Electrical permit history — 3350 E Valencia Rd
3350 E Valencia Rd, Tucson — built 1991, with 36 permits on record. Review electrical, HVAC and remodel history with links to official records.
Electrical Property Screening Report · Commercial property
3350 E Valencia Rd
A screening report for electrical planning, assembled from public-record indicators. It is not an official record and every figure in it should be verified against the issuing agency before it is relied on.
Verify parcel data at official source ↗
Built 1991 — 1990s commercial stock · HVAC 2024 (permitted, completion not confirmed)
Permanent link: Electrical permit history for 3350 E Valencia Rd (aztucsonelectricalsolutions.com/property/14041009a/3350-e-valencia-rd-tucson-az-85706) · Public records last checked 2026-09-22
Is it time to upgrade?
- Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2026 general operational fire permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. No permitted service or distribution work shows in the record we read. Gear of this era is generally still supported, but spare capacity drifts with every tenant improvement — worth a load check against the panel schedule before adding major equipment. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
- Heating, cooling & mechanicalPermitted — completion not confirmedA 2024 permit specifies this work (the permit description states “Replace existing water cooled chillers with new air cooled chillers”), but the available record does not show a final inspection. The work was permitted, but final completion is not confirmed. Official status: Issued. TC-COM-0124-00028 — Replace existing water cooled chillers with new air cooled chillers
- Fire alarm & life safetyFinaled permit foundA newer 2026 permit for the same system is recorded as “Issued” — The work was permitted, but final completion is not confirmed. The permit description states “Install new wet-pipe fire sprinkler system.”. Last permitted 2017 (9 years ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. T17FC00062 — Installation of 2 Clean Agent Fire Suppression Systems (Ansul Novec 1230/Sapphire) System 1 - Rms S3/S4 Eelectrical Rooms System 2 - N11/N12 Electrical/Communications
- RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.
A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitized. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.
What that usually means electrically
- Era-based check
Gear in this age range is usually still supported but is due for infrared scanning and torque verification if that has not been done recently. The permit record does not confirm this; an on-site inspection is required.
- Era-based check
NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.
- Worth confirming
Industrial and warehouse space usually means three-phase motor loads. High-bay LED retrofits and added VFDs both change the load picture.
- Worth confirming
A pool or spa was permitted in 2025. Pool equipment brings its own bonding grid, GFCI requirements, and usually a subpanel — and the bonding rules have tightened since, so older installations are worth verifying.
- Routine
A trade permit was pulled in 2014. Trade permits cover electrical, plumbing, and mechanical work individually, so some permitted trade work has been done here since.
Solar and energy potential
- Roof footprint
- ≈ 94,101 sq ft (county building-footprint layer, 2 structures)
- Usable for solar, planning estimate
- ≈ 65,900 sq ft (~70% after setbacks, rooftop equipment and access paths)
- Array that could fit
- on the order of 720 kW — roughly 1,800 panels (low-tilt ballasted rows, 400 W class modules)
- Estimated annual production
- ≈ 1,180,000 kWh (PVWatts, Tucson sun, low-tilt south)
- Energy-charge offset at TEP commercial rates
- $94,000–$153,000 a year (8–13¢/kWh energy + power-supply charges, by season and rate class)
Planning-level arithmetic on the roof area above — not a shading study, a structural review or a design. The offset assumes the building uses the power as it is generated; TEP pays far less (its export rate is about 5¢/kWh) for surplus sent to the grid, so the load profile decides the real value. The 30% federal credit (§48E) still applies to commercial systems placed in service by the end of 2027 — projects that began construction by July 4, 2026 have longer; confirm timing with a tax adviser.
TEP grid capacityThis parcel is not inside any of the 11 areas TEP has mapped as saturated with distributed generation (the nearest, “I-10 and Valencia Rd”, is about 0.7 miles away — TEP’s map set, July 2020). New generation still goes through TEP’s interconnection screens, and a heavy new load still merits a utility capacity check — the maps only mark where that review is most likely to bite.
Get a commercial solar & switchgear analysis
See the property
Satellite imagery © Google. Imagery can predate recent work and shows nothing about what is inside — context, not evidence.
Flood and drainage
The federal flood map and the local one are not the same map, and they do not always agree. FEMA’s is the insurance map; the City of Tucson regulates against its own, and that is the one a permit here is judged against.
