Electrical permit history — 4755 S Calle Santa Cruz
4755 S Calle Santa Cruz
- Electrical service: no service or distribution permit on record for this 2018 building.
- Watch for: built 2018; the live question is spare capacity for new loads, not the age of the gear.
- Other work on record: fire automatic extinguishing system permit 2024, permanent sign permit 2024 (permit not closed), addition or alteration permit 2024, and 12 more — see the records below.
From City of Tucson permits and the Pima County Assessor, checked 13 Nov 2026. Not an inspection.
The permanent link and the summary above, sent once. No list.One email when a new permit, inspection result or code case appears on this parcel — nothing else, and you can stop any time. No list.
Is it time to upgrade?
Probably not: no service or distribution work is on record, which is normal for a building built in 2018.
- Electrical service & distributionLooks currentNo service or distribution permit on record for this 2018 building. The live question is spare capacity for new loads (EV charging, kitchen or process equipment), not the age of the gear. Worth knowing: a 2024 fire automatic extinguishing system permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
- Heating, cooling & mechanicalLooks currentBuilt 2018; no permit on record since, which is normal for equipment this age. Worth knowing: a 2024 fire automatic extinguishing system permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
- Fire alarm & life safetyLooks currentLast permitted 2018 (8 years ago) — the permit passed final inspection. Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. T18FC00770 — TI to Existing System
- RoofLooks currentBuilt 2018; no permit on record since, which is normal for equipment this age. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.
What that usually means electrically
- Era-based check
A capacity and condition review is the usual starting point before any tenant improvement or added load.
- Routine
A trade permit was pulled in 2021. Trade permits cover electrical, plumbing, and mechanical work individually, so some permitted trade work has been done here since.
Solar and energy potential
- Roof footprint
- ≈ 25,032 sq ft (assessor’s building area ÷ recorded stories — approximate)
- Usable for solar, planning estimate
- ≈ 17,500 sq ft (~70% after setbacks, rooftop equipment and access paths)
- Array that could fit
- on the order of 195 kW — roughly 490 panels (low-tilt ballasted rows, 400 W class modules)
- Estimated annual production
- ≈ 320,000 kWh (PVWatts, Tucson sun, low-tilt south)
- Energy-charge offset at TEP commercial rates
- Estimate $26,000–$42,000 a year (8–13¢/kWh energy + power-supply charges, by season and rate class)
The offset assumes the building uses the power as it is generated; TEP pays far less (its export rate is about 5¢/kWh) for surplus sent to the grid, so the load profile decides the real value. The 30% federal credit (§48E) still applies to commercial systems placed in service by the end of 2027 — projects that began construction by July 4, 2026 have longer; confirm timing with a tax adviser.
TEP grid capacityThis parcel is not inside any of the 11 areas TEP has mapped as saturated with distributed generation (the nearest, “Aviation Pkwy and Kino Pkwy”, is about 3.9 miles away — TEP’s map set, July 2020). New generation still goes through TEP’s interconnection screens, and a heavy new load still merits a utility capacity check — the maps only mark where that review is most likely to bite.
Flood and drainage
The federal flood map and the local one are not the same map, and they do not always agree. FEMA’s is the insurance map; the City of Tucson regulates against its own, and that is the one a permit here is judged against.
- FEMA: we did not read the federal flood map for this snapshot. Check FEMA’s flood map for this address ↗
- Local floodplain (the City of Tucson): local floodplain mapping is not reproduced here. A property can sit outside FEMA’s zone and still be inside a locally regulated floodplain, floodway, sheet-flooding area or erosion hazard setback, so check the authority’s own map before planning work. Pima County RFCD flood hazard map for parcel 137055590 ↗ · the City of Tucson ↗
The record behind this read
- Parcel
- 137055590
- Year constructed
- 2018 (assessor record)
- Permitting authority
- Tucson
- Zoning
- PAD-29
- Property type
- Neighborhood Shopping Center
- Building area
- 25,032 sq ft
- Electrical service
- No service or distribution permit on record for this 2018 building. (the era estimate is from the year built, 2018 — not a measurement)
Building area comes from the Pima County Assessor’s file published 28 Jan 2026. Check any row against Pima County’s own parcel record ↗.
What this means for work here
The most recent permit with evidence of issuance is dated 2024. City records show the permit was finalized. The permit covers only the work described in that record.
What that reading rests on. The issuing offices hold 16 building permits for this parcel dated between 2018 and 2024. Four fire automatic extinguishing system permits, three trade permits, two permanent sign permits and two addition or alteration permits. 14 of them carry a final inspection; the other 2 were issued, expired or are still open, which is not the same as work completed.
Go straight to the records
Each link opens the issuing office’s own file for that record — dates, scope, status and inspections are theirs to publish, and they are all on the other side of these links.
