Electrical permit history — 4640 S Calle Santa Cruz

4640 S Calle Santa Cruz

  • Electrical service: no service or distribution permit on record for this 2023 building.
  • Watch for: built 2023; the live question is spare capacity for new loads, not the age of the gear.
  • Other work on record: addition or alteration permit 2026 (permit not closed), HVAC equipment permitted 2026 (permit not closed), pool or spa permitted 2024, and 45 more — see the records below.

From City of Tucson permits and the Pima County Assessor, checked 13 Nov 2026. Not an inspection.

I am a
Request a site visit

Is it time to upgrade?

Probably not: no service or distribution work is on record, which is normal for a building built in 2023.

  • Electrical service & distributionLooks currentNo service or distribution permit on record for this 2023 building. The live question is spare capacity for new loads (EV charging, kitchen or process equipment), not the age of the gear. Worth knowing: a 2023 fire automatic extinguishing system permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
  • Heating, cooling & mechanicalWorth checkingA 2026 permit covers this work, but the record shows no final inspection (official status: Inspections). The assessor records cooling as WARMED AND COOLED AIR and heating as Forced Air (assessor characteristics can lag permitted work). TC-COM-0326-00434 — Electrical inspection and evaluation regarding Code Enforcement case CE-VIO0326-01196. TFD-APT fire occurred in Unit 5306; the sprinkler system extinguished the fire and caused water damage that flooded rental Unit 5106 located below Units 5306 and 5206. Sovereign Electric and HVAC performed a limited electrical inspection of the unit as required by code enforcement. The electrical panel was found to be in satisfactory condition with no signs of water intrusion. We are requesting City clearance to re-energize the electrical panel in Unit 5106 so that a final operational power check can be completed and the unit can be returned to service.
  • Fire alarm & life safetyLooks currentA newer 2026 permit for the same system is recorded as “Inspections” — it is not closed. The permit description states “5306 | 4640 S CALLE SANTA CRUZ BLDG 5 UNIT 5306 TUCSON, AZ, 85714 | 855 Sq Ft. | $1500 Electrical Inspection regarding case: CE-VIO0326-01197, Accidental fire in kitchen #5306. Fire sprinkler system put the fire out and flooded rental unit #5306. We are only conducting the inspection of the electrical system as required by the aforementioned code enforcement that a Licensed Electrician is required to evaluate the electrical system to make sure it’s completely dried out. 5206 | 4640 S CALLE SANTA CRUZ BLDG 5 UNIT 5206 TUCSON, AZ, 85714 | 855 Sq Ft. | $1500 Electrical Inspection regarding case: CE-VIO0326-01197, TFD-APT fire in 5306. Sprinkler system put fire out and flooded rental unit 5206 located below rental unit 5306. We are only conducting the inspection of the electrical system as required by the aforementioned code enforcement that a Licensed Electrician is required to evaluate the electrical system to make sure it’s completely dried out. 5106 | 4640 S CALLE SANTA CRUZ BLDG 5 UNIT 5106 TUCSON, AZ, 85714 | 855 Sq Ft. | $1500 Electrical Inspection regarding case: CE-VIO0326-01197, TFD-APT fire in 5306. Sprinkler system put fire out and flooded rental unit 5106 located below rental unit 5306 and 5206. We are only conducting the inspection of the electrical system as required by the aforementioned code enforcement that a Licensed Electrician is required to evaluate the electrical system to make sure it’s completely dried out.”. Last permitted 2022 (4 years ago) — the permit passed final inspection. Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. TF-FCP-1122-00066 — Building D: #1 PROVIDE AND INSTALL THE REQUIRED DEDICATED SPRINKLER MONITORING SYSTEM FOR THE CONTINUED PROTECTION AT TUCSON LANDING APARTMENTS.
  • RoofLooks currentBuilt 2023; no permit on record since, which is normal for equipment this age. The assessor records the roof as Composition Shingle. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

What that usually means electrically

  • Worth confirming

    Multifamily property. House panels, unit meters, and common-area loads are usually metered and maintained separately — worth confirming which side of the meter a problem falls on before scheduling work.

  • Worth confirming

    A pool or spa was permitted in 2024. Pool equipment brings its own bonding grid, GFCI requirements, and usually a subpanel — and the bonding rules have tightened since, so older installations are worth verifying.

  • Era-based check

    A capacity and condition review is the usual starting point before any tenant improvement or added load.

  • Routine

    A trade permit was pulled in 2022. Trade permits cover electrical, plumbing, and mechanical work individually, so some permitted trade work has been done here since.

