Electrical permit history — 8300 E Valencia Rd

8300 E Valencia Rd, Tucson — built 2009, with 54 permits on record. Review electrical, HVAC and remodel history with links to official records.

Electrical Property Screening Report · Commercial property

8300 E Valencia Rd

A screening report for electrical planning, assembled from public-record indicators. It is not an official record and every figure in it should be verified against the issuing agency before it is relied on.

Verify parcel data at official source ↗

Built 2009 — 2000s commercial stock · 54 permits on record; no permitted panel/service or HVAC work among them

Is it time to upgrade?

  • Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2018 fire automatic extinguishing system permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. No permitted service work shows in the record we read — unremarkable for a building of this age, whose service was sized to modern code at construction. The live question is spare capacity for new loads (EV charging, kitchen or process equipment), not the age of the gear. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
  • Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2018 fire automatic extinguishing system permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. The assessor records cooling as WARMED AND COOLED AIR and heating as Forced Air. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
  • Fire alarm & life safetyFinaled permit foundA newer 2018 permit for the same system is recorded as “Expired” — The permit expired without a confirmed final status. The permit description states “Fire Alarm & Detection Systems - MODIFY THE EXISTING SECURITY PANEL; Fire Alarm Systems - Devices Modified: 5”. Last permitted 2018 (8 years ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. T18FC00650 — Install one new Spray Booth Fire Suppression System
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. The assessor records the roof as Composition Shingle. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitized. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Worth confirming

    There is an electrical reconnect permit from 2013. The service was disconnected at some point and brought back — usually after a vacancy, a utility disconnect, or work that required the power off. Worth knowing what prompted it.

  • Era-based check

    A capacity and condition review is the usual starting point before any tenant improvement or added load. The permit record does not confirm this; an on-site inspection is required.

  • Routine

    A trade permit was pulled in 2014. Trade permits cover electrical, plumbing, and mechanical work individually, so some permitted trade work has been done here since.

Solar and energy potential

Roof footprint
≈ 162,677 sq ft (county building-footprint layer, 20 structures)
Usable for solar, planning estimate
≈ 113,900 sq ft (~70% after setbacks, rooftop equipment and access paths)
Array that could fit
on the order of 1,250 kW — roughly 3,130 panels (low-tilt ballasted rows, 400 W class modules)
Estimated annual production
≈ 2,060,000 kWh (PVWatts, Tucson sun, low-tilt south)
Energy-charge offset at TEP commercial rates
$165,000–$268,000 a year (8–13¢/kWh energy + power-supply charges, by season and rate class)

Planning-level arithmetic on the roof area above — not a shading study, a structural review or a design. The offset assumes the building uses the power as it is generated; TEP pays far less (its export rate is about 5¢/kWh) for surplus sent to the grid, so the load profile decides the real value. The 30% federal credit (§48E) still applies to commercial systems placed in service by the end of 2027 — projects that began construction by July 4, 2026 have longer; confirm timing with a tax adviser.

TEP grid capacity — mapped saturation areaThis property sits in or on the edge of “I-10 and Rita Rd near UA Tech Park”, one of 11 areas TEP has mapped as saturated with distributed generation (customer solar) relative to circuit capacity. On a saturated circuit, new solar or battery systems can trigger supplemental utility review before interconnection is approved — and a large new load such as DC fast charging or process equipment is worth a capacity conversation with TEP before a site plan hardens. The boundary here is approximate, digitized from TEP’s map of the area (PDF, July 2020); TEP’s own interconnection screening is the authority, and circuit status can have changed since the maps were published.

Get a commercial solar & switchgear analysis

See the property

Satellite imagery © Google. Imagery can predate recent work and shows nothing about what is inside — context, not evidence.

Flood and drainage

The federal flood map and the local one are not the same map, and they do not always agree. FEMA’s is the insurance map; the City of Tucson regulates against its own, and that is the one a permit here is judged against.

The record behind this read

Parcel
14111002D
Year constructed
2009 (assessor record)
Permitting authority
Tucson
Zoning
I-1
Property type
Mini-Storage
Building area
1,356 sq ft
Cooling
WARMED AND COOLED AIR
Heating
Forced Air

The building area, cooling and heating above come from the Pima County Assessor’s record, as we read it on 28 Jan 2026. Each other row names its own source.

The most recent permitted work on this parcel was in 2026. That says the parcel was worked on under permit, not what the work covered — a roof, a pool or a changeout tells you nothing about the electrical service. Work done without a permit leaves no trace here at all.

What this means for work here

Informational public-record summary — not engineering, inspection, valuation or purchasing advice, and not the official record.

The most recent permitted work on this parcel was in 2026. That says the parcel was worked on under permit, not what the work covered — a roof, a pool or a changeout tells you nothing about the electrical service. Work done without a permit leaves no trace here at all.

What that reading rests on. The issuing offices hold 54 building permits for this parcel dated between 2008 and 2026. By category the work is new construction (25), trade permit (7), permanent sign (3) and addition / alteration (3). 38 of them carry a final inspection; the other 16 were issued, expired or are still open, which is not the same as work completed. There are 2 code-enforcement cases recorded against the parcel, all of them closed. We do not reproduce complaint text — it routinely names people with no connection to the property.

Go straight to the records

Each link opens the issuing office’s own file for that record — dates, scope, status and inspections are theirs to publish, and they are all on the other side of these links.

