Electrical permit history — 7085 S Plumer Av

7085 S Plumer Av, Tucson — built 1951, with 92 permits on record. Review electrical, HVAC and remodel history with links to official records.

Electrical Property Screening Report · Commercial property

7085 S Plumer Av

A screening report for electrical planning, assembled from public-record indicators. It is not an official record and every figure in it should be verified against the issuing agency before it is relied on.

Verify parcel data at official source ↗

Built 1951 — 1950s commercial stock · last permitted panel/service work 2005 (finaled); a newer 2023 permit is issued · HVAC 2012 (finaled)

Is it time to upgrade?

  • Electrical service & distributionFinaled permit foundA newer 2023 permit for the same system is recorded as “Issued” — The work was permitted, but final completion is not confirmed. The permit description states “Like for Like Repair/Replacement of a damaged 240/120 volt 100 amp service”. Last permitted 2005 (21 years ago). Worth reading the permit itself: it names the service but does not read as an increase in capacity, so this may have been a like-for-like replacement rather than an upgrade. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service. T05EL01867 — REPLACE ELECTRIC SERVICE 200 AMP
  • Heating, cooling & mechanicalGetting onLast permitted 2012 (14 years ago). Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. T12CM02617 — HVAC UPGRADE
  • Fire alarm & life safetyFinaled permit foundA newer 2021 permit for the same system is recorded as “Expired” — The permit expired without a confirmed final status. The permit description states “Fire Alarm & Detection Systems - Star Link - Fire Cell Radio - Metal Can with PS - for Sole Path of Communication Remove Analog Phone Lines - Radio will not be powered by panel - separate power supply; Fire Alarm Systems - Monitor Only”. Last permitted 2020 (6 years ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. T20FC00549 — Install a voice evacuation system on the first floor and the basement for the new tenant
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitized. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Era-based check

    A finaled 2005 panel/service permit is on record for this parcel, which makes it unlikely the original 60–100 A equipment is still in place. That is a permit record, not an inspection — verify the installed rating and the panel brand on site before sizing anything new. The permit record does not confirm this; an on-site inspection is required.

  • Era-based check — high priority

    Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.

  • Era-based check

    NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.

  • Worth confirming

    There is an electrical reconnect permit from 2010. The service was disconnected at some point and brought back — usually after a vacancy, a utility disconnect, or work that required the power off. Worth knowing what prompted it.

  • Routine

    A trade permit was pulled in 2018. Trade permits cover electrical, plumbing, and mechanical work individually, so some permitted trade work has been done here since.

Solar and energy potential

Roof footprint
≈ 384,035 sq ft (county building-footprint layer, 37 structures; 2 neighbouring structures crossing the lot line excluded)
Usable for solar, planning estimate
≈ 268,800 sq ft (~70% after setbacks, rooftop equipment and access paths)
Array that could fit
on the order of 2,960 kW — roughly 7,400 panels (low-tilt ballasted rows, 400 W class modules)
Estimated annual production
≈ 4,870,000 kWh (PVWatts, Tucson sun, low-tilt south)
Energy-charge offset at TEP commercial rates
$390,000–$633,000 a year (8–13¢/kWh energy + power-supply charges, by season and rate class)

Planning-level arithmetic on the roof area above — not a shading study, a structural review or a design. The offset assumes the building uses the power as it is generated; TEP pays far less (its export rate is about 5¢/kWh) for surplus sent to the grid, so the load profile decides the real value. The 30% federal credit (§48E) still applies to commercial systems placed in service by the end of 2027 — projects that began construction by July 4, 2026 have longer; confirm timing with a tax adviser.

TEP grid capacityThis parcel is not inside any of the 11 areas TEP has mapped as saturated with distributed generation (the nearest, “I-10 and Valencia Rd”, is about 1.9 miles away — TEP’s map set, July 2020). New generation still goes through TEP’s interconnection screens, and a heavy new load still merits a utility capacity check — the maps only mark where that review is most likely to bite.

Get a commercial solar & switchgear analysis

See the property

Satellite imagery © Google. Imagery can predate recent work and shows nothing about what is inside — context, not evidence.

Flood and drainage

The federal flood map and the local one are not the same map, and they do not always agree. FEMA’s is the insurance map; the City of Tucson regulates against its own, and that is the one a permit here is judged against.

The record behind this read

Parcel
140420120
Year constructed
1951 (assessor record)
Permitting authority
Tucson
Zoning
MU
Property type
Municipal Commercial Property
Building area
553,667 sq ft
Service on record
City records show the 2005 permit was finalized; the permit description states “REPLACE ELECTRIC SERVICE 200 AMP ”.

