Electrical permit history — 6393 S Campbell Av

6393 S Campbell Av, Tucson — built 1991, with 53 permits on record. Review electrical, HVAC and remodel history with links to official records.

Electrical Property Screening Report · Commercial property

6393 S Campbell Av

A screening report for electrical planning, assembled from public-record indicators. It is not an official record and every figure in it should be verified against the issuing agency before it is relied on.

Verify parcel data at official source ↗

Built 1991 — 1990s commercial stock · last permitted panel/service work 2023 (finaled) · HVAC 2020 (finaled)

Is it time to upgrade?

  • Electrical service & distributionFinaled permit foundLast permitted 2023 (3 years ago). Worth reading the permit itself: it names the service but does not read as an increase in capacity, so this may have been a like-for-like replacement rather than an upgrade. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service. TC-COM-1122-00067 — New Service Facility
  • Heating, cooling & mechanicalFinaled permit foundLast permitted 2020 (6 years ago). Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. T20CM07356 — HVAC UPGRADE
  • Fire alarm & life safetyFinaled permit foundLast permitted 2024 (2 years ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. TF-FCP-0324-00212 — Offsite monitoring of the existing fire panel at this location
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitized. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Era-based check

    A finaled 2023 panel/service permit is on record for this parcel, which makes it unlikely the original 150–200 A equipment is still in place. That is a permit record, not an inspection — verify the installed rating and the panel brand on site before sizing anything new. The permit record does not confirm this; an on-site inspection is required.

  • Era-based check

    Gear in this age range is usually still supported but is due for infrared scanning and torque verification if that has not been done recently. The permit record does not confirm this; an on-site inspection is required.

  • Era-based check

    NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.

  • Routine

    A trade permit was pulled in 2020. Trade permits cover electrical, plumbing, and mechanical work individually, so some permitted trade work has been done here since.

Solar and energy potential

Roof footprint
≈ 29,838 sq ft (county building-footprint layer)
Usable for solar, planning estimate
≈ 20,900 sq ft (~70% after setbacks, rooftop equipment and access paths)
Array that could fit
on the order of 230 kW — roughly 580 panels (low-tilt ballasted rows, 400 W class modules)
Estimated annual production
≈ 380,000 kWh (PVWatts, Tucson sun, low-tilt south)
Energy-charge offset at TEP commercial rates
$30,000–$49,000 a year (8–13¢/kWh energy + power-supply charges, by season and rate class)

Planning-level arithmetic on the roof area above — not a shading study, a structural review or a design. The offset assumes the building uses the power as it is generated; TEP pays far less (its export rate is about 5¢/kWh) for surplus sent to the grid, so the load profile decides the real value. The 30% federal credit (§48E) still applies to commercial systems placed in service by the end of 2027 — projects that began construction by July 4, 2026 have longer; confirm timing with a tax adviser.

TEP grid capacityThis parcel is not inside any of the 11 areas TEP has mapped as saturated with distributed generation (the nearest, “I-10 and Valencia Rd”, is about 2 miles away — TEP’s map set, July 2020). New generation still goes through TEP’s interconnection screens, and a heavy new load still merits a utility capacity check — the maps only mark where that review is most likely to bite.

Get a commercial solar & switchgear analysis

See the property

Satellite imagery © Google. Imagery can predate recent work and shows nothing about what is inside — context, not evidence.

Flood and drainage

The federal flood map and the local one are not the same map, and they do not always agree. FEMA’s is the insurance map; the City of Tucson regulates against its own, and that is the one a permit here is judged against.

The record behind this read

Parcel
14026011A
Year constructed
1991 (assessor record)
Permitting authority
Tucson
Zoning
I-1
Property type
Warehousing
Building area
57,620 sq ft
Service on record
City records show the 2023 permit was finalized; the permit description states “New Service Facility”.

The building area above comes from the Pima County Assessor’s record, as we read it on 28 Jan 2026. Each other row names its own source.

The most recent permitted work on this parcel was in 2026. That says the parcel was worked on under permit, not what the work covered — a roof, a pool or a changeout tells you nothing about the electrical service. Work done without a permit leaves no trace here at all.

What this means for work here

Informational public-record summary — not engineering, inspection, valuation or purchasing advice, and not the official record.

The most recent permitted work on this parcel was in 2026. That says the parcel was worked on under permit, not what the work covered — a roof, a pool or a changeout tells you nothing about the electrical service. Work done without a permit leaves no trace here at all.

What that reading rests on. The issuing offices hold 53 building permits for this parcel dated between 2000 and 2026. By category the work is right-of-way (row) permit - utility (6), trade permit (6), fire alarm system (5) and fire automatic extinguishing system (5). 32 of them carry a final inspection; the other 21 were issued, expired or are still open, which is not the same as work completed.

Go straight to the records

Each link opens the issuing office’s own file for that record — dates, scope, status and inspections are theirs to publish, and they are all on the other side of these links.

Read the records yourself. We republish selected facts and record numbers so you can find the file; the issuing agency’s record controls. The files are held by City of Tucson permit record (PRO) ↗ — search the parcel number 14026011A. Permit and parcel information courtesy of the City of Tucson and Pima County; their files are the official record and control over anything summarized here.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.

