Electrical permit history — 5775 S Oak Tree Dr
5775 S Oak Tree Dr, Tucson — built 2000, with 20 permits on record. Review electrical, HVAC and remodel history with links to official records.
Commercial property
5775 S Oak Tree Dr
Built 2000 — 2000s commercial stock · 20 permits on record; no permitted panel/service or HVAC work among them
Permanent link: Electrical permit history for 5775 S Oak Tree Dr (aztucsonelectricalsolutions.com/property/13727635b/5775-s-oak-tree-dr-tucson-az-85746) · Public records last checked 2026-08-16
- Parcel
- 13727635B
- Built
- 2000 (assessor record)
- Jurisdiction
- Tucson
- Zoning
- R-2
- Assessor use
- Municipal Police/Fire Department Facility
- Parcel size
- 4.74 acres
- Building area
- 6,025 sq ft (assessor record)
- Sewer
- No connection on file (sewer or septic status not confirmed by the record — verify on site)
- Flood zone
- X — minimal flood hazard (FEMA)
- Historic preservation
- Not on file (City of Tucson HP layers)
See the property
Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.
Is it time to upgrade?
- Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2022 fire construction permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
- Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2022 fire construction permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
- Fire alarm & life safetyCurrentLast permitted 2022 (4 years ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. T22FC00470 — Automatic Fire Extingshing Sys - INSTALLATION OF COMMERCIAL KITCHEN HOOD SUPPRESSION SYSTEM.; Commercial Cooking Suppression - New System: 1
- RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.
A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.
What that usually means electrically
- Era-based check
Gear in this age range is usually still supported but is due for infrared scanning and torque verification if that has not been done recently. The permit record does not confirm this; an on-site inspection is required.
- Era-based check
NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.
- Worth confirming
A pool or spa was permitted in 2022. Pool equipment brings its own bonding grid, GFCI requirements, and usually a subpanel — and the bonding rules have tightened since, so older installations are worth verifying.
- Worth confirming
Solar was permitted here in 2019. That means there is an existing interconnection, and the main breaker and busbar rating already carry a PV backfeed — so anything else you add (an EV charger, a heat pump) has to be checked against what is left under the 120% rule, not against the service size alone.
Most recent permit on record for this parcel: 2025-02-14 (TR-ROW-0225-00211) — Perform a total of 6 drilled borings (3, 5 feet deep; 3, 1 foot deep) along the existing W. Drexel Rd. right-of-way between Mission Road and Midvale Park Road.
Permit history (20)
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2025-02-14 | TR-ROW-0225-00211City permit record | Right-of-Way (ROW)Perform a total of 6 drilled borings (3, 5 feet deep; 3, 1 foot deep) along the existing W. Drexel Rd. right-of-way between Mission Road and Midvale Park Road | Void | |
| 2025-02-06finaled | TR-ROW-0225-00174City permit record | Right-of-Way (ROW)Perform a total of 6 drilled borings (3, 5 feet deep; 3, 1 foot deep) along the existing W. Drexel Rd. right-of-way between Mission Road and Midvale Park Road. | Complete | |
| 2023-11-21expired 2024-06-11 | TC-COM-1123-02705City permit record | Commercial BuildingReplacing a clarifier for Fire House 18. The bid price is to include getting area bluestaked prior to excavation. The bid includes getting the existing tank pumped and cleaned. The bid includes removing landscaping around the existing tank, digging up the area, removing the old tank and installing a new customer provided tank and test port. Once the new tank has been leveled, connected, and tested, the bid price includes backfilling with existing dirt, tamping and cleaning up landscaping. *Customer is to provide tank, test port, any fill dirt, crane work. *Bid does not include private utilities hard digging, fill dirt, unforeseen issues underground, any other plumbing other than the tank and test port connection. | Issued | |
| 2022-07-15finaled | T22FC00470City permit record | Fire ConstructionAutomatic Fire Extingshing Sys - INSTALLATION OF COMMERCIAL KITCHEN HOOD SUPPRESSION SYSTEM.; Commercial Cooking Suppression - New System: 1 | Complete | |
