Electrical permit history — 5701 S 12th Av
5701 S 12th Av, Tucson — built 2020, with 22 permits on record. Review electrical, HVAC and remodel history with links to official records.
Commercial property
5701 S 12th Av
Built 2020 — 2020s commercial stock · 22 permits on record; no permitted panel/service or HVAC work among them
Permanent link: Electrical permit history for 5701 S 12th Av (aztucsonelectricalsolutions.com/property/13813001e/5701-s-12th-av-tucson-az-85706) · Public records last checked 2026-08-17
- Parcel
- 13813001E
- Built
- 2020 (assessor record)
- Jurisdiction
- Tucson
- Zoning
- C-1
- Assessor use
- Car/Truck Wash Full Service
- Parcel size
- 0.71 acres
- Building area
- 2,327 sq ft (assessor record)
- Sewer
- Connection on file (1961) (county sewer connection records)
- Flood zone
- X — minimal flood hazard (FEMA)
- Historic preservation
- Not on file (City of Tucson HP layers)
See the property
Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.
Is it time to upgrade?
- Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
- Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
- Fire alarm & life safetyNot in this windowNothing in the permit records we read for this parcel that names this system. Any alarm or sprinkler work here predates this feed. For an occupied commercial building that is worth confirming from the panel and the inspection tags rather than assuming.
- RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.
A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.
What that usually means electrically
- Worth confirming
A pool or spa was permitted in 2022. Pool equipment brings its own bonding grid, GFCI requirements, and usually a subpanel — and the bonding rules have tightened since, so older installations are worth verifying.
- Era-based check
A capacity and condition review is the usual starting point before any tenant improvement or added load. The permit record does not confirm this; an on-site inspection is required.
Most recent permit on record for this parcel: 2022-05-12 (T22RW01815) — Tie into TEP Pole on the SE corner of 12th Ave and Drexel Rd. Over lash Heading E 2685' and tie into TEP Pole on SE Corner of 6th Ave and Drexel Rd . ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 50’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. 1. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 2. ALL AERIAL WORK MUST BE A MINIMUM OF 16-FT HIGH. AND MUST BE A MINIMUM OF 18-FT HIGH WHEN CROSSING INTERSECTIONS, PAVEMENT AND ALLEYS. 3. MAINTAIN PEDESTRIAN ACCESS 4. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. IF WEEKEND WORK, MAKE CONTACT 48 HOURS PRIOR TO THE WEEKEND. DAN ROBERTSON- 520-400-6722 OR TOM ADKINS- 520-400-3813 Aerial and Busses and Business Access, but NO Pavement Cut, NO Ground Repair, 1. BUS STOP IN THE AREA, CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 24-HOURS PRIOR TO START OF WORK FOR COORDINATION. 2. PLACE "BUSINESS ACCESS" SIGNS APPROPRIATELY. SEVERAL BUSINESSES ALONG ROUTE. 3. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 4. ALL AERIAL WORK MUST BE A MINIMUM OF 16-FT HIGH. AND MUST BE A MINIMUM OF 18-FT HIGH WHEN CROSSING INTERSECTIONS, PAVEMENT AND ALLEYS. 5. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION 6. MAINTAIN PEDESTRIAN ACCESS 7. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. IF WEEKEND WORK, MAKE CONTACT 48 HOURS PRIOR TO THE WEEKEND. DAN ROBERTSON- 520-400-6722 OR TOM ADKINS- 520-400-3813.
Permit history (22)
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2022-05-12finaled | T22RW01815City permit record | Pool / spaTie into TEP Pole on the SE corner of 12th Ave and Drexel Rd. Over lash Heading E 2685' and tie into TEP Pole on SE Corner of 6th Ave and Drexel Rd . ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 50’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. 1. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 2. ALL AERIAL WORK MUST BE A MINIMUM OF 16-FT HIGH. AND MUST BE A MINIMUM OF 18-FT HIGH WHEN CROSSING INTERSECTIONS, PAVEMENT AND ALLEYS. 3. MAINTAIN PEDESTRIAN ACCESS 4. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. IF WEEKEND WORK, MAKE CONTACT 48 HOURS PRIOR TO THE WEEKEND. DAN ROBERTSON- 520-400-6722 OR TOM ADKINS- 520-400-3813 Aerial and Busses and Business Access, but NO Pavement Cut, NO Ground Repair, 1. BUS STOP IN THE AREA, CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 24-HOURS PRIOR TO START OF WORK FOR COORDINATION. 2. PLACE "BUSINESS ACCESS" SIGNS APPROPRIATELY. SEVERAL BUSINESSES ALONG ROUTE. 3. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 4. ALL AERIAL WORK MUST BE A MINIMUM OF 16-FT HIGH. AND MUST BE A MINIMUM OF 18-FT HIGH WHEN CROSSING INTERSECTIONS, PAVEMENT AND ALLEYS. 5. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION 6. MAINTAIN PEDESTRIAN ACCESS 7. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. IF WEEKEND WORK, MAKE CONTACT 48 HOURS PRIOR TO THE WEEKEND. DAN ROBERTSON- 520-400-6722 OR TOM ADKINS- 520-400-3813 | Final | |
