Electrical permit history — 2622 E Bilby Rd

2622 E Bilby Rd, Tucson — built 2022, with 16 permits on record. Review electrical, HVAC and remodel history with links to official records.

Commercial property

2622 E Bilby Rd

Built 2022 — 2020s commercial stock · 16 permits on record; no permitted panel/service or HVAC work among them

Parcel
14027042C
Built
2022 (assessor record)
Jurisdiction
Tucson
Zoning
P-I
Assessor use
Warehousing
Parcel size
2.98 acres
Building area
69,714 sq ft (assessor record)
Sewer
Connection on file (2022) (county sewer connection records)
Flood zone
X — minimal flood hazard (FEMA)
Historic preservation
Not on file (City of Tucson HP layers)

See the property

County aerial photograph centered on 2622 E Bilby Rd, parcel outlined

Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.

Is it time to upgrade?

  • Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2022 firecons permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
  • Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2022 firecons permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
  • Fire alarm & life safetyCurrentLast permitted 2022 (4 years ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. T22FC00438 — NFP to provide a new fire sprinkler system for the new bldg.
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Era-based check

    A capacity and condition review is the usual starting point before any tenant improvement or added load. The permit record does not confirm this; an on-site inspection is required.

Recorded sales (1)

Recorded transfers from the Pima County Assessor — 1 of 1
DatePriceType
2002-10-24$607,662Warranty Deed

Recorded sales are the sales the Pima County Assessor has on file from affidavits of property value — not every transfer, not listings, and not a valuation. Parties are never shown here. A sale with no permitted electrical work since is worth knowing before the next sale or a remodel.

Most recent permit on record for this parcel: 2023-06-22 (TR-ROW-0623-00898) — Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project.

Permit history (16)

Permit history for this parcel — 8 of 16 records
DateRecordWhatStatusValue
2023-06-22finaledTR-ROW-0623-00898City permit recordRight-of-Way (ROW)Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization ProjectComplete
2022-10-08finaledT22RW03682City permit recordRight-of-Way (ROW)Starting on the Southside of E Ganley Rd West of South Tucson Blvd at TEP pole DE & RE Lash .144 ct; Work Order: PRJ232003-1Complete
2022-06-29finaledT22FC00438City permit recordFIRECONSNFP to provide a new fire sprinkler system for the new bldg.Final
2022-05-25finaledT22FC00371City permit recordFIRECONSNFP to install 32'-0 of 4" fire line.Final
2022-04-15finaledT22RW01508City permit recordROWTUCSON WATER JOC - FIRE HYDRANT/FIRE SERVICE CONTRACT #171701 INSTALL A 4" FIRE PROTECTION SERVICE, 1" & 2 " WATER SERVICE CONNECTIONS, 5/8" IRRIGATION WATER METER AND 1.5" POTABLE WATER METER. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP.Final
2022-04-14finaledT22RW01502City permit recordROW(1) 4 FT X 45 FT TRENCH IN FRONT DIRT TO INSTALL NEW GAS SERVICE LINE ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 50’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. ARTERIAL COLLECTOR 1. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 2. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. 3. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION. 4. MAINTAIN PEDESTRIAN ACCESS 5. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. IF WEEKEND WORK, MAKE CONTACT 48 HOURS PRIOR TO THE WEEKEND. DAN ROBERTSON- 520-400-6722 OR TOM ADKINS- 520-400-3813Final
2021-09-28finaledT21FC00736City permit recordFIRECONSFire Alarm - New Sprinkler Monitor .Final
2021-08-30expired 2023-02-25T21RW04023City permit recordRight-of-Way (ROW)INDUSTRIAL BUILDING AT BILBY, DP20-0237SAWCUT AND EXCAVATE APPROX. 60 LF ACROSS ROADWAY FOR SEWEApproved
Show 8 older records
Permit history for this parcel — remaining 8 records
DateRecordWhatStatusValue
2021-01-06finaledT21CM00185City permit recordCommercial BuildingNew WarehouseComplete
2021-01-06finaledT21CM00185-C-OF-OCity permit recordCertificate of OccupancyNew WarehouseComplete
2020-11-16expires 2027-05-29DP20-0237City permit recordDevelopment PackageSite/Grading/Swpp - Industrial Building at Bilby.Issued
2018-02-27expired 2019-01-20T18CM01546City permit recordCommercial BuildingNEW WAREHOUSEExpired
2017-09-26DP17-0237City permit recordNew constructionNEW BUILDINGWithdrwn
2007-01-22T07AN00067City permit recordADDRNEWIssued
2007-01-22T07BU00156City permit recordGRADINGGRADINGWithdrwn
2007-01-22T07CM00265City permit recordCOMBOSITE/NEW: INDUSTRIALWithdrwn

How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.

Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.

Planning work at this property?

Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this report was built

This is a reading of public records for parcel 14027042C — 16 permits on file from 2007 to 2023 (3 right-of-way (row), 3 firecons, 2 row, 2 commercial building) — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.

The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.