The building area above comes from the Pima County Assessor’s record, as we read it on 28 Jan 2026. Each other row names its own source.

The most recent permitted work on this parcel was in 2026. That says the parcel was worked on under permit, not what the work covered — a roof, a pool or a changeout tells you nothing about the electrical service. Work done without a permit leaves no trace here at all.

What this means for work here

Informational public-record summary — not engineering, inspection, valuation or purchasing advice, and not the official record.

The most recent permitted work on this parcel was in 2026. That says the parcel was worked on under permit, not what the work covered — a roof, a pool or a changeout tells you nothing about the electrical service. Work done without a permit leaves no trace here at all.

What that reading rests on. The issuing offices hold 92 building permits for this parcel dated between 1997 and 2026. By category the work is addition / alteration (22), trade permit (19), fire automatic extinguishing system (11) and new construction (9). 56 of them carry a final inspection; the other 36 were issued, expired or are still open, which is not the same as work completed. There is 1 code-enforcement case recorded against the parcel, all of them closed. We do not reproduce complaint text — it routinely names people with no connection to the property.

Go straight to the records

Each link opens the issuing office’s own file for that record — dates, scope, status and inspections are theirs to publish, and they are all on the other side of these links.

Read the records yourself. We republish selected facts and record numbers so you can find the file; the issuing agency’s record controls. The files are held by City of Tucson permit record (PRO) ↗ — search the parcel number 140420120. Permit and parcel information courtesy of the City of Tucson and Pima County; their files are the official record and control over anything summarized here.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.

Utility and upgrade pathElectric service here is Tucson Electric Power (TEP). A service or panel upgrade needs a TEP meter release and has to meet TEP’s service requirements — meter height and location, clearances, and the point of attachment. See TEP new-service requirements and the TEP standards notes.

In the public record: All institutional and public property · Commercial property in 85756 · Commercial & industrial reports · Homes in 85756 · Permit data by neighborhood

Planning work at this property?

Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

What the flood note is not. The FEMA map linked above is the National Flood Hazard Layer — the federal insurance map. Local floodplain mapping is not reproduced here; use the authority’s own map, linked above. Nothing here is a floodplain determination, an elevation certificate, or a substitute for one. A parcel can straddle a boundary, and a Letter of Map Amendment can remove a structure the map still covers. For a determination, ask the floodplain administrator for the jurisdiction named above; for a design that has to satisfy one, that is work we do.

How this property compares nearby

Properties on S PLUMER AV hold 102 City permits on record, 25 of them since 2022.

Computed from the same public records as this report — counts and years, not an appraisal.

Complete permit record (93 entries)

Every permit and case we hold for this parcel, newest first. Each number links to the official file.

