Electrical permit history — 8181 S Camino De Cafe
8181 S Camino De Cafe
- Electrical service: no service or distribution permit on record for this 2025 building.
- Watch for: built 2025; the live question is spare capacity for new loads, not the age of the gear.
- Other work on record: addition or alteration permit 2026 (permit not closed), new-construction permit 2025 (permit not closed), development package permit 2023 (permit not closed).
From City of Tucson permits and the Pima County Assessor, checked 13 Nov 2026. Not an inspection.
The permanent link and the summary above, sent once. No list.One email when a new permit, inspection result or code case appears on this parcel — nothing else, and you can stop any time. No list.
Is it time to upgrade?
Probably not: no service or distribution work is on record, which is normal for a building built in 2025.
- Electrical service & distributionLooks currentNo service or distribution permit on record for this 2025 building. The live question is spare capacity for new loads (EV charging, kitchen or process equipment), not the age of the gear. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
- Heating, cooling & mechanicalLooks currentBuilt 2025; no permit on record since, which is normal for equipment this age. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
- Fire alarm & life safetyLooks currentBuilt 2025; no permit on record since, which is normal for equipment this age. Any alarm or sprinkler work here predates this feed. For an occupied commercial building that is worth confirming from the panel and the inspection tags rather than assuming.
- RoofLooks currentBuilt 2025; no permit on record since, which is normal for equipment this age. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.
What that usually means electrically
- Worth confirming
Industrial and warehouse space usually means three-phase motor loads. High-bay LED retrofits and added VFDs both change the load picture.
Solar and energy potential
- Roof footprint
- ≈ 4,000 sq ft (assessor’s building area ÷ recorded stories — approximate)
- Usable for solar, planning estimate
- ≈ 2,800 sq ft (~70% after setbacks, rooftop equipment and access paths)
- Array that could fit
- on the order of 30 kW — roughly 80 panels (low-tilt ballasted rows, 400 W class modules)
- Estimated annual production
- ≈ 49,000 kWh (PVWatts, Tucson sun, low-tilt south)
- Energy-charge offset at TEP commercial rates
- Estimate $4,000–$6,500 a year (8–13¢/kWh energy + power-supply charges, by season and rate class)
The offset assumes the building uses the power as it is generated; TEP pays far less (its export rate is about 5¢/kWh) for surplus sent to the grid, so the load profile decides the real value. The 30% federal credit (§48E) still applies to commercial systems placed in service by the end of 2027 — projects that began construction by July 4, 2026 have longer; confirm timing with a tax adviser.
TEP grid capacity — mapped saturation areaThis property sits within about half a mile of “I-10 and Rita Rd near UA Tech Park”, one of 11 areas TEP has mapped as saturated with distributed generation (customer solar) relative to circuit capacity. On a saturated circuit, new solar or battery systems can trigger supplemental utility review before interconnection is approved — and a large new load such as DC fast charging or process equipment is worth a capacity conversation with TEP before a site plan hardens. The boundary here is approximate, digitized from TEP’s map of the area (PDF, July 2020); TEP’s own interconnection screening is the authority, and circuit status can have changed since the maps were published.
Flood and drainage
The federal flood map and the local one are not the same map, and they do not always agree. FEMA’s is the insurance map; the City of Tucson regulates against its own, and that is the one a permit here is judged against.
- FEMA: we did not read the federal flood map for this snapshot. Check FEMA’s flood map for this address ↗
- Local floodplain (the City of Tucson): local floodplain mapping is not reproduced here. A property can sit outside FEMA’s zone and still be inside a locally regulated floodplain, floodway, sheet-flooding area or erosion hazard setback, so check the authority’s own map before planning work. Pima County RFCD flood hazard map for parcel 141113750 ↗ · the City of Tucson ↗
The record behind this read
- Parcel
- 141113750
- Year constructed
- 2025 (assessor record)
- Permitting authority
- Tucson
- Zoning
- I-1
- Property type
- Multiuse Or Miscellaneous Industrial
- Building area
- 4,000 sq ft
- Electrical service
- No service or distribution permit on record for this 2025 building. (the era estimate is from the year built, 2025 — not a measurement)
Building area comes from the Pima County Assessor’s file published 28 Jan 2026. Check any row against Pima County’s own parcel record ↗.
What this means for work here
The most recent permit with evidence of issuance is dated 2026. The work was permitted, but final completion is not confirmed. The permit covers only the work described in that record.
