Electrical permit history — 5315 S Calle Santa Cruz

5315 S Calle Santa Cruz

  • Electrical service: no service or distribution permit on record for this 2009 building.
  • Watch for: built 2009; the live question is spare capacity for new loads, not the age of the gear.
  • Other work on record: fire automatic extinguishing system permit 2024, fire automatic extinguishing system permit 2023, trade permit 2023 (permit not closed), and 60 more — see the records below.

From City of Tucson permits and the Pima County Assessor, checked 13 Nov 2026. Not an inspection.

I am a
Request a site visit

Is it time to upgrade?

Probably not: no service or distribution work is on record, which is normal for a building built in 2009.

  • Electrical service & distributionLooks currentNo service or distribution permit on record for this 2009 building. The live question is spare capacity for new loads (EV charging, kitchen or process equipment), not the age of the gear. Worth knowing: a 2024 fire automatic extinguishing system permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
  • Heating, cooling & mechanicalWorth checkingNo permit on record names this system. Worth knowing: a 2024 fire automatic extinguishing system permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
  • Fire alarm & life safetyLooks currentLast permitted 2021 (5 years ago) — the permit passed final inspection. Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. T21FC00883 — Fire sprinkler installation and modification.
  • RoofWorth checkingNo permit on record names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

What that usually means electrically

  • Worth confirming

    Food service carries heavy, cycling kitchen loads and exhaust interlocks. Capacity and existing panel space are the first things to verify on any remodel.

  • Worth confirming

    There is an electrical reconnect permit from 2013. The service was disconnected at some point and brought back — usually after a vacancy, a utility disconnect, or work that required the power off. Worth knowing what prompted it.

  • Routine

    A trade permit was pulled in 2019. Trade permits cover electrical, plumbing, and mechanical work individually, so some permitted trade work has been done here since.

Solar and energy potential

Roof footprint
≈ 7,477 sq ft (county building-footprint layer)
Usable for solar, planning estimate
≈ 5,200 sq ft (~70% after setbacks, rooftop equipment and access paths)
Array that could fit
on the order of 60 kW — roughly 150 panels (low-tilt ballasted rows, 400 W class modules)
Estimated annual production
≈ 99,000 kWh (PVWatts, Tucson sun, low-tilt south)
Energy-charge offset at TEP commercial rates
Estimate $8,000–$13,000 a year (8–13¢/kWh energy + power-supply charges, by season and rate class)

The offset assumes the building uses the power as it is generated; TEP pays far less (its export rate is about 5¢/kWh) for surplus sent to the grid, so the load profile decides the real value. The 30% federal credit (§48E) still applies to commercial systems placed in service by the end of 2027 — projects that began construction by July 4, 2026 have longer; confirm timing with a tax adviser.

TEP grid capacityThis parcel is not inside any of the 11 areas TEP has mapped as saturated with distributed generation (the nearest, “Aviation Pkwy and Kino Pkwy”, is about 4.5 miles away — TEP’s map set, July 2020). New generation still goes through TEP’s interconnection screens, and a heavy new load still merits a utility capacity check — the maps only mark where that review is most likely to bite.

See the property

Satellite imagery © Google.

Flood and drainage

The federal flood map and the local one are not the same map, and they do not always agree. FEMA’s is the insurance map; the City of Tucson regulates against its own, and that is the one a permit here is judged against.

The record behind this read

Parcel
137055300
Year constructed
2009 (assessor record)
Permitting authority
Tucson
Zoning
C-3
Property type
Power Center - Restaurant
Building area
7,216 sq ft
Electrical service
No service or distribution permit on record for this 2009 building. (the era estimate is from the year built, 2009 — not a measurement)

Building area comes from the Pima County Assessor’s file published 28 Jan 2026. Check any row against Pima County’s own parcel record ↗.

What this means for work here

The most recent permit with evidence of issuance is dated 2024. City records show the permit was finalized. The permit covers only the work described in that record.

What that reading rests on. The issuing offices hold 76 building permits for this parcel dated between 2007 and 2025. 19 permanent sign permits, 19 addition or alteration permits, 12 fire automatic extinguishing system permits and 12 trade permits. 60 of them carry a final inspection; the other 16 were issued, expired or are still open, which is not the same as work completed.

Go straight to the records

Each link opens the issuing office’s own file for that record — dates, scope, status and inspections are theirs to publish, and they are all on the other side of these links.

Permit records courtesy of the City of Tucson — each link opens the City’s own file. The files are held by City of Tucson permit record (PRO) ↗ — search the parcel number 137055300.

See an error? Report a correction · About this data.

Utility and upgrade pathElectric service here is Tucson Electric Power (TEP). A service or panel upgrade needs a TEP meter release and has to meet TEP’s service requirements — meter height and location, clearances, and the point of attachment. See TEP new-service requirements and the TEP standards notes.

In the public record: All commercial property · Commercial property in 85706 · Commercial & industrial reports · Homes in 85706 · Permit data by neighborhood

Planning work at this property?

Arizona Electrical Solutions — electrical, HVAC, underground, design-build and general contracting in Tucson (four Arizona ROC licenses). The address, parcel and this report travel with your request.

Request a site visit

Want a plain-English brief of this record first?

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this property compares nearby

Properties on S CALLE SANTA CRUZ hold 629 City permits on record, 103 of them since 2022.

Counts and years from the same public records.

Complete permit record (76 entries)

Every permit and case we hold for this parcel, newest first. Each number links to the official file.

