Electrical permit history — 2054 E Ginter Rd

2054 E Ginter Rd, Tucson — built 1959, with 12 permits on record. Review electrical, HVAC and remodel history with links to official records.

Commercial property

2054 E Ginter Rd

Built 1959 — 1950s commercial stock · 12 permits on record; no permitted panel/service or HVAC work among them

Parcel
140280260
Built
1959 (county record)
Jurisdiction
Tucson
Zoning
R-2
Assessor use
State School Prop
Parcel size
4.14 acres
Building area
68,272 sq ft (assessor record)
Sewer
No connection on file (sewer or septic status not confirmed by the record — verify on site)
Flood zone
X — minimal flood hazard (FEMA)
Historic preservation
Not on file (City of Tucson HP layers)

See the property

County aerial photograph centered on 2054 E Ginter Rd, parcel outlined

Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.

Is it time to upgrade?

  • Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2026 solar pv permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
  • Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2026 solar pv permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
  • Fire alarm & life safetyLikely dueLast permitted 2003 (23 years ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. T03BU00375 — FIRE SPKR:ADD 24 & INSTALL 8LF OF 4" PIPE
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Era-based check — high priority

    Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.

  • Era-based check

    NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.

  • Worth confirming

    Solar was permitted here in 2026. That means there is an existing interconnection, and the main breaker and busbar rating already carry a PV backfeed — so anything else you add (an EV charger, a heat pump) has to be checked against what is left under the 120% rule, not against the service size alone.

Most recent permit on record for this parcel: 2026-03-27 (TC-COM-0326-00437) — We will be conducting maintenance on solar equipment and will need the Los Ranchitos school de-energized..

Permit history (12)

Permit history for this parcel — 8 of 12 records
DateRecordWhatStatusValue
2026-03-27finaledTC-COM-0326-00437City permit recordSolar PVWe will be conducting maintenance on solar equipment and will need the Los Ranchitos school de-energized.Complete
2025-12-03finaledTR-UTL-1225-02047City permit recordRight-of-Way (ROW) - UtilityWO T126617 - TEP TO PARK AND WORK IN ROW TO INSTAL (1) NEW 2.5" PRIMARY RISER AT EACH LOCATION. NO LINEAR EXCAVATION REQUIREDComplete
2024-03-05TR-ROW-0324-00261City permit recordRight-of-Way (ROW)LOS RANCHITOS - CHIP SEAL. CITY PROJECT NICK GERMANOS .Void
2023-09-25finaledTR-ROW-0923-01185City permit recordRight-of-Way (ROW)Install Environmental Monitoring Well- 100'Dx2'W. 0700AM-1530PM - WELL OWNER-Morris Air National Guard BaseComplete
2018-03-21expired 2019-04-23T18CM02113City permit recordSolar PVCARPORT WITH SOLARExpired
2013-06-24expired 2013-08-23T13EX00862City permit recordEXCAVTRENCH 48LF ASPHALT AND 25 LF OF DIRT FOR TWO 6" FUTURE STUBS FOR TUCSON WATER (APA)Closed
2009-07-22finaledT09CM01954City permit recordSolar PVSOLAR PHOTO VOLTAIC PANELSFinal
2006-03-30finaledT06OT00894City permit recordC-OF-OC OF O:PRESCHOOLC of o
Show 4 older records
Permit history for this parcel — remaining 4 records
DateRecordWhatStatusValue
2003-02-12finaledT03BU00375City permit recordSPKLRFIRE SPKR:ADD 24 & INSTALL 8LF OF 4" PIPEFinal
2002-12-05expired 2003-02-03T02EX01401City permit recordEXCAVEXCAV:130 LF UTILITY TRENCHClosed
2002-07-05T02AN00603City permit recordADDRNEWIssued
2002-07-05finaledT02CM03201City permit recordAddition / alterationADDITION:CLASSROOM BUILDING & REST ROOMC of o

How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.

Code enforcement (2)

Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.

Code enforcement history for this parcel — 2 of 2 records
DateRecordWhatStatus
2007-03-22T07FR00557Code enforcement caseCode enforcement caseField
2006-02-13T06FR00161Code enforcement caseCode enforcement caseField

Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this report was built

This is a reading of public records for parcel 140280260 — 12 permits on file from 2002 to 2026 (3 solar pv, 2 right-of-way (row), 2 excav, 1 right-of-way (row) - utility) and 2 code enforcement cases — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.

The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.