Electrical permit history — 3480 E Britannia Dr

3480 E Britannia Dr, Tucson — built 1984, with 124 permits on record. Review electrical, HVAC and remodel history with links to official records.

Commercial property

3480 E Britannia Dr

Built 1984 — 1980s commercial stock · 124 permits on record; no permitted panel/service or HVAC work among them

Parcel
14029003H
Built
1984 (county record)
Jurisdiction
Tucson
Zoning
I-1
Assessor use
Warehouse W/Off/Rtl Interior @ .26-.60
Parcel size
12.61 acres
Building area
160,350 sq ft (assessor record)
Sewer
Connection on file (2009, 2011, 2017) (county sewer connection records)
Flood zone
X — minimal flood hazard (FEMA)
Historic preservation
Not on file (City of Tucson HP layers)

See the property

County aerial photograph centered on 3480 E Britannia Dr, parcel outlined

Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.

Is it time to upgrade?

  • Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2026 fire construction permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
  • Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2026 fire construction permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
  • Fire alarm & life safetyCurrentA newer 2026 permit for the same system is recorded as “Issued” — The work was permitted, but final completion is not confirmed. The permit description states “Resubmittal to renew existing permit. Original plans were an expansion on the existing NAC circuit.”. Last permitted this year (2026). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. TF-FCP-0326-00204 — EXPEDITE - Add and relocate sprinkler drops for new tenant layout.
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Era-based check — high priority

    Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.

  • Era-based check

    NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.

  • Worth confirming

    Industrial and warehouse space usually means three-phase motor loads. High-bay LED retrofits and added VFDs both change the load picture.

  • Worth confirming

    A pool or spa was permitted in 2025. Pool equipment brings its own bonding grid, GFCI requirements, and usually a subpanel — and the bonding rules have tightened since, so older installations are worth verifying.

Recorded sales (1)

Recorded transfers from the Pima County Assessor — 1 of 1
DatePriceType
2004-10-20$15,500,000Special Warranty Deed

Recorded sales are the sales the Pima County Assessor has on file from affidavits of property value — not every transfer, not listings, and not a valuation. Parties are never shown here. A sale with no permitted electrical work since is worth knowing before the next sale or a remodel.

Most recent permit on record for this parcel: 2026-05-19 (TF-FCP-0526-00334) — Resubmittal to renew existing permit. Original plans were an expansion on the existing NAC circuit..

Permit history (124)

Permit history for this parcel — 8 of 124 records
DateRecordWhatStatusValue
2026-05-19expires 2026-12-15TF-FCP-0526-00334City permit recordFire ConstructionResubmittal to renew existing permit. Original plans were an expansion on the existing NAC circuit.Issued
2026-04-15TS-PRM-0426-00135City permit recordFence / wall(2) New non-illuminated wall signsNeeds resubmittal
2026-04-06expired 2026-05-09TC-CFO-0426-00064City permit recordPool / spaInterior Renovation of existing space for new office and assembly space. No exterior work or changes to exterior. Requesting a level 1 TCOIssued
2026-03-25finaledTF-FCP-0326-00204City permit recordFire ConstructionEXPEDITE - Add and relocate sprinkler drops for new tenant layout.Complete
2026-03-25finaledTR-ROW-0326-00347City permit recordFence / wallRef-David Marhefka- Beautification project on the NW corner of S Palo Verde and E Valencia to plant 7 trees and 21 shrubs in the triangle near the gabion wall just built. We'll use cones and vests, but barricades for the street not needed. Permit free per request by David MarhefkaComplete
2025-09-10finaledTR-ROW-0925-01112City permit recordFence / wallConstruction of a new gabion wall, constructed to the exact dimensions and construction materials as the wall located at the NWC of Valencia and S. Nogales Hwy. The project will also include the installation of an irrigation system, including a new 5/8" irrigation water service, backflow preventer in a Guard Shack steel cage with a frost blanket, boxes, all connections and pipe, two battery powered remote control valves and associated boxes and connections, and any required sleeving.Complete
2025-07-18TC-CFO-0725-00103City permit recordPool / spaThis project needs the okay for a Temporary Certificate of Occupancy (TCO) from a Building Inspector, Fire Inspector, and Engineering Inspector and the TCO level for the building. Please schedule Fire, Engineering Finals and HCBU-TCO inspection. Once okay is given by all inspectors re-request TCO. Interior Renovation of existing space for new office and assembly space. No exterior work or changes to exterior.Denied
2025-04-09finaledTF-FCP-0425-00300City permit recordFire ConstructionAdd new pendents and uprights for new offices, paint booth and mezzanine.Complete

116 older records are not shown here. — each links to its official file.

How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.

Code enforcement (2)

Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.

Code enforcement history for this parcel — 2 of 2 records
DateRecordWhatStatus
2013-05-09T13DV03213Code enforcement caseCode enforcement caseNoverify
2008-11-07T08DV10489Code enforcement caseWork without permitComplian

Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.

Planning work at this property?

Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this report was built

This is a reading of public records for parcel 14029003H — 124 permits on file from 1997 to 2026 (35 combo, 32 spklr, 9 sign, 7 firecons) and 2 code enforcement cases — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.

The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.