| 2021-11-09expired 2022-05-31 | T21OT00824City permit record | Sign - Permanent1- SF illum EMC monu | Expired | |
| 2021-03-19finaled | T21RW01310City permit record | ROWFrom TEP Pole N of 5701 S 12th Ave, head N and begin 220' overlash 12 ct fiber Node Jumper. Tie in | Final | |
| 2020-11-19expired 2022-01-02 | T20OT00777City permit record | Sign - Permanent1-illum emc SF monu sign | Expired | |
| 2020-07-09finaled | T20RW03921City permit record | ROWADD SIDEWALK CONNECTING CITY SIDEWALK TO SITE AND BUILDING. NOTES: AFTER THE FACT PERMIT, WORK DONE WHILE CONSTRUCTING T19RW0738 ***SIDEWALKS ARE TO BE ACCORDING TO PAG STANDARDS*** | Final | |
| 2020-05-05finaled | T20RW02544City permit record | ROWTEP TO COMPLETE 3 PHASE PRIMARY RISER AND INSTALL UNDERGROUND CABLE. NO LANES WILL BE CLOSED ON DREXEL | Final | |
| 2020-04-14expired 2020-10-11 | T20OT00314City permit record | Fence / wall2- ILLUM WALL SIGNS | Expired | |
| 2020-01-28finaled | T20RW00473City permit record | ROWFrom TEP pole SE corner of 5701 S 12th Ave begin 284' overlash to TEP pole, tie in . NOTES: BUS STOP IN AREA, YOU WILL HAVE TO NOTIFY SUNTRAN 24 HOURS PRIOR TO WORK SUN TRAN CONTACTS: BEA PAULUS 520-206-8826 CHRISTINA ROCK 520-206-8934 | Final |
Show 14 older records
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2019-12-04finaled | T19RW07384City permit record | ROWDYNAMITE 1 CARWASH - DP19-0042 INSTALL NEW MANHOLE IN W. DREXEL ROAD AND NEW SEWER LATERAL TO 5701 S 12TH AV. NOTE: DREXEL ROAD IS UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2" MILL AND OVERLAY FOR 50' IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. C OF O NOT TO BE RELEASED WITHOUT TRANSPORTATION'S APPROVAL. | Final | |
| 2019-11-21finaled | T19RW07142City permit record | ROW2 5x5 bellholes in blktop/dirt front and approx 20 ft trench-- to repair/replace gas line | Final | |
| 2019-10-09finaled | T19RW05955City permit record | ROWCYCLOVIA TUCSON TEMPORARILY CLOSES SELECTED TUCSON STREETS TO CAR TRAFFIC AND OPENS THEM UP TO OTHER FORMS OF TRANSPORTATION: WALKING, RUNNING, WHEELCHAIRS, BIKING, SKATING AND MORE. THIS EVENT IS FREE, SAFE, AND CONNECTS MORE THAN 40,000 PARTICIPANTS WITH UNIQUE NEIGHBORHOODS, NEW BUSINESSES, OLD FRIENDS, AND EACH OTHER FROM- 12TH AV AND DREXEL /12TH AV AND AJO WY | Final | |
| 2019-07-17 | DS19-09City permit record | Zoning Verification LetterDYNAMITE 1 CARWASH, TSMR - TSMR, 7-01.4.1.a. (ADA access from Drexel Road). | Approved | |
| 2019-02-15finaled | DP19-0042City permit record | Development PackageSITE/GRADING/SWPPP - Dynamite 1 Car Wash. | Complete | |
| 2019-02-14finaled | T19CM01102City permit record | COMBOCAR WASH | C of o | |
| 2015-07-17 | T15CM04921City permit record | COMBOINSTALL CONVEYOR BELT | Withdrwn | |
| 2011-10-26finaled | T11OT02019City permit record | SIGNPENNANTS 10/12/11 TO 10/21/11 | Final | |
| 2011-08-23finaled | T11OT01656City permit record | SIGNBANNER:45 DAY 8-26-11 THRU 10-9-11 | Final | |
| 2011-08-05expired 2012-03-05 | T11OT01538City permit record | SIGN19829 | Expired | |
| 2011-07-20expired 2011-09-18 | T11EX00364City permit record | EXCAVTRENCHING 40 LF FOR SEWER | Closed | |
| 2011-07-14expired 2012-02-27 | T11OT01387City permit record | SIGN19774 | Expired | |
| 2011-05-12 | T11CM01452City permit record | COMBOTEMPORARY JOB TRAILER OFFICE W/ELECTRIC | Withdrwn | |
| 2011-01-25 | D11-0003City permit record | Development PackageCAR WASH 12TH & DREXEL ROADOriginal approval 4/5/111st revision (as-builts) 8/25/11 | Approved |
How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.
Code enforcement (4)
Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.
| Date | Record | What | Status |
|---|---|---|---|
| 2025-07-10 | CE-VIO0725-02926Code enforcement case | Refuse | Closed - unfounded |
| 2014-04-22 | T14DV02568Code enforcement case | Code enforcement case | Noverify |
| 2013-12-16 | T13DV09299Code enforcement case | Graffiti | Noverify |
| 2009-01-20 | T09DV00212Housing code violation | WORK WITHOUT PERMITS-COMMERCLNotice of violation issued · recorded before 2023 | COMPLIAN |
Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.
This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.
Planning work at this property?
Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
The permanent link and the summary above, sent once. No list.One email when a new permit, inspection result or code case appears on this parcel — nothing else, and you can stop any time. No list.
How this report was built
This is a reading of public records for parcel 13813001E — 22 permits on file from 2011 to 2022 (7 row, 4 sign, 3 combo, 2 sign - permanent) and 4 code enforcement cases — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-17; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.
The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).