Electrical permit history — 2717 E Corona Rd

2717 E Corona Rd, Tucson — built 2025, with 33 permits on record. Review electrical, HVAC and remodel history with links to official records.

Commercial property

2717 E Corona Rd

Built 2025 — 2020s commercial stock · 33 permits on record; no permitted panel/service or HVAC work among them

Parcel
14042025A
Built
2025 (assessor record)
Jurisdiction
Tucson
Zoning
I-1
Assessor use
Warehouse W/ Office/ Retail
Parcel size
8.97 acres
Building area
147,646 sq ft (assessor record)
Sewer
Connection on file (2024) (county sewer connection records)
Flood zone
X — minimal flood hazard (FEMA)
Historic preservation
Not on file (City of Tucson HP layers)

See the property

County aerial photograph centered on 2717 E Corona Rd, parcel outlined

Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.

Is it time to upgrade?

  • Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2026 fire operational permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
  • Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2026 fire operational permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
  • Fire alarm & life safetyCurrentLast permitted 2025 (1 year ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. TF-FCP-0925-00711 — modification to existing system 17 new 5.6k 155 Deg. Pendents and 10 new 16.8k 212 Deg. ESFR Pendents.
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Worth confirming

    Industrial and warehouse space usually means three-phase motor loads. High-bay LED retrofits and added VFDs both change the load picture.

Recorded sales (1)

Recorded transfers from the Pima County Assessor — 1 of 1
DatePriceType
2022-02-07$1,400,000Warranty Deed

Recorded sales are the sales the Pima County Assessor has on file from affidavits of property value — not every transfer, not listings, and not a valuation. Parties are never shown here. A sale with no permitted electrical work since is worth knowing before the next sale or a remodel.

Most recent permit on record for this parcel: 2026-06-23 (TS-PRM-0626-00238) — Install one set of non illuminated flat cut out aluminum letters.

Permit history (33)

