Electrical permit history — 229 E Valencia Rd

229 E Valencia Rd, Tucson — built 1986, with 19 permits on record. Review electrical, HVAC and remodel history with links to official records.

Commercial property

229 E Valencia Rd

Built 1986 — 1980s commercial stock · last permitted panel/service work 2021 (finaled); a newer 2024 permit is issued

Parcel
13811073D
Built
1986 (assessor record)
Jurisdiction
Tucson
Zoning
C-2
Assessor use
Retail Strip Center
Parcel size
3.38 acres
Building area
35,460 sq ft (assessor record)
Sewer
No connection on file (sewer or septic status not confirmed by the record — verify on site)
Flood zone
X — minimal flood hazard (FEMA)
Historic preservation
Not on file (City of Tucson HP layers)
Service on record
City records show the 2021 permit was finalized; the permit description states “Removing an existing tenant electrical panel from an electrical service entrance. Adding a new tenant panel to an electrical service entrance. Electrical build out of a tenant suite.”.

See the property

County aerial photograph centered on 229 E Valencia Rd, parcel outlined

Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.

Is it time to upgrade?

  • Electrical service & distributionCurrentA newer 2024 permit for the same system is recorded as “Inspections” — The work was permitted, but final completion is not confirmed. The permit description states “Installing new 100 amp disconnect and new meter socket for future use. I pulled permit already for this but tep had meters mislabeled.”. Last permitted 2021 (5 years ago). City inspection record: OUTDOOR LIGHTING FINAL approved 2022-05-27. Contractor of record: EDG West Inc. Worth reading the permit itself: it names the service but does not read as an increase in capacity, so this may have been a like-for-like replacement rather than an upgrade. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service. T21CM09467 — Removing an existing tenant electrical panel from an electrical service entrance. Adding a new tenant panel to an electrical service entrance. Electrical build out of a tenant suite.
  • Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
  • Fire alarm & life safetyNot in this windowNothing in the permit records we read for this parcel that names this system. Any alarm or sprinkler work here predates this feed. For an occupied commercial building that is worth confirming from the panel and the inspection tags rather than assuming.
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Era-based check — high priority

    Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.

  • Era-based check

    NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.

Recorded sales (1)

Recorded transfers from the Pima County Assessor — 1 of 1
DatePriceType
2020-03-13$1,358,010Warranty Deed

Recorded sales are the sales the Pima County Assessor has on file from affidavits of property value — not every transfer, not listings, and not a valuation. Parties are never shown here. A sale with no permitted electrical work since is worth knowing before the next sale or a remodel.

Most recent permit on record for this parcel: 2024-11-29 (TC-COM-1124-02272) — Installing new 100 amp disconnect and new meter socket for future use. I pulled permit already for this but tep had meters mislabeled..

Permit history (19)

Permit history for this parcel — 8 of 19 records
DateRecordWhatStatusValue
2024-11-29expired 2025-07-09TC-COM-1124-02272City permit recordCommercial BuildingInstalling new 100 amp disconnect and new meter socket for future use. I pulled permit already for this but tep had meters mislabeled.Inspections
2024-11-06TC-FBB-1124-00196City permit recordNew construction*VOID: YL-Unable to process, this is the incorrect permit type. Please apply for a Commercial New building Permit, NOTE: Also requires a "Development Package" permit. In addition, all commercial construction plan sets must be prepared and stamped by a licensed registrant on all pages. This permit will be voided as it is not the correct permit type. For questions: Building_Official@tucsonaz.gov * -Hybrid Self-Storage Storage facility that combines permanent and mobile shipping containers for storage. Shipping containers to be placed above ground level.Void
2024-10-03TC-COM-1024-01917City permit recordCommercial BuildingInstall new 100 amp disconnect and new 3 phase 100 amp meter socket for future unitExpired
2024-09-19expired 2024-12-30TE-FPU-0924-00296City permit recordFloodplain UseThis is a City of Tucsonm Captial project to install water main within the public Right of Way. The Project No. is PRJ000303 - S 6th Ave - Proposition 101 Water ModificationsIssued
2024-09-10finaledTR-UTL-0924-01692City permit recordRight-of-Way (ROW) - Utility180 day= 2-90 Day permit request for City of Tucson PRJ000303. Water line replacementComplete
2022-12-15expired 2023-08-12TC-COM-1222-00306City permit recordCommercial BuildingRemove 100 amp disconnect. Install new 100 amp disconnect -This scope of work is like for likeIssued
2022-11-04TC-COM-1122-00047City permit recordTrade permitPlease submit as a commercial trade permit. Remove damaged 100 amp disconnect. Install new 100 amp fuses disconnectVoid
2022-01-11expired 2023-10-07T22CM00223City permit recordCommercial BuildingCollocation of antennas, ancillary equipment as per plans for a new carrier on an existing wirelessIssued
Show 11 older records
Permit history for this parcel — remaining 11 records
DateRecordWhatStatusValue
2021-12-13finaledT21CM09467City permit recordCOMBORemoving an existing tenant electrical panel from an electrical service entrance. Adding a new tenant panel to an electrical service entrance. Electrical build out of a tenant suite.Final
2021-11-16expired 2023-05-23T21CM08924City permit recordCommercial BuildingAdding a new tenant panel to an electrical service entrance. Electrical build out of a tenant suite.Expired
2021-08-11expired 2022-03-28T21CM06501City permit recordCommercial BuildingREPLACE DAMAGED DISCONNECT "LIKE FOR LIKE" 100 AMP 3 PHASE 240 VOLTExpired
2021-01-29finaledT21CM00925City permit recordCOMBOA spec tenant suite is being built out electrically and will be given a new tenant meter from an existing service to feed the suite.Final
2020-11-17expired 2021-05-16T20OT00771City permit recordFence / wall1-illum wall signExpired
2020-07-21expired 2021-05-19T20CM04601City permit recordResidential Building - One or Two FamilyADD 100 AMP 30 ELECTRIC METERExpired
2020-07-14expired 2021-05-19T20CM04415City permit recordCommercial BuildingINSTALL NEW 100 AMP 30 ELECTRIC METERExpired
2020-07-07expired 2021-05-19T20CM04271City permit recordAddition / alterationADDING ADDITIONAL METERExpired
2020-06-23expired 2021-05-19T20CM03905City permit recordCommercial BuildingADDING NEW METER AND SUBPANELExpired
2020-04-03expired 2020-09-30T20OT00296City permit recordFence / wall1-ILLUM WALL SIGNExpired
2005-10-31expired 2019-12-11D05-0040City permit recordDevelopment PackageTRS HOME FURNISHINGSExpired

How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.

Code enforcement (5)

Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.

Code enforcement history for this parcel — 5 of 5 records
DateRecordWhatStatus
2015-03-02T15DV01447Housing code violationSIGN VIOLATIONrecorded before 2023COMPLIAN
2015-02-06T15DV00761Housing code violationSIGN VIOLATIONrecorded before 2023COMPLIAN
2014-07-14T14DV04750Housing code violationSIGN VIOLATIONrecorded before 2023COMPLIAN
2014-07-14T14DV04749Housing code violationSIGN VIOLATIONrecorded before 2023COMPLIAN
2011-12-12T11DV09933Housing code violationMULTIPLE TYPESrecorded before 2023NOVERIFY

Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this report was built

This is a reading of public records for parcel 13811073D — 19 permits on file from 2005 to 2024 (8 commercial building, 2 combo, 2 fence / wall, 1 new construction) and 5 code enforcement cases — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.

The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).