Electrical permit history — 2275 E Ganley Rd
2275 E Ganley Rd, Tucson — built 1984, with 44 permits on record. Review electrical, HVAC and remodel history with links to official records.
Commercial property
2275 E Ganley Rd
Built 1984 — 1980s commercial stock · last permitted panel/service work 2008 (finaled)
Permanent link: Electrical permit history for 2275 E Ganley Rd (aztucsonelectricalsolutions.com/property/140280030/2275-e-ganley-rd-tucson-az-85706) · Public records last checked 2026-08-16
- Parcel
- 140280030
- Built
- 1984 (county record)
- Jurisdiction
- Tucson
- Zoning
- I-1
- Assessor use
- Spec Purpose Manuf Industrial Complex
- Parcel size
- 4.28 acres
- Sewer
- No connection on file (sewer or septic status not confirmed by the record — verify on site)
- Flood zone
- X — minimal flood hazard (FEMA)
- Historic preservation
- Not on file (City of Tucson HP layers)
- Service on record
- City records show the 2008 permit was finalized; the permit description states “UPGRADE: 800 AMP TO 1200 AMP”.
See the property
Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.
Is it time to upgrade?
- Electrical service & distributionCurrentLast permitted 2008 (18 years ago). City inspection record: ELECTRIC - FINAL approved 2008-11-19. Contractor of record: GILBERT ELECTRIC COMPANY INC *C. Worth reading the permit itself: it names the service but does not read as an increase in capacity, so this may have been a like-for-like replacement rather than an upgrade. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service. T08EL02029 — UPGRADE: 800 AMP TO 1200 AMP
- Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2022 combo permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
- Fire alarm & life safetyCurrentLast permitted 2013 (13 years ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. T13BU00616 — SPRINKLERS
- RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.
A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.
What that usually means electrically
- Era-based check — high priority
Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.
- Era-based check
NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.
- Worth confirming
Industrial and warehouse space usually means three-phase motor loads. High-bay LED retrofits and added VFDs both change the load picture.
- Worth confirming
Solar was permitted here in 2021. That means there is an existing interconnection, and the main breaker and busbar rating already carry a PV backfeed — so anything else you add (an EV charger, a heat pump) has to be checked against what is left under the 120% rule, not against the service size alone.
Most recent permit on record for this parcel: 2025-12-04 (TR-UTL-1225-02066) — Excavating a 3' x 11' trench at 2275 E Ganley Rd to replace gas service in dirt and a 3' x 4' bellhole in private asphalt to abandon gas line. Trench will be located appx 6' east of west P/L..
Permit history (44)
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2025-12-04expired 2026-01-07 | TR-UTL-1225-02066City permit record | Right-of-Way (ROW) - UtilityExcavating a 3' x 11' trench at 2275 E Ganley Rd to replace gas service in dirt and a 3' x 4' bellhole in private asphalt to abandon gas line. Trench will be located appx 6' east of west P/L. | Inspections | |
| 2025-03-17expired 2025-10-29 | TS-PRM-0325-00108City permit record | Fence / wallInstall non-illuminated wall sign | Issued | |
| 2023-12-12expired 2024-08-19 | TC-COM-1223-02816City permit record | Commercial BuildingNew water line | Issued | |
| 2023-06-22finaled | TR-ROW-0623-00898City permit record | Right-of-Way (ROW)Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project | Complete | |
| 2023-03-16finaled | TR-ROW-0323-00502City permit record | Right-of-Way (ROW)Perform 7-inch diameter soil borings to depths of approximately 3 feet below existing site grade along Bilby Road between 12th Avenue and Country Club Road to obtain soil samples for a pavement section design | Complete | |
| 2022-06-01finaled | T22RW02030City permit record | ROWInstallation of (2) 3" SCH 40 PVC conduit, (1) 3/4" SCH 40 PVC conduit and, (1) 1" SCH 40 PVC conduit to house electrical and data cables. Related to DP21-0032 | Final | |
| 2022-02-17finaled | T22CM01222City permit record | COMBO325kW AC Photovoltaic Parking Canopy Installation | L of c | |
| 2021-06-11finaled | T21CM04889City permit record | COMBOAdding air compressor # 2 and providing signage as follows, "THIS EQUIPMENT SHALL NOT OPERATE IN CONJUNCTION WITH AIR COMPRESSOR # 1. ONLY A QUALIFIED ELECTRICIAN SHALL PUT THIS EQUIPMENT INTO/OUT OF SERVICE." | Final |
Show 36 older records
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2021-02-02finaled | DP21-0032City permit record | Solar PVSITE - CAID, Meter 3, solar parking canopies. | Complete | |
| 2021-01-11finaled | DP21-0008City permit record | Solar PVSITE - CAID, Meter 4, solar photovoltaic shade canopy. | Complete | |