Permit history for this parcel — 8 of 33 records
DateRecordWhatStatusValue
2026-06-23finaledTS-PRM-0626-00238City permit recordSign - PermanentInstall one set of non illuminated flat cut out aluminum lettersInspections complete
2026-01-21finaledTC-CFO-0126-00018City permit recordCertificate of OccupancyWillmeng requests temporary certificate of occupancy on suite 150 of the Corona Commerce Center project due to the building permit T22CM05804 and development permit DP22-0214 remaining open due to remediation work ongoing in the north storm water retention area. Construction is complete on suite 150 and we have passed all final inspections and satisfied all conditions except closing out the building and development permits of the shell building. We request level 4 occupancy level for a period of 30 days.Complete
2026-01-20expires 2026-09-01TC-COM-0126-00078City permit recordCommercial BuildingErect and Anchor Tall metal shelving (new pallet rack from Interlake Mecalux). No field welding. Licensed contractor is Storage Equipment Systems. Occupancy in suite by GC permits.Issued
2026-01-20finaledTF-FOP-0126-00086City permit recordFire OperationalHigh Pile review. Install of Pallet racks is TC-COM-0126-00078. All suite occupancy is under GC's permit TC-COM-0325-00541Complete
2025-12-29finaledTR-UTL-1225-02204City permit recordRight-of-Way (ROW) - UtilityCOX TO OVERLASH 1571' AERIAL FIBER AND COAX, PULL 150' TO INSTALL NEW CATV CONDUIT FOR SYSTEM TIE. SET NEW 2'X3' VAULTComplete
2025-12-05finaledTF-FCP-1225-01013City permit recordFire ConstructionMODIFICATION, ADDING 2 CONTROL MODULESComplete
2025-09-04finaledTF-FCP-0925-00711City permit recordFire Constructionmodification to existing system 17 new 5.6k 155 Deg. Pendents and 10 new 16.8k 212 Deg. ESFR Pendents.Complete
2025-09-04finaledTF-FCP-0925-00712City permit recordFire Constructionmodification to existing system 17 new 5.6k 155 Deg. Pendents and 10 new 16.8k 212 Deg. ESFR Pendents.Complete
Show 25 older records
Permit history for this parcel — remaining 25 records
DateRecordWhatStatusValue
2025-09-04finaledTF-FCP-0925-00713City permit recordFire Constructionmodification to existing system 18 new 5.6k 155 Deg. Pendents and 42 new 16.8k 212 Deg. ESFR Pendents.Complete
2025-09-04finaledTF-FCP-0925-00714City permit recordFire Constructionmodification to existing system 10 new 5.6k 155 Deg. Pendents and 1 new 16.8k 212 Deg. ESFR Pendent.Complete
2025-09-04finaledTF-FCP-0925-00715City permit recordFire Constructionmodification to existing system 11 new 5.6k 155 Deg. Pendents and 1 new 16.8k 212 Deg. ESFR Pendent.Complete
2025-09-04finaledTF-FCP-0925-00716City permit recordFire Constructionmodification to existing system 17 new 5.6k 155 Deg. Pendents and 42 new 16.8k 212 Deg. ESFR Pendents.Complete
2025-09-03finaledTR-ROW-0925-01084City permit recordRight-of-Way (ROW)**CONTINUATION OF PERMIT TR-ROW-0525-00711** This right of way work will be associated with the Corona Commerce Center project. Project Building Permit #T22CM05804 and Development Permit #DP22-0214. The scope involves adding a sidewalk and drive entrances to the project on the Corona Road side. PER PAG STANDARD DETAIL 200&206Complete
2025-08-01expired 2026-03-22TS-PRM-0825-00329City permit recordSign - PermanentInstall (2) non illuminated monument signs consisting of non illuminated 1/2" thick flat cut out letters mounted flush to balck granite tile background on cast in place concrete bases. Bases to be installed by others.Issued
2025-06-26finaledTF-FCP-0625-00511City permit recordFire ConstructionUnderground Fire LineComplete
2025-05-29expired 2025-08-05TR-UTL-0525-00859City permit recordRight-of-Way (ROW) - UtilityInstalling approximately 1000' of new main in dirt via bore method.Inspections
2025-05-21finaledTR-ROW-0525-00711City permit recordRight-of-Way (ROW)This right of way work will be associated with the Corona Commerce Center project. Project Building Permit #T22CM05804 and Development Permit #DP22-0214. The scope involves adding a sidewalk and drive entrances to the project on the Corona Road side. PER PAG STANDARD DETAIL 200&206 Renew 60 days as of 07/02/2025, new expiration date 08/31/2025Complete
2025-04-17finaledTZ-CMP-0425-00060City permit recordZoning Verification Letterlight industrial project under constructionComplete
2025-03-18finaledTC-COM-0325-00539City permit recordCommercial BuildingCommercial tenant improvement for existing shell buildingComplete
2025-03-18finaledTC-COM-0325-00540City permit recordCommercial BuildingCommercial tenant improvement for exiting shell buildingComplete
2025-03-18finaledTC-COM-0325-00541City permit recordCommercial BuildingTenant improvement to an exiting shell buildingComplete
2025-03-18finaledTC-COM-0325-00542City permit recordDemolitionREV2: Electrical: Sheet E0.1 • Updated the Sheet Index. Sheet E1.3 • Added Lighting Demolition Sheet. Sheet E2.3 • Revised Lighting circuiting and Switching in Warehouse. Sheet E2.6 • Revised Lighting circuiting in Vestibule. Sheet E6.2 • Revised Lighting load on Panel Schedule ‘S150H’. Sheet Response G0. 0 Revised Schedule of Drawings to included E1.3. G0.1 Revised History of Drawings. E1.3 added. G0.2 - G1.0 Demising walls now shown as being built under th eir respective suite permits. A0.1 Door Schedule updated to include vestibule doors. Door hardware group 4 added to schedule to accommodate vestibules . A1.1 – A1.12 Demising walls included under this permit were updated, tagged, and clouded. Vestibules noted and dimensioned. Bollards added around electrical panels and transformers in warehouse . A7.2 Detail 6 added for contractor constructability. REV1: Electrical: Sheet E0.1 • Updated the Sheet Index. Sheet E1.3 • Added Lighting Demolition Sheet. Sheet E2.3 • Revised Lighting circuiting and Switching in Warehouse. Sheet E2.6 • Revised Lighting circuiting in Vestibule. Sheet E6.2 • Revised Lighting load on Panel Schedule ‘S150H’. Sheet Response G0. 0 Revised Schedule of Drawings to included E1.3. G0.1 Revised History of Drawings. E1.3 added. G0.2 - G1.0 Demising walls now shown as being built under th eir respective suite permits. A0.1 Door Schedule updated to include vestibule doors. Door hardware group 4 added to schedule to accommodate vestibules . A1.1 – A1.12 Demising walls included under this permit were updated, tagged, and clouded. Vestibules noted and dimensioned. Bollards added around electrical panels and transformers in warehouse . A7.2 Detail 6 added for contractor constructability. Tenant improvement on existing shell building.Complete
