Electrical permit history — 1000 E Valencia Rd

1000 E Valencia Rd, Tucson — built 1957, with 9 permits on record. Review electrical, HVAC and remodel history with links to official records.

Commercial property

1000 E Valencia Rd

Built 1957 — 1950s commercial stock · 9 permits on record; no permitted panel/service or HVAC work among them

Parcel
140430100
Built
1957 (county record)
Jurisdiction
Tucson
Zoning
I-1
Assessor use
Municipal Industrial Property
Parcel size
4.67 acres
Building area
11,077 sq ft (assessor record)
Sewer
Connection on file (1980, 1981, 1993) (county sewer connection records)
Flood zone
X (shaded) — 0.2% annual-chance flood hazard (FEMA)
Historic preservation
Not on file (City of Tucson HP layers)

See the property

County aerial photograph centered on 1000 E Valencia Rd, parcel outlined

Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.

Is it time to upgrade?

  • Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
  • Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
  • Fire alarm & life safetyNot in this windowNothing in the permit records we read for this parcel that names this system. Any alarm or sprinkler work here predates this feed. For an occupied commercial building that is worth confirming from the panel and the inspection tags rather than assuming.
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Era-based check — high priority

    Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.

  • Era-based check

    NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.

  • Worth confirming

    Industrial and warehouse space usually means three-phase motor loads. High-bay LED retrofits and added VFDs both change the load picture.

  • Worth confirming

    A pool or spa was permitted in 2021. Pool equipment brings its own bonding grid, GFCI requirements, and usually a subpanel — and the bonding rules have tightened since, so older installations are worth verifying.

Recorded sales (2)

Recorded transfers from the Pima County Assessor — 2 of 2
DatePriceType
2003-04-02$3,500,000Special Warranty Deed
2003-04-02$2,500,000Special Warranty Deed

Recorded sales are the sales the Pima County Assessor has on file from affidavits of property value — not every transfer, not listings, and not a valuation. Parties are never shown here. A sale with no permitted electrical work since is worth knowing before the next sale or a remodel.

Most recent permit on record for this parcel: 2023-10-12 (TR-ROW-1023-01250) — Right of Way, Traffic Control for the El Tour de Tucson 2023 Traffic Control setup/take down Friday, 11/17/203 Saturday, 11/18/2023.

Permit history (9)

Permit history for this parcel — 8 of 9 records
DateRecordWhatStatusValue
2023-10-12finaledTR-ROW-1023-01250City permit recordRight-of-Way (ROW)Right of Way, Traffic Control for the El Tour de Tucson 2023 Traffic Control setup/take down Friday, 11/17/203 Saturday, 11/18/2023Complete
2023-09-27finaledTR-UTL-0923-02591City permit recordRight-of-Way (ROW) - UtilityRE: Expired Permit TR-UTL-0723-02014: WO T65857. TEP will be removing 1 pole in the ROW.Complete
2023-07-13finaledTR-UTL-0723-02014City permit recordRight-of-Way (ROW) - UtilityWO T65857. TEP will be removing 1 pole in the ROW.Complete
2021-12-13finaledT21RW05250City permit recordROWTEP WILL BE REMOVING 1 POLE IN THE ROW A 2'X2' HOLE 6' DEEP WILL BE BACKFILLED WITH/OUT SIDEWALK IMPACT. START DATE PUSHED BACK DUE TO HOLIDAY RESTRICTIONS. ADDRESS ON APP IS 990 E VALENCIA RD PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF PRECONSTRUCTION MEETING NOTE: E VALENCIA RD IS UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2" MILL AND OVERLAY FOR 50' IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. 1. BUS STOP IN THE AREA, CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 24-HOURS PRIOR TO START OF WORK FOR COORDINATION. 2. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 3. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. 4. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION. 5. MAINTAIN PEDESTRIAN ACCESS 6. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. IF WEEKEND WORK, MAKE CONTACT 48 HOURS PRIOR TO THE WEEKEND. DAN ROBERTSON- 520-400-6722 OR TOM ADKINS- 520-400-3813Final
2021-11-29finaledT21RW05092City permit recordPool / spaPERFORM 2 VERTICAL BORINGS IN THE TUCSON ROW TO AN APPROXIMATE DEPTHS OF 5 FEET BELOW EXISTING GRADE WITH AUGER THAT IS 8 INCHES IN DIAMETER. THE WORK IS BEING PERFORMED FOR WSP USA INC (PM: Jose Aguilar, PE, ENV SP) WORKING FOR TAA. BASED ON PIMA MAPS THE COT ROW INCLUDES BORINGS P-1 and P-2 WILL BE PERFORMED IN THE ROADWAY (SEE ATTACHED PLAN). BORINGS WILL REQUIRE ONE SINGLE LANE CLOSURE USING FLAGGERS WITH APPROPRIATE SIGNAGE FOR TRAFFIC CONTROL. EACH LOCATION WILL TAKE APPROXIMATELY 30 MINUTES TO AN HOURS TO COMPLETE. BORING WILL BE BACKFILLED WITH COMBINATION WITH SOIL CUTTINGS AND CONCRETE AND THE SURFACE WILL BE PATCHED WITH ASPHALT. PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. 1. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 2. PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION. 3. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH. 4. BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.) 5. ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE. 6. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. 7. REPLACE/ REFRESH ALL STRIPING THAT IS INTERRUPTED BY PATCHES. 8. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION 9. MAINTAIN PEDESTRIAN ACCESS 10. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. IF WEEKEND WORK, MAKE CONTACT 48 HOURS PRIOR TO THE WEEKEND. DAN ROBERTSON- 520-400-6722 OR TOM ADKINS- 520-400-3813 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.Final
2021-06-03finaledT21RW02697City permit recordRight-of-Way (ROW)Install vehicle detector on traffic signal mast arms. Work will take less than 30 minutes per occurrComplete
2021-04-06finaledT21RW01597City permit recordROWJOB ORDER CONTRACT FOR TRAFFIC SIGNAL AND STREET LIGHT CONSTRUCTION, CONTRACT NO. 181906-02 REWIRING THE INTERSECTION OF PARK AV AND VALENCIA ROAD. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION. MAINTAIN PEDESTRIAN ACCESS.Final
2018-01-19finaledT18RW00352City permit recordROWPLANTING TALL POT TREES IN MEDIANS ON VALENCIA RD FROM PARK AVE TO TUCSON BLFinal
Show 1 older record
Permit history for this parcel — remaining 1 records
DateRecordWhatStatusValue
2002-07-30T02AN00693City permit recordADDRNEWIssued

How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.

Code enforcement (1)

Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.

Code enforcement history for this parcel — 1 of 1 records
DateRecordWhatStatus
2011-10-12T11DV08214Code enforcement caseCode enforcement caseComplian

Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.

Planning work at this property?

Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this report was built

This is a reading of public records for parcel 140430100 — 9 permits on file from 2002 to 2023 (3 row, 2 right-of-way (row), 2 right-of-way (row) - utility, 1 pool / spa) and 1 code enforcement case — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.

The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.