Electrical permit history — 2745 E Elvira Rd
2745 E Elvira Rd, Tucson — built 1979, with 90 permits on record. Review electrical, HVAC and remodel history with links to official records.
Commercial property
2745 E Elvira Rd
Built 1979 — 1970s commercial stock · HVAC 2007 (finaled)
Permanent link: Electrical permit history for 2745 E Elvira Rd (aztucsonelectricalsolutions.com/property/140420190/2745-e-elvira-rd-tucson-az-85756) · Public records last checked 2026-08-16
- Parcel
- 140420190
- Built
- 1979 (county record)
- Jurisdiction
- Tucson
- Zoning
- I-1
- Assessor use
- Warehouse W/ Office/ Retail
- Parcel size
- 9.85 acres
- Building area
- 111,752 sq ft (assessor record)
- Sewer
- Connection on file (2007, 2014, 2025) (county sewer connection records)
- Flood zone
- X — minimal flood hazard (FEMA)
- Historic preservation
- Not on file (City of Tucson HP layers)
See the property
Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.
Is it time to upgrade?
- Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2025 fire construction permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
- Heating, cooling & mechanicalLikely dueLast permitted 2007 (19 years ago). City inspection record: MECHANICAL - FINAL approved 2007-07-17. Contractor of record: CHALK ENTERPRISES *C. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Equipment from before about 2010 generally runs R-22, which has not been produced since 2020 — repairs mean reclaimed refrigerant at a price that often exceeds replacing the unit. T07ME00304 — REPLACE: PACKAGE UNIT (APA)
- Fire alarm & life safetyCurrentLast permitted 2025 (1 year ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. TF-FCP-0425-00324 — Installation of a new fire alarm system
- RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.
A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.
What that usually means electrically
- Era-based check — high priority
Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.
- Era-based check
NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.
- Worth confirming
Industrial and warehouse space usually means three-phase motor loads. High-bay LED retrofits and added VFDs both change the load picture.
- Worth confirming
A pool or spa was permitted in 2024. Pool equipment brings its own bonding grid, GFCI requirements, and usually a subpanel — and the bonding rules have tightened since, so older installations are worth verifying.
Recorded sales (1)
| Date | Price | Type |
|---|---|---|
| 2005-12-30 | $5,636,000 | Warranty Deed |
Recorded sales are the sales the Pima County Assessor has on file from affidavits of property value — not every transfer, not listings, and not a valuation. Parties are never shown here. A sale with no permitted electrical work since is worth knowing before the next sale or a remodel.
Most recent permit on record for this parcel: 2026-06-23 (TC-COM-0626-00946) — CERTIFICATE OF OCCUPANCY ONLY. SPACE TO BE USED AS IS FOR F-2, B USE. ONE EXIT SIGN TO BE REMOVED AT THE NORTHWEST EXIT. SEE LIFE SAFETY PLAN FOR EGRESS AND EXITING. NO EXPANSION OF SF..
Permit history (90)
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2026-06-23 | TC-COM-0626-00946City permit record | Pool / spaCERTIFICATE OF OCCUPANCY ONLY. SPACE TO BE USED AS IS FOR F-2, B USE. ONE EXIT SIGN TO BE REMOVED AT THE NORTHWEST EXIT. SEE LIFE SAFETY PLAN FOR EGRESS AND EXITING. NO EXPANSION OF SF. | In review | |
| 2026-06-04 | TD-DIV-0626-00037Subdivision | Subdivision/PlatsDivision of an existing developed industrial parcel into 4 unique parcels. | In Review | |
| 2025-04-22finaled | TF-FCP-0425-00324City permit record | Fire ConstructionInstallation of a new fire alarm system | Complete | |
| 2025-04-22finaled | TF-FCP-0425-00325City permit record | Fire ConstructionInstallation of a new fire alarm system | Complete | |
| 2025-04-22finaled | TF-FCP-0425-00326City permit record | Fire ConstructionInstallation of a new fire alarm system | Complete | |
| 2025-04-22finaled | TF-FCP-0425-00327City permit record | Fire ConstructionInstallation of a new fire alarm system | Complete | |
| 2025-03-31finaled | TF-FCP-0325-00263City permit record | Fire Constructionfire sprinkler TI | Complete | |
| 2025-03-31finaled | TF-FCP-0325-00264City permit record | Fire Constructionfire sprinkler TI | Complete |
82 older records are not shown here. — each links to its official file.
How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.
Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.
This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.
Planning work at this property?
Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
Send: the permanent link and the summary above, once. Watch: one email when a new permit, inspection result or code case appears on this parcel — nothing else, and you can stop any time. No list either way.
How this report was built
This is a reading of public records for parcel 140420190 — 90 permits on file from 1997 to 2026 (21 sign, 14 combo, 11 spklr, 8 fire construction) — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.
The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).
Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.