YearNumberTypeStatus
2025TS-PRM-0125-00035Permanent Sign PermitApproved
2024TF-FCP-0424-00265Fire Automatic Extinguishing System PermitComplete
2023TF-FCP-0223-00418Fire Automatic Extinguishing System PermitComplete
2023TC-COM-0323-00795Commercial Trade PermitIssued
2022T22SA00058Zoning ComplianceComplete
2021T21FC00883Fire Automatic Extinguishing System PermitComplete
2021T18FO00263Fire Code AppealComplete
2021T21CM05877Commercial Addition/Alteration PermitExpired
2020T20FC00596Fire Automatic Extinguishing System PermitComplete
2020T19CM07854Commercial Addition/Alteration PermitComplete
2020T20OT00350Permanent Sign PermitComplete
2019T19CM09068Commercial Trade PermitComplete
2019T19SA00487Zoning ComplianceComplete
2019T19SA00071Zoning ComplianceComplete
2018T18FC00807Fire Alarm System PermitExpired
2018T18FC00028Fire Alarm System PermitComplete
2018T17FO01000General Operational Fire PermitComplete
2017T17CM04506Commercial Trade PermitCanceled
2017T17FC00064Fire Automatic Extinguishing System PermitCanceled
2015T15BU01371Fire Automatic Extinguishing System PermitComplete
2015T15OT01247Permanent Sign PermitCanceled
2015T15OT01081Permanent Sign PermitCanceled
2015T15CM05760Commercial Addition/Alteration PermitComplete
2015T15CM03202Commercial Trade PermitComplete
2015T15OT00266Permanent Sign PermitCanceled
2014T14BU00627Commercial Trade PermitCanceled
2014T14SA00074Zoning ComplianceComplete
2013T13BU01005Commercial Trade PermitComplete
2013T13CM01730Commercial Trade PermitComplete
2013T12OT01623Permanent Sign PermitCanceled
2012T11CM03076Commercial Addition/Alteration PermitComplete
2012T11OT02339Permanent Sign PermitComplete
2011T11OT02162Permanent Sign PermitCanceled
2011T11OT01947Permanent Sign PermitCanceled
2011T11CM03183Commercial Addition/Alteration PermitComplete
2011T11EL02220Commercial Trade PermitComplete
2011T11OT00398Permanent Sign PermitComplete
2011T11EL00548Commercial Trade PermitComplete
2010T10OT02257Permanent Sign PermitComplete
2010T10OT01876Annual Portable Sign ComplianceComplete
2010T10CM02198Commercial Addition/Alteration PermitComplete
2009T09BU00651Commercial Trade PermitComplete
2009T09OT00949Permanent Sign PermitComplete
2009T09OT01069Permanent Sign PermitComplete
2009T09BU00664Commercial Trade PermitComplete
2009T09OT00947Annual Portable Sign ComplianceComplete
2009T09CM00745Commercial Addition/Alteration PermitComplete
2009T09BU00478Fire Automatic Extinguishing System PermitComplete
2009T09BU00386Fire Automatic Extinguishing System PermitComplete
2009T09CM00484Commercial Trade PermitCanceled
2009T09OT00136Permanent Sign PermitComplete
2009T08CM01385Commercial New Building PermitComplete
2009T09OT00094Annual Portable Sign ComplianceComplete
2009T09OT00095Permanent Sign PermitCanceled
2008T08OT02628Permanent Sign PermitComplete
2008T08BU02083Fire Automatic Extinguishing System PermitComplete
2008T08OT02624Annual Portable Sign ComplianceCanceled
2008T08CM03508Commercial Addition/Alteration PermitComplete
2008T08BU01565Fire Automatic Extinguishing System PermitComplete
2008T08CM01781Commercial Addition/Alteration PermitComplete
2008T08OT01639Permanent Sign PermitComplete
2008T08CM01769Commercial Addition/Alteration PermitComplete
2008T08OT01456Permanent Sign PermitComplete
2008T08BU01072Fire Automatic Extinguishing System PermitComplete
2008T08OT01271Permanent Sign PermitComplete
2008T08CM00171Commercial Addition/Alteration PermitComplete
2007T07BU02163Fire Automatic Extinguishing System PermitComplete
2007T06CM04330Commercial New Building PermitComplete
2007T06CM06177Commercial Addition/Alteration PermitComplete
2007T06CM06180Commercial Addition/Alteration PermitComplete
2007T06CM06184Commercial Addition/Alteration PermitComplete
2007T06CM06178Commercial Addition/Alteration PermitComplete
2007T06CM06179Commercial Addition/Alteration PermitComplete
2007T06CM06181Commercial Addition/Alteration PermitComplete
2007T06CM06182Commercial Addition/Alteration PermitComplete
2007T06CM06183Commercial Addition/Alteration PermitComplete

How this report was built

This is a reading of public records for parcel 137055300 — 76 City permits on file from 2007 to 2025 — assembled from the Pima County parcel file and the City of Tucson’s published permit layers together with the City’s own migrated permit archive. City of Tucson permit records go back to the mid-1990s, with fewer before 2006, when the City’s older paper files were only partly digitized. The construction year and living area on this page come from our saved copy of the Assessor’s own published data file (dated 28 Jan 2026). The sewer connection file and the flood map were not read for this snapshot. A permit that is absent here may predate the digitized record or sit in a system this snapshot did not read. This record was built 22 Sep 2026 and compared against the City’s 13 Nov 2026 permit export, with no change for this parcel.

What this report is and is not. This is a screening report written by Arizona Electrical Solutions from public records — the year the building went up, how it is classified and what has been permitted. It is not an inspection, an appraisal, a floodplain determination, or engineering, legal or purchasing advice, and nothing in it confirms what is installed at this address: a permit shows what was permitted, a missing permit does not mean nothing was done, and era notes describe what was common when the building went up, not what is in this one. Price figures are estimates, not quotes. The issuing agency’s own record is the official one and controls over anything summarized here — every permit links to it. Only someone looking at the panel can confirm the service size, the panel brand or the wiring.

Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).