| 2020-09-29finaled | T20RW05269City permit record | ROWTEP WILL BE INSTALLING 3 CONCRETE POLES IN ELECTRICAL UTILITY EASEMENT FOR DUSK TO DAWN LIGHTING. TRUCKS WILL WE PARKED R.O.W. WITH NO LANE CLOSURES NECESSARY NOTE: GANLEY RD, SEARS BL & BILBY RD is under a pavement moratorium, any new asphalt that is disturbed will require a 2” mill and overlay for 50’ in each direction from the outside of the cut for all effected travel lanes. | Final | |
| 2020-06-02finaled | T20RW03120City permit record | ROWN.734984 JOB WILL REQUIRE 10' OF TRENCHING AND 16SQFT OF ASPHALT REMOVAL/REPLACEMENT AND ACCESS TO HH#'S 2201 AND 15208 TO SPLICE FIBER | Final | |
| 2020-02-12finaled | T20RW00914City permit record | ROWSEWER REHABILITATION NO EXCAVATION | Final | |
| 2019-12-12 | T19RW07513City permit record | Right-of-Way (ROW)Non-construction permit. This permit serves as City of Tucson approval of the Lighting Service Plan; Work Order: 6269865 | Approved | |
| 2019-11-21finaled | T19RW07138City permit record | ROWTEP WILL BE INSTALLING A NEW SINGLE PHASE TRANSFORMER ON POLE #11 ADDRESS ON THE APPLICATION IS 2350 E BILBY RD. | Final | |
| 2019-10-10finaled | T19RW05983City permit record | ROWJOB WILL REQUIRE 161' BORE. 1358 AERIAL CABLE PLACEMENT, 11' TRENCHING AND PLACEMENT OF 2 NEW 3048 HH A NOTICE OF TEMPORARY HOLIDAY RESTRICTION APPLIES TO THIS PERMIT AND WILL BE IN EFFECT FROM THANKSGIVING DAY TO JANUARY 2. DUE TO THE INCREASING TRAFFIC VOLUME ON MANY OF THE CITY'S ROADS, IT IS NECESSARY TO RESTRICT LANE CLOSURES ON CERTAIN ROADS DURING THE HOLIDAY SEASON. | Final | |
| 2019-07-26finaled | T19RW04155City permit record | ROWJOB WILL REQUIRE 161' BORE, 1,358 AERIAL CABLE PLACEMENT, 11' TRENCHING AND PLACEMENT OF 2 NEW 3048 HH's. | Final | |
| 2019-05-08finaled | T19RW02596City permit record | ROWN.523606 JOB WILL REQUIRE ACCESS TO HH # 14866 AND MH # 15434 TO SPLICE FIBER ADDRESS ON APPLICATION- 2469 E BILBY | Final | |
| 2017-04-05expired 2017-10-02 | T17CM02627City permit record | COMBOREPL 400AMP DISCONNECT WITH IR HOT SPOT | Expired | |
| 2014-03-26 | T14BU00328City permit record | TANKSREMOVE/REPLACE PROPANE TANKS | Withdrwn | |
| 2013-05-29finaled | T13BU00616City permit record | SPKLRSPRINKLERS | Final | |
| 2011-10-20finaled | T11BU01391City permit record | GRADSWPPGRADING | Final | |
| 2011-02-24finaled | T11BU00255City permit record | SPKLRINSTALL 6 NEW FIRE SPRINKLERS AND REPLACE 14. | Final | |
| 2009-08-21finaled | T09BU01246City permit record | SPKLRInstall 20 fire sprinklers | Final | |
| 2009-06-26expired 2011-06-26 | T09BU00940City permit record | SPKLRINSTALL 1 NEW FIRE SPRINKLER HEAD. | Expired | |
| 2008-10-24finaled | T08EL02029City permit record | ELECTUPGRADE: 800 AMP TO 1200 AMP | Final | |
| 2008-10-16expired 2011-07-07 | T08BU01862City permit record | SPKLRInstall 7 new fire sprinkler heads. | Expired | |
| 2008-06-17expired 2009-06-27 | T08BU01117City permit record | SPKLRRelocate 1 fire sprinkler | Closed | |
| 2008-06-17finaled | T08BU01120City permit record | SPKLRInstall 34 fire sprinklers | Final | |
| 2006-08-01finaled | T06BU01902City permit record | SPKLRFIRE SPRINKLER: ADD 90'0" NEW 6" UNDERGROUND PIPIING ADD 160 NEW FIRE SPRINKLERS | Final | |
| 2006-06-09expired 2007-04-01 | T06BU01459City permit record | SPKLRFIRE SPRINKLER: 10 NEW, 16 RELOCATE | Closed | |
| 2006-06-09expired 2006-12-12 | T06BU01462City permit record | SPKLRFIRE SPRINKLERS: ADD 15' OF 4" PIPE | Closed | |
| 2004-11-04expired 2005-01-03 | T04EX01051City permit record | EXCAVEXCAV:80 LF TRENCH FOR ELECTRIC CONDUIT | Closed | |
| 2004-08-11finaled | T04BU01992City permit record | SPKLRFIRE SPKR:ADD 9 | Final | |
| 2003-09-02finaled | T03EL01772City permit record | ELECTSERVICE:ELECTRIC FOR AIR COMPRESSOR | Final | |
| 2003-02-28finaled | T03PL00396City permit record | PLUMBINSTALL:NEW GAS LINE & METER | Final | |
| 2002-07-10 | T02AN00623City permit record | ADDRNEW | Issued | |
| 2001-09-06finaled | T01BU02602City permit record | SPKLRFIRE:SPKR:RELOCATE 1 & ADD 1 | Final | |
| 2000-10-16finaled | T00ME01122City permit record | MECHPRESSURE VESSEL INSPECTION: TUC-24218, 23374 | Final | |
| 1999-11-29expired 2000-05-27 | T99EL03093City permit record | ELECTSIGNS:CIRCUIT:TS199911-152 | Closed | |
| 1999-04-29finaled | T99CM02063City permit record | COMBOSTORAGE BUILDING | Final | |
| 1997-04-10finaled | T97BU00429City permit record | SPKLRFIRE SPKR:ADD 8 | Final | |
| 1996-12-26expired 1997-02-24 | T96EX00607City permit record | EXCAVLANDSCAPING | Closed | |
| 1996-09-09 | P96AN00033City permit record | ADDRNEW | Issued |
How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.
Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.
This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel.
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
The permanent link and the summary above, once. No list, no follow-up unless you ask for it.
How this report was built
This is a reading of public records for parcel 140280030 — 44 permits on file from 1996 to 2025 (13 spklr, 8 row, 4 combo, 3 right-of-way (row)) — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.
The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).
Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.