City permit record (15): 2024 TF-FCP-1124-00979 · 2024 TC-COM-0724-01327 · 2021 T21CM09604 · 2021 T21SA00197 · 2020 T20SA00119 · 2018 T18FC00770 · 2018 T18FC00777 · 2018 T18CM05173 · 2018 T18FC00701 · 2018 T18FC00661 · 2018 T18OT00881 · 2018 T18FC00614 · 2018 T18CM02676 · 2018 T18CM01093 · 2018 T18CM01094
Sign (1): 2024 TS-PRM-0924-00390
Permit records courtesy of the City of Tucson — each link opens the City’s own file. The files are held by City of Tucson permit record (PRO) ↗ — search the parcel number 137055590.
See an error? Report a correction · About this data.
Utility and upgrade pathElectric service here is Tucson Electric Power (TEP). A service or panel upgrade needs a TEP meter release and has to meet TEP’s service requirements — meter height and location, clearances, and the point of attachment. See TEP new-service requirements and the TEP standards notes.
In the public record: All commercial property · Commercial property in 85714 · Commercial & industrial reports · Homes in 85714 · Permit data by neighborhood
Planning a tenant improvement here?
Arizona Electrical Solutions — electrical, HVAC, underground, design-build and general contracting in Tucson (four Arizona ROC licenses). The address, parcel and this report travel with your request.
Want a plain-English brief of this record first?
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
Permanent link: Electrical permit history for 4755 S Calle Santa Cruz (aztucsonelectricalsolutions.com/property/137055590/4755-s-calle-santa-cruz-tucson-az-85714)
Electrical summary — 4755 S Calle Santa Cruz, Tucson, AZ 85714
Parcel 137055590Year built 2018Building area 25,032 sq ftPermit history City of TucsonRecord checked 13 Nov 2026
- Electrical service: no service or distribution permit on record for this 2018 building.
- Watch for: built 2018; the live question is spare capacity for new loads, not the age of the gear.
- Other work on record: fire automatic extinguishing system permit 2024, permanent sign permit 2024 (permit not closed), addition or alteration permit 2024, and 12 more — see the records below.
Permits on record, newest first
| Date | Permit | Type | Status |
|---|---|---|---|
| Dec 2024 | TF-FCP-1124-00979 | Fire automatic extinguishing system permit | Final |
| Dec 2024 | TS-PRM-0924-00390 | Permanent sign permit | Open |
| Sep 2024 | TC-COM-0724-01327 | Addition or alteration permit | Final |
| Dec 2021 | T21CM09604 | Trade permit | Final |
| May 2021 | T21SA00197 | Zoning compliance permit | Final |
| Apr 2020 | T20SA00119 | Zoning compliance permit | Final |
| Nov 2018 | T18FC00770 | Fire alarm system permit | Final |
| Sep 2018 | T18FC00777 | Fire automatic extinguishing system permit | Final |
and 7 more at the live report.
Voided or withdrawn permit records: 1 (not listed).
Ask your inspector or engineer to check
- The main switchboard’s nameplate rating and the age and make of the distribution gear.
- Whether the arc-flash labels match the installed gear (NFPA 70E reviews them every five years).
Live report: https://www.aztucsonelectricalsolutions.com/property/137055590/4755-s-calle-santa-cruz-tucson-az-85714
How this property compares nearby
Properties on S CALLE SANTA CRUZ hold 567 City permits on record, 524 of them since 2022.
Counts and years from the same public records.
How this report was built
This is a reading of public records for parcel 137055590 — 16 City permits on file from 2018 to 2024 — assembled from the Pima County parcel file and the City of Tucson’s published permit layers together with the City’s own migrated permit archive. City of Tucson permit records go back to the mid-1990s, with fewer before 2006, when the City’s older paper files were only partly digitized. The construction year and living area on this page come from our saved copy of the Assessor’s own published data file (dated 28 Jan 2026). The sewer connection file and the flood map were not read for this snapshot. A permit that is absent here may predate the digitized record or sit in a system this snapshot did not read. This record was built 22 Aug 2026 and compared against the City’s 13 Nov 2026 permit export, with no change for this parcel.
What this report is and is not. This is a screening report written by Arizona Electrical Solutions from public records — the year the building went up, how it is classified and what has been permitted. It is not an inspection, an appraisal, a floodplain determination, or engineering, legal or purchasing advice, and nothing in it confirms what is installed at this address: a permit shows what was permitted, a missing permit does not mean nothing was done, and era notes describe what was common when the building went up, not what is in this one. Price figures are estimates, not quotes. The issuing agency’s own record is the official one and controls over anything summarized here — every permit links to it. Only someone looking at the panel can confirm the service size, the panel brand or the wiring.
Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).