Read the records yourself. We republish selected facts and record numbers so you can find the file; the issuing agency’s record controls. The files are held by City of Tucson permit record (PRO) ↗ — search the parcel number 14111002D. Permit and parcel information courtesy of the City of Tucson and Pima County; their files are the official record and control over anything summarized here.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.

Utility and upgrade pathElectric service here is Tucson Electric Power (TEP). A service or panel upgrade needs a TEP meter release and has to meet TEP’s service requirements — meter height and location, clearances, and the point of attachment. See TEP new-service requirements and the TEP standards notes.

In the public record: All commercial property · Commercial property in 85747 · Commercial & industrial reports · Homes in 85747 · Permit data by neighborhood

Planning work at this property?

Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

What the flood note is not. The FEMA map linked above is the National Flood Hazard Layer — the federal insurance map. Local floodplain mapping is not reproduced here; use the authority’s own map, linked above. Nothing here is a floodplain determination, an elevation certificate, or a substitute for one. A parcel can straddle a boundary, and a Letter of Map Amendment can remove a structure the map still covers. For a determination, ask the floodplain administrator for the jurisdiction named above; for a design that has to satisfy one, that is work we do.

How this property compares nearby

Properties on E VALENCIA RD hold 1,223 City permits on record, 866 of them since 2022.

Computed from the same public records as this report — counts and years, not an appraisal.

Complete permit record (56 entries)

Every permit and case we hold for this parcel, newest first. Each number links to the official file.

YearNumberTypeStatus
2026TC-COM-0925-01617Commercial New Building PermitInspections
2026TC-COM-0925-01616Commercial New Building PermitInspections
2026TC-COM-0925-01618Commercial New Building PermitInspections
2026TC-COM-0925-01619Commercial New Building PermitInspections
2026TC-COM-0925-01614Commercial New Building PermitInspections
2025TD-DEV-0924-00245Development PackageInspections
2025TS-PRM-0825-00363Permanent Sign PermitInspections Complete
2024recordROW Permit - City CIP/JOCComplete
2023recordRight-of-Way (ROW) Permit - UtilityComplete
2023recordRight-of-Way (ROW) Permit - UtilityComplete
2021T21CM04811Commercial Trade PermitExpired
2021T21SA00054Zoning ComplianceComplete
2019T19DV09101COMMERCIAL ZONINGNOVERIFY
2018T18FC00608Fire Alarm System PermitExpired
2018T18FC00650Fire Automatic Extinguishing System PermitComplete
2018T18BA00053Stormwater BasinApproved
2014T14CM04995Commercial Trade PermitComplete
2014S14-013 Land Split/Lot SplitCanceled
2013T13OT00340Permanent Sign PermitComplete
2013T13CM01759Commercial Trade PermitComplete
2013T13CM01107Commercial Trade PermitCanceled
2013T13CM00932Commercial Trade PermitComplete
2012D07-0013Development PackageApproved
2011T11OT00857Annual Portable Sign ComplianceCanceled
2011T11DV02652MULTIPLE TYPESCOMPLIAN
2011T11SA00101Zoning ComplianceApproved
2010T10OT02394Annual Portable Sign ComplianceComplete
2010T10OT00737Permanent Sign PermitComplete
2009T08CM03426Commercial New Building PermitComplete
2009T08CM03988Commercial New Building PermitComplete
2009T08CM03989Commercial New Building PermitComplete
2009T08CM03990Commercial New Building PermitComplete
2009T08CM03991Commercial New Building PermitComplete
2009T08CM03425Commercial New Building PermitComplete
2009T08CM03427Commercial New Building PermitComplete
2009T08CM03546Commercial Addition/Alteration PermitComplete
2009T08CM03547Commercial Addition/Alteration PermitComplete
2008T08CM02770Commercial Addition/Alteration PermitComplete
2008T08PL01668Commercial Trade PermitComplete
2008T08BU00198GradingCanceled
2008T08BU01264Commercial Fence/Wall PermitComplete
2008T07BU01578GradingCanceled
2008T07CM04846Commercial New Building PermitComplete
2008T07CM04847Commercial New Building PermitComplete
2008T07CM04683Commercial New Building PermitComplete
2008T07CM04684Commercial New Building PermitComplete
2008T07CM04685Commercial New Building PermitComplete
2008T07CM04686Commercial New Building PermitComplete
2008T07CM04688Commercial New Building PermitComplete
2008T07CM04689Commercial New Building PermitComplete
2008T07CM04690Commercial New Building PermitComplete
2008T07CM04681Commercial New Building PermitComplete
2008T07CM04682Commercial New Building PermitComplete
2008T07CM04687Commercial New Building PermitComplete
2008T07CM04845Commercial New Building PermitComplete
2008T08PL00046Commercial Trade PermitComplete

prints this report — permits, comparisons and sources — as a clean document

How this report was built

This is a reading of public records for parcel 14111002D — 54 City permits on file from 2008 to 2026 and 2 code enforcement cases — assembled from the Pima County parcel file and the City of Tucson’s published permit layers together with the City’s own migrated permit archive, whose records reach back to the mid-1990s. Some records were still not read for this snapshot: City permit records before the mid-1990s were never fully digitized. The construction year, living area, cooling, heating, roof, walls on this page come from our saved copy of the Assessor’s own published data file (dated 2026-01-28). The sewer connection file and the flood map were not read for this snapshot. Absence of a permit here is NOT evidence work was never permitted — it may predate the digitized record or sit in a system this snapshot did not read. Public records snapshot taken 2026-09-22.

The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.