Electrical permit history — 6850 S Brosius Av

6850 S Brosius Av, Tucson — built 2019, with 35 permits on record. Review electrical, HVAC and remodel history with links to official records.

Electrical Property Screening Report · Commercial property

6850 S Brosius Av

A screening report for electrical planning, assembled from public-record indicators. It is not an official record and every figure in it should be verified against the issuing agency before it is relied on.

Verify parcel data at official source ↗

Built 2019 — 2010s commercial stock · 35 permits on record; no permitted panel/service or HVAC work among them

Is it time to upgrade?

  • Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2022 trade permit permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. No permitted service work shows in the record we read — unremarkable for a building of this age, whose service was sized to modern code at construction. The live question is spare capacity for new loads (EV charging, kitchen or process equipment), not the age of the gear. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
  • Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2022 trade permit permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
  • Fire alarm & life safetyFinaled permit foundA newer 2022 permit for the same system is recorded as “Expired” — The permit expired without a confirmed final status. The permit description states “Fire Alarm & Detection Systems - TIE-IN NEW DEVICES INTO AN EXISTING ALARM SYSTEM.; Fire Alarm Systems - New Sq Ft: 55478; Fire Alarm Systems - # New Stories: 1”. Last permitted 2022 (4 years ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. T22FC00240 — NFP to modify the existing fire sprinkler system.
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitized. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Worth confirming

    Industrial and warehouse space usually means three-phase motor loads. High-bay LED retrofits and added VFDs both change the load picture.

  • Routine

    A trade permit was pulled in 2022. Trade permits cover electrical, plumbing, and mechanical work individually, so some permitted trade work has been done here since.

Solar and energy potential

Roof footprint
≈ 157,500 sq ft (assessor’s building area ÷ recorded stories — approximate)
Usable for solar, planning estimate
≈ 110,300 sq ft (~70% after setbacks, rooftop equipment and access paths)
Array that could fit
on the order of 1,210 kW — roughly 3,030 panels (low-tilt ballasted rows, 400 W class modules)
Estimated annual production
≈ 1,990,000 kWh (PVWatts, Tucson sun, low-tilt south)
Energy-charge offset at TEP commercial rates
$159,000–$259,000 a year (8–13¢/kWh energy + power-supply charges, by season and rate class)

Planning-level arithmetic on the roof area above — not a shading study, a structural review or a design. The offset assumes the building uses the power as it is generated; TEP pays far less (its export rate is about 5¢/kWh) for surplus sent to the grid, so the load profile decides the real value. The 30% federal credit (§48E) still applies to commercial systems placed in service by the end of 2027 — projects that began construction by July 4, 2026 have longer; confirm timing with a tax adviser.

TEP grid capacityThis parcel is not inside any of the 11 areas TEP has mapped as saturated with distributed generation (the nearest, “I-10 and Valencia Rd”, is about 0.8 miles away — TEP’s map set, July 2020). New generation still goes through TEP’s interconnection screens, and a heavy new load still merits a utility capacity check — the maps only mark where that review is most likely to bite.

Get a commercial solar & switchgear analysis

See the property

Satellite imagery © Google. Imagery can predate recent work and shows nothing about what is inside — context, not evidence.

Flood and drainage

The federal flood map and the local one are not the same map, and they do not always agree. FEMA’s is the insurance map; the City of Tucson regulates against its own, and that is the one a permit here is judged against.

The record behind this read

Parcel
140418480
Year constructed
2019 (assessor record)
Permitting authority
Tucson
Zoning
I-1
Property type
Warehouse W/ Office/ Retail
Building area
157,500 sq ft

The building area above comes from the Pima County Assessor’s record, as we read it on 28 Jan 2026. Each other row names its own source.

The most recent permitted work on this parcel was in 2025. That says the parcel was worked on under permit, not what the work covered — a roof, a pool or a changeout tells you nothing about the electrical service. Work done without a permit leaves no trace here at all.

What this means for work here

Informational public-record summary — not engineering, inspection, valuation or purchasing advice, and not the official record.

The most recent permitted work on this parcel was in 2025. That says the parcel was worked on under permit, not what the work covered — a roof, a pool or a changeout tells you nothing about the electrical service. Work done without a permit leaves no trace here at all.

What that reading rests on. The issuing offices hold 35 building permits for this parcel dated between 2008 and 2025. By category the work is fire automatic extinguishing system (10), addition / alteration (9), fire alarm system (5) and trade permit (4). 26 of them carry a final inspection; the other 9 were issued, expired or are still open, which is not the same as work completed.

