az-85747) · Public records last checked 2026-08-16
- Parcel
- 14117011H
- Built
- 2020 (assessor record)
- Jurisdiction
- Tucson
- Zoning
- RX-1
- Assessor use
- County Park/Recreational Properties
- Parcel size
- 258.39 acres
- Building area
- 8,972 sq ft (assessor record)
- Sewer
- Connection on file (2019) (county sewer connection records)
- Flood zone
- X — minimal flood hazard (FEMA)
- Historic preservation
- Not on file (City of Tucson HP layers)
See the property
Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.
Is it time to upgrade?
- Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2024 addition / alteration permit is on file — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
- Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2024 addition / alteration permit is on file — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
- Fire alarm & life safetyPermitted — completion not confirmedA 2020 permit specifies this work (the permit description states “Fire Alarm & Detection Systems - New Fire Alarm System; Fire Alarm Systems - New Sq Ft: 9000”), but the available record does not show a final inspection. The permit expired without a confirmed final status. Official status: Expired. T20FC00466 — Fire Alarm & Detection Systems - New Fire Alarm System; Fire Alarm Systems - New Sq Ft: 9000
- RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.
A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.
What that usually means electrically
- Era-based check
A capacity and condition review is the usual starting point before any tenant improvement or added load. The permit record does not confirm this; an on-site inspection is required.
Most recent permit on record for this parcel: 2025-08-12 (TR-UTL-0825-01326) — 2 5x5 bell holes in dirt/blktop front for crews to obtain CP reads on gas facilities.
Permit history (7)
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2025-08-12finaled | TR-UTL-0825-01326City permit record | Right-of-Way (ROW) - Utility2 5x5 bell holes in dirt/blktop front for crews to obtain CP reads on gas facilities | Complete | |
| 2024-07-22finaled | TR-ROW-0724-00834City permit record | Addition / alterationMARY ANN CLEVELAND PATH INCLUDE CONCRETE AND PAVED PATH, HEADER CURB, AND THE ADDITION OF CURB & RAMP. NEW IMPROVEMENTS INCLUDE APPROXIMATELY 6,800 LINEAR FEET. ENDS JUST WEST OF SOUTH ATTERBURY WASH WAY AT THE WEST MOST SIDEWALK HOUGHTON ROAD, AT THE TERMINATION OF THE INTERSECTION SIDEWALK, AND PROPOSED CONSTRUCTION ON MARY ANN CLEVELAND WAY BEGINS JUST EAST OF ATTERBERRY WASH WAY AND ENDS JUST EAST OF HOUGHTON RD. | Complete | |
| 2024-07-09 | TR-ROW-0724-00773City permit record | Addition / alterationMARY ANN CLEVELAND PATH INCLUDE CONCRETE AND PAVED PATH, HEADER CURB, AND THE ADDITION OF CURB & RAMP. NEW IMPROVEMENTS INCLUDE APPROXIMATELY 6,800 LINEAR FEET. ENDS JUST WEST OF SOUTH ATTERBURY WASH WAY AT THE WEST MOST SIDEWALK HOUGHTON ROAD, AT THE TERMINATION OF THE INTERSECTION SIDEWALK, AND PROPOSED CONSTRUCTION ON MARY ANN CLEVELAND WAY BEGINS JUST EAST OF ATTERBERRY WASH WAY AND ENDS JUST EAST OF HOUGHTON RD. | Void | |
| 2024-02-27finaled | TR-ROW-0224-00212City permit record | Right-of-Way (ROW)323053 Mary Ann Cleveland Way Chemical Dosing Unit - Install new chemical dosing unit for Pima County RWRD at 10931 E. Mary Ann Cleveland Way. | Complete | |
| 2020-11-17finaled | T20RW06221City permit record | ROWN.735120- ALONG E. MARY ANN CLEVELAND WAY ACCESS EXISTING MANHOLE #49648, MANHOLE #50484, AND HANDHOLE #51320 TO PLACE NEW CABLE. TRENCH 150' EAST AND PLACE NEW CABINET | Final | |
| 2020-07-15expired 2021-09-18 | T20FC00466City permit record | Fire ConstructionFire Alarm & Detection Systems - New Fire Alarm System; Fire Alarm Systems - New Sq Ft: 9000 | Expired | |
| 2020-06-22 | T20FC00414City permit record | FIRECONSNew Fire Alarm System | Void |
How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.
Code enforcement (1)
Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.
| Date | Record | What | Status |
|---|---|---|---|
| 2026-03-31 | CE-VIO0326-01434Code enforcement case | Code enforcement case | Closed - unfounded |
Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.
This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.
Planning work at this property?
Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
Send: the permanent link and the summary above, once. Watch: one email when a new permit, inspection result or code case appears on this parcel — nothing else, and you can stop any time. No list either way.
How this report was built
This is a reading of public records for parcel 14117011H — 7 permits on file from 2020 to 2025 (2 addition / alteration, 1 right-of-way (row) - utility, 1 right-of-way (row), 1 row) and 1 code enforcement case — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.
The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).
Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.