Solar and energy potential

Roof footprint
≈ 60,349 sq ft (assessor’s building area ÷ recorded stories — approximate)
Usable for solar, planning estimate
≈ 42,200 sq ft (~70% after setbacks, rooftop equipment and access paths)
Array that could fit
on the order of 460 kW — roughly 1,150 panels (low-tilt ballasted rows, 400 W class modules)
Estimated annual production
≈ 760,000 kWh (PVWatts, Tucson sun, low-tilt south)
Energy-charge offset at TEP commercial rates
Estimate $61,000–$99,000 a year (8–13¢/kWh energy + power-supply charges, by season and rate class)

The offset assumes the building uses the power as it is generated; TEP pays far less (its export rate is about 5¢/kWh) for surplus sent to the grid, so the load profile decides the real value. The 30% federal credit (§48E) still applies to commercial systems placed in service by the end of 2027 — projects that began construction by July 4, 2026 have longer; confirm timing with a tax adviser.

TEP grid capacityThis parcel is not inside any of the 11 areas TEP has mapped as saturated with distributed generation (the nearest, “Aviation Pkwy and Kino Pkwy”, is about 3.7 miles away — TEP’s map set, July 2020). New generation still goes through TEP’s interconnection screens, and a heavy new load still merits a utility capacity check — the maps only mark where that review is most likely to bite.

See the property

Satellite imagery © Google.

Flood and drainage

The federal flood map and the local one are not the same map, and they do not always agree. FEMA’s is the insurance map; the City of Tucson regulates against its own, and that is the one a permit here is judged against.

The record behind this read

Parcel
137056110
Year constructed
2023 (assessor record)
Permitting authority
Tucson
Zoning
PAD-29
Property type
Apartments 100+ Units 3 Or More Story
Building area
181,046 sq ft
Cooling
WARMED AND COOLED AIR
Heating
Forced Air
Electrical service
No service or distribution permit on record for this 2023 building. (the era estimate is from the year built, 2023 — not a measurement)

Building area, cooling and heating come from the Pima County Assessor’s file published 28 Jan 2026. Check any row against Pima County’s own parcel record ↗.

What this means for work here

The most recent permit with evidence of issuance is dated 2026. The work was permitted, but final completion is not confirmed. The permit covers only the work described in that record.

What that reading rests on. The issuing offices hold 48 building permits for this parcel dated between 2022 and 2026. 16 fire automatic extinguishing system permits, 11 new-construction permits, eight temporary certificate-of-occupancy (tco) permits and eight fire alarm system permits. 35 of them carry a final inspection; the other 13 were issued, expired or are still open, which is not the same as work completed. There are 3 code-enforcement cases recorded against the parcel, all of them closed. We do not reproduce complaint text — it routinely names people with no connection to the property.

Go straight to the records

Each link opens the issuing office’s own file for that record — dates, scope, status and inspections are theirs to publish, and they are all on the other side of these links.

Permit records courtesy of the City of Tucson — each link opens the City’s own file. The files are held by City of Tucson permit record (PRO) ↗ — search the parcel number 137056110.

See an error? Report a correction · About this data.

Utility and upgrade pathElectric service here is Tucson Electric Power (TEP). A service or panel upgrade needs a TEP meter release and has to meet TEP’s service requirements — meter height and location, clearances, and the point of attachment. See TEP new-service requirements and the TEP standards notes.

In the public record: All multifamily property · Commercial property in 85714 · Commercial & industrial reports · Homes in 85714 · Permit data by neighborhood

Planning multifamily electrical or metering work here?

Arizona Electrical Solutions — electrical, HVAC, underground, design-build and general contracting in Tucson (four Arizona ROC licenses). The address, parcel and this report travel with your request.

Request a site visit

Want a plain-English brief of this record first?

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this property compares nearby

Properties on S CALLE SANTA CRUZ hold 567 City permits on record, 524 of them since 2022.

Counts and years from the same public records.

Complete permit record (51 entries)

Every permit and case we hold for this parcel, newest first. Each number links to the official file.