Go straight to the records

Each link opens the issuing office’s own file for that record — dates, scope, status and inspections are theirs to publish, and they are all on the other side of these links.

Read the records yourself. We republish selected facts and record numbers so you can find the file; the issuing agency’s record controls. The files are held by City of Tucson permit record (PRO) ↗ — search the parcel number 140418480. Permit and parcel information courtesy of the City of Tucson and Pima County; their files are the official record and control over anything summarized here.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.

Utility and upgrade pathElectric service here is Tucson Electric Power (TEP). A service or panel upgrade needs a TEP meter release and has to meet TEP’s service requirements — meter height and location, clearances, and the point of attachment. See TEP new-service requirements and the TEP standards notes.

In the public record: All industrial property · Commercial property in 85756 · Commercial & industrial reports · Homes in 85756 · Permit data by neighborhood

Planning work at this property?

Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

What the flood note is not. The flood zone shown is FEMA’s National Flood Hazard Layer — the federal insurance map. Local floodplain mapping is not reproduced here; use the authority’s own map, linked above. Nothing here is a floodplain determination, an elevation certificate, or a substitute for one. A parcel can straddle a boundary, and a Letter of Map Amendment can remove a structure the map still covers. For a determination, ask the floodplain administrator for the jurisdiction named above; for a design that has to satisfy one, that is work we do.

How this property compares nearby

Properties on S BROSIUS AV hold 37 City permits on record, 7 of them since 2022.

Computed from the same public records as this report — counts and years, not an appraisal.

Complete permit record (35 entries)

Every permit and case we hold for this parcel, newest first. Each number links to the official file.

YearNumberTypeStatus
2025TC-COM-0824-01693Commercial Addition/Alteration PermitIssued
2023T22OT00666Permanent Sign PermitComplete
2022T22FC00463Fire Alarm System PermitExpired
2022T22CM03592Commercial Trade PermitComplete
2022T22FC00240Fire Automatic Extinguishing System PermitComplete
2021T21CM08166Commercial Addition/Alteration PermitComplete
2021T21SA00394Zoning ComplianceComplete
2021T21CM04515Commercial Addition/Alteration PermitComplete
2021T21FC00112Fire Automatic Extinguishing System PermitComplete
2020T20CM07072Commercial Addition/Alteration PermitComplete
2020T20FC00726Fire Alarm System PermitComplete
2019T19FC01054Fire Automatic Extinguishing System PermitComplete
2019T19FC01055Fire Automatic Extinguishing System PermitComplete
2019T19FC01056Fire Automatic Extinguishing System PermitComplete
2019T19FC01057Fire Automatic Extinguishing System PermitComplete
2019T19FC01003Fire Alarm System PermitComplete
2019T19FC00995Fire Alarm System PermitComplete
2019T19CM06081Commercial Addition/Alteration PermitComplete
2019T19CM06082Commercial Addition/Alteration PermitComplete
2019T19CM06083Commercial Addition/Alteration PermitComplete
2019T19CM06084Commercial Addition/Alteration PermitComplete
2019T19OT00865Permanent Sign PermitExpired
2019T19FC00492Fire Automatic Extinguishing System PermitComplete
2019recordRight-of-Way (ROW) Permit - GeneralComplete
2019T19FC00146Fire Automatic Extinguishing System PermitComplete
2019T19FC00066Fire Alarm System PermitComplete
2018T18CM09257Commercial Addition/Alteration PermitCanceled
2018T18CM05426Commercial New Building PermitCanceled
2018DP18-0156Development PackageComplete
2009T09BU00432Fire Automatic Extinguishing System PermitCanceled
2009T08PL00980Commercial Trade PermitComplete
2009T08PL00981Commercial Trade PermitCanceled
2008T08BU02167Fire Automatic Extinguishing System PermitComplete
2008T08BU00855GradingCanceled
2008T08CM00528Commercial Trade PermitCanceled

prints this report — permits, comparisons and sources — as a clean document

How this report was built

This is a reading of public records for parcel 140418480 — 35 City permits on file from 2008 to 2025 — assembled from the Pima County parcel file and the City of Tucson’s published permit layers together with the City’s own migrated permit archive, whose records reach back to the mid-1990s. Some records were still not read for this snapshot: City permit records before the mid-1990s were never fully digitized. The construction year, living area on this page come from our saved copy of the Assessor’s own published data file (dated 2026-01-28). The sewer connection file and the flood map were not read for this snapshot. Absence of a permit here is NOT evidence work was never permitted — it may predate the digitized record or sit in a system this snapshot did not read. Public records snapshot taken 2026-08-22.

The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.