- FEMA: we did not read the federal flood map for this snapshot, so no zone is shown here. That is a gap in this page, not a statement about the property. Check FEMA’s flood map for this address ↗
- Local floodplain (the City of Tucson): local floodplain mapping is not reproduced here. A property can sit outside FEMA’s zone and still be inside a locally regulated floodplain, floodway, sheet-flooding area or erosion hazard setback, so check the authority’s own map before planning work. Pima County RFCD flood hazard map for parcel 14041009A ↗ · the City of Tucson ↗
The record behind this read
- Parcel
- 14041009A
- Year constructed
- 1991 (assessor record)
- Permitting authority
- Tucson
- Zoning
- I-1
- Property type
- Office Building/Industrial Park One Story
- Building area
- 82,024 sq ft
The building area above comes from the Pima County Assessor’s record, as we read it on 28 Jan 2026. Each other row names its own source.
The most recent permitted work on this parcel was in 2026. That says the parcel was worked on under permit, not what the work covered — a roof, a pool or a changeout tells you nothing about the electrical service. Work done without a permit leaves no trace here at all.
What this means for work here
Informational public-record summary — not engineering, inspection, valuation or purchasing advice, and not the official record.
The most recent permitted work on this parcel was in 2026. That says the parcel was worked on under permit, not what the work covered — a roof, a pool or a changeout tells you nothing about the electrical service. Work done without a permit leaves no trace here at all.
What that reading rests on. The issuing offices hold 36 building permits for this parcel dated between 1998 and 2026. By category the work is addition / alteration (6), fire automatic extinguishing system (5), right-of-way (row) permit - utility (4) and development package (4). 16 of them carry a final inspection; the other 20 were issued, expired or are still open, which is not the same as work completed.
Go straight to the records
Each link opens the issuing office’s own file for that record — dates, scope, status and inspections are theirs to publish, and they are all on the other side of these links.
City permit record (26): 2026 TF-FOP-0426-00572 · 2026 TF-FOP-0326-00391 · 2026 TF-FCP-0925-00759 · 2025 TC-FBB-0125-00007 · 2025 TF-FCP-0525-00401 · 2023 TD-DEV-0223-00151 · 2022 T22PRE0228 · 2018 T18OT00576 · 2017 T17FC00062 · 2017 T16FC00348 · 2015 T15OT01692 · 2014 T14OT01566 · 2014 T14CM06559 · 2014 DP14-0180 · 2013 DP13-0036 · 2013 T13BU00795 · 2013 T13BU00663 · 2013 T13BU00634 · 2013 T13CM00975 · 2013 T13BU00059 · 2012 T12CM07369 · 2012 T12SA00319 · 2005 T05BA00579 · 2005 T05BA00515 · 1998 T98BU00483 · 1998 T98CM00138
Commercial building (5): 2026 TC-COM-0525-01062 · 2025 TC-COM-0725-01386 · 2025 TC-COM-0725-01387 · 2025 TC-COM-1124-02168 · 2024 TC-COM-0124-00028
Development package (1): 2025 TD-DEV-0924-00253
Read the records yourself. We republish selected facts and record numbers so you can find the file; the issuing agency’s record controls. The files are held by City of Tucson permit record (PRO) ↗ — search the parcel number 14041009A. Permit and parcel information courtesy of the City of Tucson and Pima County; their files are the official record and control over anything summarized here.
This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.
Utility and upgrade pathElectric service here is Tucson Electric Power (TEP). A service or panel upgrade needs a TEP meter release and has to meet TEP’s service requirements — meter height and location, clearances, and the point of attachment. See TEP new-service requirements and the TEP standards notes.
In the public record: All commercial property · Commercial property in 85706 · Commercial & industrial reports · Homes in 85706 · Permit data by neighborhood
Planning work at this property?
Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
The permanent link and the summary above, sent once. No list.One email when a new permit, inspection result or code case appears on this parcel — nothing else, and you can stop any time. No list.
What the flood note is not. The FEMA map linked above is the National Flood Hazard Layer — the federal insurance map. Local floodplain mapping is not reproduced here; use the authority’s own map, linked above. Nothing here is a floodplain determination, an elevation certificate, or a substitute for one. A parcel can straddle a boundary, and a Letter of Map Amendment can remove a structure the map still covers. For a determination, ask the floodplain administrator for the jurisdiction named above; for a design that has to satisfy one, that is work we do.