What that reading rests on. The issuing offices hold 4 building permits for this parcel dated between 2023 and 2026. Two development package permits, one addition or alteration permit and one new-construction permit. None of them carries a final inspection, which is not the same as the work not happening — it means the file was never closed out.
Street and utility work at this address. The City’s file also shows two right-of-way or utility permits here (2026) — work in the street or on a utility’s lines, not on the building, so they are left out of the counts above.
Go straight to the records
Each link opens the issuing office’s own file for that record — dates, scope, status and inspections are theirs to publish, and they are all on the other side of these links.
Commercial building (2): 2026 TC-COM-0426-00459 · 2025 TC-COM-1023-02502
Development package (1): 2023 TD-DEV-0423-00208
City permit record (1): 2023 TD-DEV-0223-00132
Permit records courtesy of the City of Tucson — each link opens the City’s own file. The files are held by City of Tucson permit record (PRO) ↗ — search the parcel number 141113750.
See an error? Report a correction · About this data.
Utility and upgrade pathElectric service here is Tucson Electric Power (TEP). A service or panel upgrade needs a TEP meter release and has to meet TEP’s service requirements — meter height and location, clearances, and the point of attachment. See TEP new-service requirements and the TEP standards notes.
In the public record: All industrial property · Commercial property in 85747 · Commercial & industrial reports · Homes in 85747 · Permit data by neighborhood
Planning heavy-power or service-capacity work here?
Arizona Electrical Solutions — electrical, HVAC, underground, design-build and general contracting in Tucson (four Arizona ROC licenses). The address, parcel and this report travel with your request.
Want a plain-English brief of this record first?
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
Permanent link: Electrical permit history for 8181 S Camino De Cafe (aztucsonelectricalsolutions.com/property/141113750/8181-s-camino-de-cafe-tucson-az-85747)
Electrical summary — 8181 S Camino De Cafe, Tucson, AZ 85747
Parcel 141113750Year built 2025Building area 4,000 sq ftPermit history City of TucsonRecord checked 13 Nov 2026
- Electrical service: no service or distribution permit on record for this 2025 building.
- Watch for: built 2025; the live question is spare capacity for new loads, not the age of the gear.
- Other work on record: addition or alteration permit 2026 (permit not closed), new-construction permit 2025 (permit not closed), development package permit 2023 (permit not closed).
Permits on record, newest first
| Date | Permit | Type | Status |
|---|---|---|---|
| Sep 2026 | TC-COM-0426-00459 | Addition or alteration permit | Open |
| Feb 2025 | TC-COM-1023-02502 | New-construction permit | Open |
| Dec 2023 | TD-DEV-0423-00208 | Development package permit | Open |
Voided or withdrawn permit records: 1 (not listed).
Street and utility work at this address: 2 (work in the street, not on the building; not listed).
Ask your inspector or engineer to check
- The main switchboard’s nameplate rating and the age and make of the distribution gear.
- Whether the arc-flash labels match the installed gear (NFPA 70E reviews them every five years).
Live report: https://www.aztucsonelectricalsolutions.com/property/141113750/8181-s-camino-de-cafe-tucson-az-85747
How this property compares nearby
Properties on S CAMINO DE CAFE hold 88 City permits on record, 36 of them since 2022.
Counts and years from the same public records.
How this report was built
This is a reading of public records for parcel 141113750 — 4 City permits on file from 2023 to 2026 and 2 street or utility permits — assembled from the Pima County parcel file and the City of Tucson’s published permit layers together with the City’s own migrated permit archive. City of Tucson permit records go back to the mid-1990s, with fewer before 2006, when the City’s older paper files were only partly digitized. The construction year and living area on this page come from our saved copy of the Assessor’s own published data file (dated 28 Jan 2026). The sewer connection file and the flood map were not read for this snapshot. A permit that is absent here may predate the digitized record or sit in a system this snapshot did not read. This record was built 13 Nov 2026 from the City’s permit export of that day.
What this report is and is not. This is a screening report written by Arizona Electrical Solutions from public records — the year the building went up, how it is classified and what has been permitted. It is not an inspection, an appraisal, a floodplain determination, or engineering, legal or purchasing advice, and nothing in it confirms what is installed at this address: a permit shows what was permitted, a missing permit does not mean nothing was done, and era notes describe what was common when the building went up, not what is in this one. Price figures are estimates, not quotes. The issuing agency’s own record is the official one and controls over anything summarized here — every permit links to it. Only someone looking at the panel can confirm the service size, the panel brand or the wiring.
Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).
Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.
Permit history: City of Tucson addresses, back to the mid-1990s. Elsewhere in Pima County: property facts from the Assessor, no permit history yet.