Electrical permit history — 5489 S Park Av

5489 S Park Av, Tucson — built 2022, with 33 permits on record. Review electrical, HVAC and remodel history with links to official records.

Multifamily property

5489 S Park Av

Built 2022 — 2020s multifamily stock · last permitted panel/service work 2023 (finaled)

Parcel
14021002B
Built
2022 (assessor record)
Jurisdiction
Tucson
Zoning
C-2
Assessor use
Apartments 5 - 24 Units 2 Story
Parcel size
1.02 acres
Building area
18,376 sq ft (assessor record)
Sewer
Connection on file (2021) (county sewer connection records)
Flood zone
X — minimal flood hazard (FEMA)
Historic preservation
Not on file (City of Tucson HP layers)
Service on record
City records show the 2023 permit was finalized; the permit description states “WO#2480529_5489 S Park Ave 15-14-06. Install new service line in asphalt on southbound lanes 6LF/EM”.

See the property

County aerial photograph centered on 5489 S Park Av, parcel outlined

Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.

Is it time to upgrade?

  • Electrical service & distributionCurrentLast permitted 2023 (3 years ago). City inspection record: last recorded inspection 2023-10-03; no approved final is shown. Worth reading the permit itself: it names the service but does not read as an increase in capacity, so this may have been a like-for-like replacement rather than an upgrade. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service. TR-UTL-0323-01202 — WO#2480529_5489 S Park Ave 15-14-06. Install new service line in asphalt on southbound lanes 6LF/EM
  • Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2022 solar pv permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
  • Fire alarm & life safetyNot in this windowNothing in the permit records we read for this parcel that names this system. Any alarm or sprinkler work here predates this feed. For an occupied commercial building that is worth confirming from the panel and the inspection tags rather than assuming.
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Worth confirming

    Multifamily property. House panels, unit meters, and common-area loads are usually metered and maintained separately — worth confirming which side of the meter a problem falls on before scheduling work.

  • Worth confirming

    Solar was permitted here in 2022. That means there is an existing interconnection, and the main breaker and busbar rating already carry a PV backfeed — so anything else you add (an EV charger, a heat pump) has to be checked against what is left under the 120% rule, not against the service size alone.

  • Era-based check

    A capacity and condition review is the usual starting point before any tenant improvement or added load. The permit record does not confirm this; an on-site inspection is required.

Recorded sales (1)

Recorded transfers from the Pima County Assessor — 1 of 1
DatePriceType
2018-08-31$74,000Warranty Deed

Recorded sales are the sales the Pima County Assessor has on file from affidavits of property value — not every transfer, not listings, and not a valuation. Parties are never shown here. A sale with no permitted electrical work since is worth knowing before the next sale or a remodel.

Most recent permit on record for this parcel: 2024-09-11 (TZ-CMP-0924-00132) — Please see attached..

Permit history (33)

