Electrical permit history — 5651 S Houghton Rd
5651 S Houghton Rd, Tucson — built 2025, with 20 permits on record. Review electrical, HVAC and remodel history with links to official records.
Commercial property
5651 S Houghton Rd
Build year not published — permits on file from 2025 · 20 permits on record; no permitted panel/service or HVAC work among them
Permanent link: Electrical permit history for 5651 S Houghton Rd (aztucsonelectricalsolutions.com/property/141019160/5651-s-houghton-rd-tucson-az-85747) · Public records last checked 2026-08-17
- Parcel
- 141019160
- Built
- 2025 (earliest permit on file)
- Jurisdiction
- Tucson
- Zoning
- PAD-12
- Assessor use
- Restaurant Fast Food
- Parcel size
- 1.23 acres
- Sewer
- Connection on file (2025) (county sewer connection records)
- Flood zone
- X — minimal flood hazard (FEMA)
- Historic preservation
- Not on file (City of Tucson HP layers)
See the property
Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.
Is it time to upgrade?
- Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2026 fire operational permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
- Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2026 fire operational permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
- Fire alarm & life safetyCurrentLast permitted this year (2026). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. TF-FCP-0426-00224 — Install bulk CO2 tank outside and CO2 cage. Install conduit to run CO2 lines. Install CO2 detection system at point of use.
- RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.
A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.
What that usually means electrically
- Worth confirming
Food service carries heavy, cycling kitchen loads and exhaust interlocks. Capacity and existing panel space are the first things to verify on any remodel.
Recorded sales (1)
| Date | Price | Type |
|---|---|---|
| 2025-11-03 | $1,150,000 | Warranty Deed |
Recorded sales are the sales the Pima County Assessor has on file from affidavits of property value — not every transfer, not listings, and not a valuation. Parties are never shown here. A sale with no permitted electrical work since is worth knowing before the next sale or a remodel.
Most recent permit on record for this parcel: 2026-06-04 (TC-CFO-0626-00099) — New McDonald's building.
Permit history (20)
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2026-06-04finaled | TC-CFO-0626-00099City permit record | Certificate of OccupancyNew McDonald's building | Complete | |
| 2026-05-21finaled | TF-FOP-0526-00718City permit record | Fire OperationalPlaces of assembly permit for McDonald's located at 5651 S Houghton Road | Complete | |
| 2026-04-02finaled | TF-FCP-0426-00224City permit record | Fire ConstructionInstall bulk CO2 tank outside and CO2 cage. Install conduit to run CO2 lines. Install CO2 detection system at point of use. | Complete | |
| 2026-04-02finaled | TF-FOP-0426-00442City permit record | Fire OperationalInstall bulk CO2 tank outside and CO2 cage. Install conduit to run CO2 lines. Install CO2 detection system at point of use. | Complete | |
| 2026-03-20finaled | TR-ROW-0326-00331City permit record | Right-of-Way (ROW)Install concrete sidewalk to existing asphalt bike path - adjust asphalt as needed RE-APPLY REFERENCE PERMIT # TR-ROW-1225-01519 | Complete | |
| 2026-03-19expires 2026-12-01 | TC-COM-0326-00392City permit record | Fence / wallRetaining wall for north edge of Parking Lot - in reference to TD-DEV-0525-00132 | Inspections | |
| 2026-03-18 | TC-COM-0326-00387City permit record | Fence / wallStructural Plans for Trash Enclosure Wall. Sub Record for TC-COM-0525-01005 and TD-DEV-0525-00132 | Approved - awaiting customer attention | |
| 2026-03-04finaled | TF-FCP-0326-00140City permit record | Fire ConstructionSuppression system install | Complete |
Show 12 older records
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2026-01-30finaled | TR-UTL-0126-00195City permit record | Right-of-Way (ROW) - UtilityCox to proof and pull 498' for catv commercial business tie. | Complete | |
| 2026-01-21expires 2027-02-17 | TF-FOP-0126-00087City permit record | Fire OperationalVOIDED - per Ron from Accura - operational for CO2 beverage system | Void | |
| 2026-01-14 | TF-FCP-0126-00021City permit record | Fire ConstructionVOID - Already submitted Construction Permit#TF-FCP-1225-01046. You need to apply for a Fire General Operational Permit. - CO2 DETECTION SYSTEM AND FIRE ALARM | Void | |
| 2025-12-22finaled | TF-FCP-1225-01045City permit record | Fire ConstructionSPRINKLER MONITORING PLUS ANSUL AND co2 DETECTION INTERFACE | Complete | |
| 2025-12-22expires 2026-08-17 | TF-FCP-1225-01046City permit record | Fire ConstructionVOIDED per Ron from Accura - 3 POINTS OF USE CO2 DETECTION SYSTEM | Void | |
| 2025-12-15expired 2026-02-20 | TR-ROW-1225-01519City permit record | Right-of-Way (ROW)Install concrete sidewalk to existing asphalt bike path - adjust asphalt as needed Renew 30 days from 01/21/2026 new expiration date is 02/20/2026 2/18/26- 2ND RENEWAL REQUEST DENIED | Inspections | |
| 2025-11-25 | TR-ROW-1125-01446City permit record | Right-of-Way (ROW)Install concrete sidewalk to existing asphalt bike path - adjust asphalt as needed | Needs resubmittal | |
| 2025-09-03expired 2026-05-02 | TC-UTL-0925-00077City permit record | UtilitiesNew McDonald's Site and Building | Inspections | |
| 2025-08-12expires 2026-11-10 | TC-COM-0825-01515City permit record | Solar PVInstallation of 21.24 KW mount solar electrical system on a carport for a new McDonald's (TC-COM-0525-01005) | Needs resubmittal | |
| 2025-07-25expires 2026-11-02 | TS-PRM-0725-00315City permit record | Sign - PermanentInstallation of several McDonald's signage | Inspections | |
| 2025-05-15expires 2026-12-01 | TC-COM-0525-01005City permit record | Commercial BuildingNew McDonald's building | Issued | |
| 2025-05-09expires 2029-05-28 | TD-DEV-0525-00132City permit record | Development PackageRev 1 - update to transformer, storage shed, access ramp, pavement, started 01.30.2026 ** New McDonald's Site and Building | Needs resubmittal |
How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.
Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.
This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.
Planning work at this property?
Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
The permanent link and the summary above, sent once. No list.One email when a new permit, inspection result or code case appears on this parcel — nothing else, and you can stop any time. No list.
How this report was built
This is a reading of public records for parcel 141019160 — 20 permits on file from 2025 to 2026 (5 fire construction, 3 fire operational, 3 right-of-way (row), 2 fence / wall) — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-17; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.
The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).
Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.