How this property compares nearby
Properties on E VALENCIA RD hold 1,242 City permits on record, 422 of them since 2022.
Computed from the same public records as this report — counts and years, not an appraisal.
Complete permit record (36 entries)
Every permit and case we hold for this parcel, newest first. Each number links to the official file.
| Year | Number | Type | Status |
|---|---|---|---|
| 2026 | TF-FOP-0426-00572 | General Operational Fire Permit | Complete |
| 2026 | TF-FOP-0326-00391 | Special Events Fire Permit - Vendor | Complete |
| 2026 | TF-FCP-0925-00759 | Fire Automatic Extinguishing System Permit | Issued |
| 2026 | TC-COM-0525-01062 | Commercial Addition/Alteration Permit | Inspections |
| 2025 | TC-COM-0725-01386 | Commercial Addition/Alteration Permit | Inspections Complete |
| 2025 | record | Right-of-Way (ROW) Permit - Utility | Inspections |
| 2025 | TC-COM-0725-01387 | Commercial Addition/Alteration Permit | Approved |
| 2025 | TC-FBB-0125-00007 | Permanent Modular | Needs Resubmittal |
| 2025 | TF-FCP-0525-00401 | Fire Alarm System Permit | Expired |
| 2025 | TC-COM-1124-02168 | Commercial New Building Permit | Issued |
| 2025 | TD-DEV-0924-00253 | Development Package | Inspections |
| 2024 | record | Right-of-Way (ROW) Permit - Utility | Inspections |
| 2024 | record | Right-of-Way (ROW) Permit - Utility | Complete |
| 2024 | TC-COM-0124-00028 | Commercial Trade Permit | Issued |
| 2023 | TD-DEV-0223-00151 | Development Package | Withdrawn |
| 2023 | record | Right-of-Way (ROW) Permit - Utility | Complete |
| 2022 | T22PRE0228 | Pre-Application Conference | Complete |
| 2018 | T18OT00576 | Registered Facility Annual Permit | Expired |
| 2017 | T17FC00062 | Fire Automatic Extinguishing System Permit | Complete |
| 2017 | T16FC00348 | Fire Automatic Extinguishing System Permit | Complete |
| 2015 | T15OT01692 | Registered Facility Annual Permit | Withdrawn |
| 2014 | T14OT01566 | Registered Facility Annual Permit | Canceled |
| 2014 | T14CM06559 | Commercial Trade Permit | Complete |
| 2014 | DP14-0180 | Development Package | Canceled |
| 2013 | DP13-0036 | Development Package | Complete |
| 2013 | T13BU00795 | Commercial Trade Permit | Complete |
| 2013 | T13BU00663 | Commercial Trade Permit | Canceled |
| 2013 | T13BU00634 | Fire Automatic Extinguishing System Permit | Complete |
| 2013 | T13CM00975 | Commercial Addition/Alteration Permit | Complete |
| 2013 | T13BU00059 | Storage Tank Permit | Canceled |
| 2012 | T12CM07369 | Commercial Addition/Alteration Permit | Canceled |
| 2012 | T12SA00319 | Zoning Compliance | Complete |
| 2005 | T05BA00579 | Stormwater Basin | Approved |
| 2005 | T05BA00515 | Stormwater Basin | Approved |
| 1998 | T98BU00483 | Fire Automatic Extinguishing System Permit | Complete |
| 1998 | T98CM00138 | Commercial Addition/Alteration Permit | Complete |
prints this report — permits, comparisons and sources — as a clean document
How this report was built
This is a reading of public records for parcel 14041009A — 36 City permits on file from 1998 to 2026 — assembled from the Pima County parcel file and the City of Tucson’s published permit layers together with the City’s own migrated permit archive, whose records reach back to the mid-1990s. Some records were still not read for this snapshot: City permit records before the mid-1990s were never fully digitized. The construction year, living area on this page come from our saved copy of the Assessor’s own published data file (dated 2026-01-28). The sewer connection file and the flood map were not read for this snapshot. Absence of a permit here is NOT evidence work was never permitted — it may predate the digitized record or sit in a system this snapshot did not read. Public records snapshot taken 2026-09-22.
The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).
Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.