Permit history for this parcel — 8 of 33 records
DateRecordWhatStatusValue
2024-09-11finaledTZ-CMP-0924-00132City permit recordZoning Verification LetterPlease see attached.Complete
2023-03-30finaledTR-UTL-0323-01202City permit recordRight-of-Way (ROW) - UtilityWO#2480529_5489 S Park Ave 15-14-06. Install new service line in asphalt on southbound lanes 6LF/EMComplete
2022-11-07finaledT22RW03763City permit recordRight-of-Way (ROW)DEVELOPMENT PLAN NUMBER: DP 18-0229INSTALL SIDEWALK SCUPPER AND RIP RAP PER PLANS.Complete
2022-06-16finaledT22CM04484City permit recordSolar PVSolar PanelsFinal
2022-06-16finaledT22CM04486City permit recordSolar PVSolar PanelsFinal
2022-06-16finaledT22CM04489City permit recordSolar PVSolar PV PanelsFinal
2022-06-15finaledT22CM04459City permit recordSolar PVSolar PanelsComplete
2022-06-15finaledT22CM04469City permit recordSolar PVSolar PanelsComplete
Show 25 older records
Permit history for this parcel — remaining 25 records
DateRecordWhatStatusValue
2022-06-15finaledT22CM04476City permit recordSolar PVSolar PanelsComplete
2022-06-15finaledT22CM04461City permit recordSolar PVSolar PV PanelsFinal
2022-06-15finaledT22CM04463City permit recordCOMBOSpolar PanelsFinal
2022-06-15finaledT22CM04466City permit recordSolar PVSolar PanelsFinal
2022-06-15finaledT22CM04467City permit recordSolar PVSolarPanelsFinal
2022-06-15finaledT22CM04470City permit recordSolar PVSolar PanelsFinal
2022-06-15finaledT22CM04472City permit recordSolar PVSolar PanelsFinal
2022-06-15finaledT22CM04473City permit recordSolar PVSolar PanelsFinal
2022-06-15finaledT22CM04474City permit recordSolar PVSolar PanelsFinal
2022-06-15finaledT22CM04477City permit recordSolar PVSolar PanelsFinal
2022-06-15finaledT22CM04478City permit recordSolar PVSolar PanelsFinal
2022-06-15finaledT22CM04479City permit recordSolar PVSolar PanelsFinal
2022-06-15finaledT22CM04480City permit recordSolar PVSolar PanelsFinal
2021-07-19finaledT21RW03402City permit recordROW50' of header curb and concrete approach entrance at Minorka Street entrance to Project. Tie into existing street asphalt Design specs per DP18-0229. Work located on E Minorka St, between S Park Av and S White Rock AvFinal
2021-06-24finaledT21RW03077City permit recordROWEXCAVATE 20 LF INTO E MINORKA RD AND INSTALL 3" WATERLINE. WORK AREA BETWEEN S PARK AV AND S WHITE ROCK AV. COMPLETE CLOSURE REQUIRED ASSOCIATED DEV PKG: DP18-0229 Proof of notification is required at the time of the preconstruction meeting.Final
2021-05-13finaledT21RW02373City permit recordROWStarting on the West side of S White Rock Ave and South of E Minorka Rd, Riser up and Overlash 246' going North continue going West 317' continue 40' North tie in. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. ALL AERIAL WORK MUST BE A MINIMUM OF 16-FT HIGH. AND MUST BE A MINIMUM OF 18-FT HIGH WHEN CROSSING INTERSECTIONS, PAVEMENT AND ALLEYS. MAINTAIN PEDESTRIAN ACCESSFinal
2021-04-16finaledT21RW01816City permit recordROWINSTALL MANHOLE AND 28 LF OF SEWER. INSTALL 90 LF OF SIDEWALK. INSTALL TWO ACCESS RAMPS. INSTALL DRIVEWAY & A SCUPPER PER DP18-0229 FOR RIO MADERA APARTMENTS. Proof of notification is required at the time of the preconstruction meeting.Final
2021-02-05finaledT21RW00601City permit recordROWPOTHOLE NEEDED TO COMPLETE LOCATE. 2 5X5 BELLHOLES IN DIRT FRONT / BLACK TOP TO POTHOLE GAS LINEFinal
2020-06-04finaledT20CM03404City permit recordCommercial BuildingNEW MULTI FAMILYComplete
2020-06-04finaledT20CM03404-C-OF-OCity permit recordCertificate of OccupancyNEW MULTI FAMILYComplete
2020-06-04finaledT20CM03405City permit recordCommercial BuildingNEW MULTI FAMILYComplete
2020-06-04finaledT20CM03405-C-OF-OCity permit recordCertificate of OccupancyNEW MULTI FAMILYComplete
2019-02-04DS19-01City permit recordZoning Verification LetterRIO MADERA APTS - TSMR, Section 7-01.4.1.AApproved
2018-09-12finaledDP18-0229City permit recordDevelopment PackageSITE/GRADE/SWPPP - Rio Madera Apartments.Complete
2018-05-03T18OT00478City permit recordFloodplain UseFlood status requestSubmitted

How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.

Code enforcement (3)

Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.

Code enforcement history for this parcel — 3 of 3 records
DateRecordWhatStatus
2024-01-25CE-VIO0124-00385Code enforcement caseWork without permitClosed - resolved
2012-11-21T12DV10675Code enforcement caseVegetationNoverify
2008-09-23T08DV09005Code enforcement caseVegetationNoverify

Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.

Planning work at this property?

Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this report was built

This is a reading of public records for parcel 14021002B — 33 permits on file from 2018 to 2024 (17 solar pv, 5 row, 2 zoning verification letter, 2 commercial building) and 3 code enforcement cases — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-17; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.

The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.