Electrical permit history — 4785 E Valencia Rd

4785 E Valencia Rd, Tucson — built 2024, with 12 permits on record. Review electrical, HVAC and remodel history with links to official records.

Commercial property

4785 E Valencia Rd

Built 2024 — 2020s commercial stock · 1 open code case · 12 permits on record; no permitted panel/service or HVAC work among them

Parcel
14036006A
Built
2024 (assessor record)
Jurisdiction
Tucson
Zoning
PAD-21
Assessor use
Warehouse W/ Office/ Retail
Parcel size
30.69 acres
Building area
27,700 sq ft (assessor record)
Sewer
Connection on file (2024) (county sewer connection records)
Flood zone
X — minimal flood hazard (FEMA)
Historic preservation
Not on file (City of Tucson HP layers)

See the property

County aerial photograph centered on 4785 E Valencia Rd, parcel outlined

Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.

Is it time to upgrade?

  • Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2024 fire construction permit is on file (and 1 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
  • Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2024 fire construction permit is on file (and 1 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
  • Fire alarm & life safetyCurrentLast permitted 2024 (2 years ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. TF-FCP-0424-00325 — Titan to install new dedicated function fire alarm system
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Worth looking at

    There is an open code enforcement case on this parcel. An open case can hold up a permit, and if it touches unpermitted work the electrical scope usually has to be brought up to code as part of resolving it.

  • Worth confirming

    Industrial and warehouse space usually means three-phase motor loads. High-bay LED retrofits and added VFDs both change the load picture.

Recorded sales (1)

Recorded transfers from the Pima County Assessor — 1 of 1
DatePriceType
2020-12-23$800,000Warranty Deed

Recorded sales are the sales the Pima County Assessor has on file from affidavits of property value — not every transfer, not listings, and not a valuation. Parties are never shown here. A sale with no permitted electrical work since is worth knowing before the next sale or a remodel.

Most recent permit on record for this parcel: 2024-12-23 (TR-UTL-1224-02419) — WO T135899 - REMOVE OVERHEAD SERVICE WIRE FROM TEP POLE.

Permit history (12)

Permit history for this parcel — 8 of 12 records
DateRecordWhatStatusValue
2024-12-23finaledTR-UTL-1224-02419City permit recordRight-of-Way (ROW) - UtilityWO T135899 - REMOVE OVERHEAD SERVICE WIRE FROM TEP POLEComplete
2024-12-20TC-CFO-1224-00275City permit recordCertificate of OccupancyThis project needs the okay for a Temporary Certificate of Occupancy from a Engineering Inspector and the level of (TCO) for the building. Please schedule Engineering Final and re-request TCO once the inspector has given the okay. Any questions please email building_official@tucsonaz.gov New Retail & Warehouse buildingDenied
2024-09-25TR-ROW-0924-01120City permit recordRight-of-Way (ROW)Needs resubmittal
2024-04-24finaledTF-FCP-0424-00325City permit recordFire ConstructionTitan to install new dedicated function fire alarm systemComplete
2024-03-19TF-FCP-0324-00217City permit recordFire ConstructionVOID-Submit under Permit#TF-FCP-0224-00119 - Install new wet pipe fire sprinkler system in new warehouse facility.Void
2024-02-28expired 2025-03-04TS-PRM-0224-00085City permit recordSign - PermanentManufacture and Install 1 ILLUMINATED ground signExpired
2024-02-13finaledTF-FCP-0224-00119City permit recordFire ConstructionNew 6" underground fire protection and fire sprinklers for warehouse buildingComplete
2024-01-24finaledTZ-PMT-0124-00005City permit recordZoning Permit AnnualApplying for TUP permit to meet requirements for (2) construction trailers at development address.Complete
Show 4 older records
Permit history for this parcel — remaining 4 records
DateRecordWhatStatusValue
2024-01-18expired 2025-03-04TS-PRM-0124-00025City permit recordFence / wallManufacture and Install 5 wall -ILLUMINATED wall signs (revise to remove freestanding sign from this package for later review)Issued
2023-11-08TC-FBB-1123-00006City permit recordFactory Built BuildingsInstall two (2) each construction trailers 12' x 44' for construction use during construction of permit no. T22CM03945Expired
2022-05-30finaledDP22-0147City permit recordDevelopment PackageSite/Grading/Swppp - Mueller Inc.Complete
2022-05-24finaledT22CM03945City permit recordCommercial BuildingNew Retail & Warehouse buildingComplete

How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.

Code enforcement (1)

Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.

Code enforcement history for this parcel — 1 of 1 records
DateRecordWhatStatus
2026-07-02CE-VIO0726-02789Code enforcement caseCode enforcement caseNotice of violation

Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this report was built

This is a reading of public records for parcel 14036006A — 12 permits on file from 2022 to 2024 (3 fire construction, 1 right-of-way (row) - utility, 1 certificate of occupancy, 1 right-of-way (row)) and 1 code enforcement case — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.

The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.