| 2022-06-29finaled | T22RW02359City permit record | Pool / spaSawcut 2'x20' for new driveway and patch back on Drexel Rd. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP. 08/05/2022 - PLAN CHANGE - R1 Add Atlantic Demolition ROC 214538 to the permit for widening the driveway as shown with the original plan | Final | |
| 2022-05-16expired 2023-06-06 | T22FC00345City permit record | Fire ConstructionAutomatic Fire Extingshing Sys - Installation of an Ansul Fire Suppression System for kitchen hood.; Commercial Cooking Suppression - New System: 1 | Expired | |
| 2022-05-12finaled | T22FC00338City permit record | Addition / alterationFire Alarm & Detection Systems - Install a new EST-Edwards non-voice fire alarm system at COT Fire Station #18 Install New TELGUARD (TEL TG7FS-V) Dual Path Cell and Verify Fire Alarm Monitoring signals.; Fire Alarm Systems - New Sq Ft: 4300; Fire Alarm Systems - # New Stories: 1; Fire Alarm Systems - Monitor Only; Additional Plan Reviews: 2 | Complete | |
| 2022-03-29finaled | T22FC00230City permit record | Fire ConstructionAutomatic Fire Extingshing Sys - Modify and add to existing fire sprinkler system to conform to new floor plan.; Commercial Fire Sprinkler Systems - Modification of heads: 69 | Complete |
Show 12 older records
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2022-02-15finaled | T22RW00523City permit record | Pool / spaPOTHOLE NEEDED TO COMPLETE LOCATE. 2 5X5 BELLHOLES IN DIRT FRONT / ASPHALT TO POTHOLE GAS LINE.@ 10LF. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. | Final | |
| 2021-12-14 | T21TUP0022City permit record | Zoning Permit AnnualTemp Job Trailer | Expired | |
| 2021-04-22expired 2024-05-19 | T21CM03395City permit record | Addition / alterationAddition & TI: FIre Station (TFD #18) | Issued | |
| 2020-12-23 | T20CM08975City permit record | COMBOInstalling three antennae, one radio and associated cabling on the existing wireless facility. | Withdrwn | |
| 2020-11-11expired 2021-06-22 | T20CM07962City permit record | Commercial BuildingREPL CELL TOWER ANTENNAS | Expired | |
| 2020-10-29expired 2026-05-29 | DP20-0224City permit record | Addition / alterationSITE - Addition to Fire Station 18, City of Tucson. | Issued | |
| 2019-06-18finaled | T19CM04332City permit record | Solar PVCANOPY MOUNTED SOLAR PV SYSTEM | Final | |
| 2019-06-14finaled | DP19-0151City permit record | Solar PVSITE - Tucson Fire Dept, solar, station 18, canopy PV system. | Complete | |
| 2009-02-12expired 2009-04-13 | T09EX00089City permit record | EXCAVRIGHT OF WAY IMPROVEMENTS | Closed | |
| 2008-10-09expired 2013-02-24 | T08CM03326City permit record | COMBONEIGHBORHOOD PARK RENOVATIONS R1: DEFERRED RAMADA SUBMITTAL | Expired | |
| 2005-04-29 | T05AN00475City permit record | ADDRNEW | Issued | |
| 1998-07-13 | D98-0052City permit record | Development PackageFIRE STATION 18 | Approved |
How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.
Code enforcement (5)
Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.
| Date | Record | What | Status |
|---|---|---|---|
| 2021-11-04 | T21DV07850Code enforcement case | Code enforcement case | Referred |
| 2021-10-23 | T21DV07461Code enforcement case | Code enforcement case | Complian |
| 2010-10-01finaled | T10FR02012Code enforcement case | Fire | Complete |
| 2009-09-23finaled | T09FR03100Code enforcement case | Code enforcement case | Complete |
| 2008-03-04 | T08DV01757Housing code violation | WEEDSrecorded before 2023 | REFERRED |
Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.
This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.
Planning work at this property?
Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
Send: the permanent link and the summary above, once. Watch: one email when a new permit, inspection result or code case appears on this parcel — nothing else, and you can stop any time. No list either way.
How this report was built
This is a reading of public records for parcel 13727635B — 20 permits on file from 1998 to 2025 (3 fire construction, 3 addition / alteration, 2 right-of-way (row), 2 commercial building) and 5 code enforcement cases — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.
The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).
Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.