YearNumberTypeStatus
2026TD-DEV-0426-00091Development PackageIssued
2026TC-COM-0226-00271Commercial Solar PermitIssued
2026TC-COM-0226-00270Commercial Solar PermitIssued
2025TP-ENT-0725-00014RezoningNeeds Resubmittal
2025TC-COM-0725-01353Commercial Solar PermitExpired
2025TC-COM-0725-01352Commercial Solar PermitExpired
2025TD-DEV-1224-00341Development PackageInspections
2025TC-COM-1124-02121Commercial Addition/Alteration PermitInspections
2025TD-DEV-1224-00339Development PackageInspections
2025recordRight-of-Way (ROW) Permit - GeneralComplete
2025TC-COM-0125-00066Commercial Addition/Alteration PermitExpired
2024TC-COM-1124-02124Commercial New Building PermitWithdrawn
2024recordRight-of-Way (ROW) Permit - Utility EmergencyComplete
2024recordRight-of-Way (ROW) Permit - UtilityVoid
2023TC-COM-0923-02204Commercial Trade PermitIssued
2022TP-PRE-1222-00062Pre-Application ConferenceComplete
2022T22CM01063Commercial Trade PermitExpired
2022T21CM09677Commercial Trade PermitExpired
2022T22DV00019REFUSENOVERIFY
2021T21BU00231Commercial DemolitionCanceled
2021T21FC00090Other IFC Construction PermitComplete
2021T21FC00040Fire Alarm System PermitExpired
2020T20CM04050Commercial New Building PermitComplete
2020DP20-0104Development PackageComplete
2020T20FC00549Fire Alarm System PermitComplete
2020T20FC00579Other IFC Construction PermitComplete
2020T20FC00386Fire Automatic Extinguishing System PermitComplete
2020T20CM02416Commercial Addition/Alteration PermitExpired
2020T18CM09984Commercial Addition/Alteration PermitComplete
2019T19FC00838Fire Automatic Extinguishing System PermitComplete
2019T19FC00651Fire Automatic Extinguishing System PermitComplete
2019T19CM04331Commercial Solar PermitExpired
2019DP19-0149Development PackageExpired
2019T18CM09121Commercial New Building PermitComplete
2019T19OT00042Floodplain Use PermitCanceled
2019DP16-0205Development PackageComplete
2018T18CM05337Commercial Trade PermitComplete
2017T17BU00495Commercial DemolitionComplete
2017T17CM04765Commercial Addition/Alteration PermitComplete
2017T17FC00046Fire Automatic Extinguishing System PermitComplete
2017T16CM09239Commercial Addition/Alteration PermitComplete
2016CWH-16-0205Commercial Water Harvesting OrdinanceActive
2016T16CM04891Residential Solar PermitWithdrawn
2016T16CM02951Commercial Addition/Alteration PermitComplete
2016T15CM08230Commercial Addition/Alteration PermitComplete
2015T15BU01247Storage Tank PermitComplete
2012T12CM02617Commercial Trade PermitComplete
2011T11BU00718Storage Tank PermitCanceled
2011T11CM00371Commercial Addition/Alteration PermitWithdrawn
2010T10CM03522Commercial Addition/Alteration PermitComplete
2010T10EL02010Commercial Trade PermitComplete
2009T09BU01350Fire Automatic Extinguishing System PermitComplete
2008T08EL01639Commercial Trade PermitWithdrawn
2008T08BU00740GradingCanceled
2007T07CM03978Commercial Addition/Alteration PermitComplete
2007T07CM00856Commercial Addition/Alteration PermitComplete
2006T06BU00156Commercial New Building PermitWithdrawn
2005T05CM06094Commercial Addition/Alteration PermitWithdrawn
2005T05EL01867Commercial Trade PermitComplete
2005T05CM02015Commercial Addition/Alteration PermitComplete
2005T05CM02652Commercial New Building PermitComplete
2005T04EL02341Commercial Trade PermitComplete
2004T04CM05406Commercial Addition/Alteration PermitComplete
2004T04CM03031Commercial Addition/Alteration PermitComplete
2003T03CM04682Commercial Addition/Alteration PermitComplete
2003T03EL00305Commercial Trade PermitComplete
2002T02BU02303Commercial Addition/Alteration PermitComplete
2002T02BU02354Fire Automatic Extinguishing System PermitComplete
2002T02BU02286Storage Tank PermitComplete
2002T02BU02212Fire Automatic Extinguishing System PermitComplete
2001T01EL01733Commercial Trade PermitComplete
2001T01BU02093Storage Tank PermitCanceled
2001T00CM05170Commercial New Building PermitComplete
2001T01BU00710Fire Automatic Extinguishing System PermitComplete
2001T01EL00390Commercial Trade PermitCanceled
2001T01BU00137Fire Automatic Extinguishing System PermitCanceled
2001T00CM03703Commercial Addition/Alteration PermitComplete
2000T00ME00865Commercial Trade PermitComplete
2000T00BU01411Commercial Addition/Alteration PermitCanceled
2000T99CM04465Commercial New Building PermitComplete
2000T00ME00061Commercial Trade PermitCanceled
1999T99CM03874Commercial Addition/Alteration PermitComplete
1998T98BU02615Storage Tank PermitCanceled
1998T98EL01240Commercial Trade PermitComplete
1998T98EL00834Commercial Trade PermitComplete
1998T97CM04118Commercial Addition/Alteration PermitComplete
1998T97CM02234Commercial Trade PermitCanceled
1998T97CM03865Commercial New Building PermitComplete
1997T97EL01871Commercial Trade PermitComplete
1997T97BU02281Fire Automatic Extinguishing System PermitComplete
1997T97CM02738Commercial New Building PermitComplete
1997T97EL00231Commercial Trade PermitComplete
1997T97BU00014Fire Automatic Extinguishing System PermitComplete

prints this report — permits, comparisons and sources — as a clean document

How this report was built

This is a reading of public records for parcel 140420120 — 92 City permits on file from 1997 to 2026 and 1 code enforcement case — assembled from the Pima County parcel file and the City of Tucson’s published permit layers together with the City’s own migrated permit archive, whose records reach back to the mid-1990s. Some records were still not read for this snapshot: City permit records before the mid-1990s were never fully digitized. The construction year, living area on this page come from our saved copy of the Assessor’s own published data file (dated 2026-01-28). The sewer connection file and the flood map were not read for this snapshot. Absence of a permit here is NOT evidence work was never permitted — it may predate the digitized record or sit in a system this snapshot did not read. Public records snapshot taken 2026-08-22.

The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.