YearNumberTypeStatus
2026TC-COM-0326-00380Commercial Addition/Alteration PermitInspections
2026TC-COM-0326-00434Commercial Addition/Alteration PermitInspections
2026TC-COM-0326-00435Commercial Addition/Alteration PermitInspections
2026CE-VIO0326-01198FireClosed - Resolved
2026CE-VIO0326-01197FireClosed - Resolved
2026CE-VIO0326-01196FireClosed - Resolved
2024T22CM01451Commercial New Building PermitComplete
2024T22CM01477Commercial New Building PermitComplete
2024T22CM01453Commercial New Building PermitComplete
2024T22CM01452Commercial New Building PermitComplete
2024T22CM01455Commercial New Building PermitComplete
2024TC-CFO-0624-00125Temporary Certificate-of-Occupancy (TCO)Issued
2024TC-CFO-0624-00124Temporary Certificate-of-Occupancy (TCO)Issued
2024T22CM01454Commercial New Building PermitComplete
2024TC-CFO-0224-00047Temporary Certificate-of-Occupancy (TCO)Issued
2024TC-CFO-0124-00038Temporary Certificate-of-Occupancy (TCO)Issued
2024T22CM01449Commercial New Building PermitComplete
2024T22CM01450Commercial New Building PermitComplete
2023TC-CFO-1223-00231Temporary Certificate-of-Occupancy (TCO)Complete
2023TC-CFO-1223-00241Temporary Certificate-of-Occupancy (TCO)Complete
2023TC-CFO-1223-00234Temporary Certificate-of-Occupancy (TCO)Issued
2023T22CM01459Commercial New Building PermitComplete
2023TC-CFO-1123-00230Temporary Certificate-of-Occupancy (TCO)Complete
2023TF-FCP-0323-00509Fire Automatic Extinguishing System PermitComplete
2023TF-FCP-0323-00506Fire Automatic Extinguishing System PermitComplete
2023TF-FCP-0323-00508Fire Automatic Extinguishing System PermitComplete
2023TF-FCP-0323-00502Fire Automatic Extinguishing System PermitComplete
2023TF-FCP-0323-00507Fire Automatic Extinguishing System PermitComplete
2023TF-FCP-0323-00503Fire Automatic Extinguishing System PermitComplete
2023TF-FCP-0323-00505Fire Automatic Extinguishing System PermitComplete
2023TF-FCP-0323-00504Fire Automatic Extinguishing System PermitComplete
2023TF-FCP-0123-00312Fire Automatic Extinguishing System PermitComplete
2023TF-FCP-0123-00307Fire Automatic Extinguishing System PermitComplete
2023TF-FCP-0123-00311Fire Automatic Extinguishing System PermitComplete
2023TF-FCP-0123-00313Fire Automatic Extinguishing System PermitExpired
2023TF-FCP-0123-00310Fire Automatic Extinguishing System PermitComplete
2023TF-FCP-0123-00309Fire Automatic Extinguishing System PermitComplete
2023TF-FCP-0123-00308Fire Automatic Extinguishing System PermitComplete
2023TF-FCP-0123-00306Fire Automatic Extinguishing System PermitComplete
2022TF-FCP-1122-00069Fire Alarm System PermitExpired
2022TF-FCP-1122-00066Fire Alarm System PermitComplete
2022TF-FCP-1122-00064Fire Alarm System PermitExpired
2022TF-FCP-1122-00065Fire Alarm System PermitComplete
2022TF-FCP-1122-00067Fire Alarm System PermitExpired
2022TF-FCP-1122-00068Fire Alarm System PermitComplete
2022TF-FCP-1122-00063Fire Alarm System PermitComplete
2022TF-FCP-1122-00062Fire Alarm System PermitExpired
2022T22CM07779Commercial Trade PermitComplete
2022T22CM01478Commercial New Building PermitComplete
2022T22CM01479Commercial New Building PermitComplete
2022DP22-0033Development PackageComplete

How this report was built

This is a reading of public records for parcel 137056110 — 48 City permits on file from 2022 to 2026 and 3 code enforcement cases — assembled from the Pima County parcel file and the City of Tucson’s published permit layers together with the City’s own migrated permit archive. City of Tucson permit records go back to the mid-1990s, with fewer before 2006, when the City’s older paper files were only partly digitized. The construction year, living area, cooling, heating, roof and walls on this page come from our saved copy of the Assessor’s own published data file (dated 28 Jan 2026). The sewer connection file and the flood map were not read for this snapshot. A permit that is absent here may predate the digitized record or sit in a system this snapshot did not read. This record was built 22 Aug 2026 and compared against the City’s 13 Nov 2026 permit export, with no change for this parcel.

What this report is and is not. This is a screening report written by Arizona Electrical Solutions from public records — the year the building went up, how it is classified and what has been permitted. It is not an inspection, an appraisal, a floodplain determination, or engineering, legal or purchasing advice, and nothing in it confirms what is installed at this address: a permit shows what was permitted, a missing permit does not mean nothing was done, and era notes describe what was common when the building went up, not what is in this one. Price figures are estimates, not quotes. The issuing agency’s own record is the official one and controls over anything summarized here — every permit links to it. Only someone looking at the panel can confirm the service size, the panel brand or the wiring.

Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.