Utility and upgrade pathElectric service here is Tucson Electric Power (TEP). A service or panel upgrade needs a TEP meter release and has to meet TEP’s service requirements — meter height and location, clearances, and the point of attachment. See TEP new-service requirements and the TEP standards notes.

In the public record: All industrial property · Commercial property in 85706 · Commercial & industrial reports · Homes in 85706 · Permit data by neighborhood

Planning work at this property?

Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

What the flood note is not. The flood zone shown is FEMA’s National Flood Hazard Layer — the federal insurance map. Local floodplain mapping is not reproduced here; use the authority’s own map, linked above. Nothing here is a floodplain determination, an elevation certificate, or a substitute for one. A parcel can straddle a boundary, and a Letter of Map Amendment can remove a structure the map still covers. For a determination, ask the floodplain administrator for the jurisdiction named above; for a design that has to satisfy one, that is work we do.

How this property compares nearby

Properties on S CAMPBELL AV hold 1,146 City permits on record, 641 of them since 2022.

Computed from the same public records as this report — counts and years, not an appraisal.

Complete permit record (53 entries)

Every permit and case we hold for this parcel, newest first. Each number links to the official file.

YearNumberTypeStatus
2026TF-FOP-0325-00405General Operational Fire PermitIssued
2026TF-FOP-0325-00408General Operational Fire PermitIssued
2026TF-FOP-0325-00406General Operational Fire PermitIssued
2026TF-FOP-0325-00407General Operational Fire PermitComplete
2024TS-PRM-0924-00399Permanent Sign PermitIssued
2024TC-CFO-0424-00089Temporary Certificate-of-Occupancy (TCO)Denied
2024TC-CFO-0424-00086Temporary Certificate-of-Occupancy (TCO)Denied
2024TF-FCP-0324-00212Fire Alarm System PermitComplete
2024recordRight-of-Way (ROW) Permit - UtilityComplete
2024TF-FCP-0124-00017Fire Alarm System PermitComplete
2023recordRight-of-Way (ROW) Permit - UtilityComplete
2023TE-BAS-0923-00180Commercial Water Harvesting OrdinanceInactive
2023TF-FCP-0823-01021Fire Automatic Extinguishing System PermitComplete
2023recordRight-of-Way (ROW) Permit - UtilityComplete
2023recordROW Permit - Development/BuildingIssued
2023TF-FCP-0623-00796Fire Alarm System PermitComplete
2023recordRight-of-Way (ROW) Permit - UtilityComplete
2023TF-FCP-0623-00736Fire Automatic Extinguishing System PermitComplete
2023TC-COM-1122-00067Commercial New Building PermitComplete
2023recordRight-of-Way (ROW) Permit - UtilityComplete
2023DP22-0266Development PackageComplete
2023recordRight-of-Way (ROW) Permit - UtilityComplete
2022CWH-22-0266Commercial Water Harvesting OrdinanceSubmitted
2020T20CM07356Commercial Trade PermitComplete
2018DS18-06Zoning Verification LetterApproved
2018T18FC00036Fire Alarm System PermitComplete
2018T17FC01047Fire Automatic Extinguishing System PermitExpired
2017T17CM08408Commercial Addition/Alteration PermitCanceled
2017T17BA00009Stormwater BasinApproved
2017T17BA00008Stormwater BasinApproved
2017T17BA00007Stormwater BasinApproved
2017T17CM06300Commercial Addition/Alteration PermitComplete
2017DP17-0174Development PackageComplete
2017T17FC00597Fire Alarm System PermitComplete
2017T17FC00594Fire Automatic Extinguishing System PermitComplete
2017CWH-17-0174Commercial Water Harvesting OrdinanceActive
2017T17CM04587Commercial Addition/Alteration PermitComplete
2017DP17-0134Development PackageComplete
2014DP13-0201Development PackageComplete
2013C9-13-11 RezoningEffectuated
2013T13PRE0039Pre-Application ConferenceCanceled
2013T13CM01573Commercial Trade PermitWithdrawn
2013T13BU00174Commercial Trade PermitComplete
2013T13BU00161Commercial Trade PermitComplete
2013T13OT00147Permanent Sign PermitComplete
2013T13BU00122Fire Automatic Extinguishing System PermitComplete
2012T12CM07696Commercial Trade PermitComplete
2012DP12-0192Development PackageComplete
2012T12BU01217Commercial Fence/Wall PermitComplete
2012T12TUP0021Temporary Use PermitWithdrawn
2008T08PRE0044Pre-Application ConferenceCanceled
2007T07OT00913Permanent Sign PermitComplete
2000T00ME01095Commercial Trade PermitComplete

prints this report — permits, comparisons and sources — as a clean document

How this report was built

This is a reading of public records for parcel 14026011A — 53 City permits on file from 2000 to 2026 — assembled from the Pima County parcel file and the City of Tucson’s published permit layers together with the City’s own migrated permit archive, whose records reach back to the mid-1990s. Some records were still not read for this snapshot: City permit records before the mid-1990s were never fully digitized. The construction year, living area on this page come from our saved copy of the Assessor’s own published data file (dated 2026-01-28). The sewer connection file and the flood map were not read for this snapshot. Absence of a permit here is NOT evidence work was never permitted — it may predate the digitized record or sit in a system this snapshot did not read. Public records snapshot taken 2026-09-22.

The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.