2025-03-18finaledTC-COM-0325-00543City permit recordDemolitionREV2: Electrical: Sheet E0.1 • Updated the Sheet Index. Sheet E1.3 • Added Lighting Demolition Sheet. Sheet E2.3 • Revised Lighting circuiting and Switching in Warehouse. Sheet E2.6 • Revised Lighting circuiting in Vestibule. Sheet E6.2 • Revised Lighting load on Panel Schedule ‘S150H’. Sheet Response G0. 0 Revised Schedule of Drawings to included E1.3. G0.1 Revised History of Drawings. E1.3 added. G0.2 - G1.0 Demising walls now shown as being built under th eir respective suite permits. A0.1 Door Schedule updated to include vestibule doors. Door hardware group 4 added to schedule to accommodate vestibules . A1.1 – A1.12 Demising walls included under this permit were updated, tagged, and clouded. Vestibules noted and dimensioned. Bollards added around electrical panels and transformers in warehouse . A7.2 Detail 6 added for contractor constructability. REV1: Electrical: Sheet E0.1 • Updated the Sheet Index. Sheet E1.3 • Added Lighting Demolition Sheet. Sheet E2.3 • Revised Lighting circuiting and Switching in Warehouse. Sheet E2.6 • Revised Lighting circuiting in Vestibule. Sheet E6.2 • Revised Lighting load on Panel Schedule ‘S150H’. Sheet Response G0. 0 Revised Schedule of Drawings to included E1.3. G0.1 Revised History of Drawings. E1.3 added. G0.2 - G1.0 Demising walls now shown as being built under th eir respective suite permits. A0.1 Door Schedule updated to include vestibule doors. Door hardware group 4 added to schedule to accommodate vestibules . A1.1 – A1.12 Demising walls included under this permit were updated, tagged, and clouded. Vestibules noted and dimensioned. Bollards added around electrical panels and transformers in warehouse . A7.2 Detail 6 added for contractor constructability. Tenant improvement on existing shell building.Complete
2025-03-18finaledTC-COM-0325-00544City permit recordDemolitionREV2: Electrical: Sheet E0.1 • Updated the Sheet Index. Sheet E1.3 • Added Lighting Demolition Sheet. Sheet E2.3 • Revised Lighting circuiting and Switching in Warehouse. Sheet E2.6 • Revised Lighting circuiting in Vestibule. Sheet E6.2 • Revised Lighting load on Panel Schedule ‘S150H’. Sheet Response G0. 0 Revised Schedule of Drawings to included E1.3. G0.1 Revised History of Drawings. E1.3 added. G0.2 - G1.0 Demising walls now shown as being built under th eir respective suite permits. A0.1 Door Schedule updated to include vestibule doors. Door hardware group 4 added to schedule to accommodate vestibules . A1.1 – A1.12 Demising walls included under this permit were updated, tagged, and clouded. Vestibules noted and dimensioned. Bollards added around electrical panels and transformers in warehouse . A7.2 Detail 6 added for contractor constructability. REV1: New layouts, Floor Plan, Charts, calcs, finish schedule, demising wall between gridlines F&E, interior finish, casework, wood doors specs added, MEP Tenant improvement on existing shell building.Complete
2025-02-04finaledTR-ROW-0225-00163City permit recordRight-of-Way (ROW)The contractor will open trenching to install 4"-inch conduit for TEP for Benjamin Sepulveda for High Quality Electric.Complete
2025-02-03finaledTF-FCP-0225-00097City permit recordFire ConstructionSHELL BLDG., ARCHITECT PLANS SHOW 2717 ADDRESS ALSO DEDICATED FUNCTION SPRINKLER-MONITORING SYSTEM, NO OCCUPANCYComplete
2025-01-28finaledTC-COM-0125-00177City permit recordFence / wallRetaining Wall - Main Permit Building T22CM05804 and DP22-0214Complete
2025-01-06finaledTF-FOP-0125-00015City permit recordFire OperationalTent - 40x60Complete
2024-12-19finaledTZ-PMT-1224-00091City permit recordZoning Permit AnnualThis is a temporary use permit for the jobsite trailer.Complete
2024-11-04finaledTF-FCP-1124-00922City permit recordFire ConstructionInstall (4) wet pipe ESFR fire sprinkler systems.Complete
2024-10-08finaledTR-UTL-1024-01937City permit recordRight-of-Way (ROW) - UtilityWO T128805. TEP TO REPLACE POLE.Complete
2022-08-08finaledDP22-0214City permit recordDevelopment PackageRevision 1 - Site/Grading/Swppp - Corona Commerce Center. New industrial park.Complete
2022-07-29finaledT22CM05804City permit recordCommercial BuildingProposed construction of a 147,646 sf concrete tilt shell/speculative building and associated site wComplete

How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.

Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.

Planning work at this property?

Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this report was built

This is a reading of public records for parcel 14042025A — 33 permits on file from 2022 to 2026 (10 fire construction, 5 commercial building, 3 right-of-way (row) - utility, 3 right-of-way (row)) — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-17; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.

The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.