Electrical permit history — 5225 S Calle Santa Cruz
5225 S Calle Santa Cruz
- Electrical service: no service or distribution permit on record for this 2008 building.
- Watch for: built 2008; the live question is spare capacity for new loads, not the age of the gear.
- Other work on record: permanent sign permit 2026 (permit not closed), zoning compliance permit 2025, fire automatic extinguishing system permit 2023, and 27 more — see the records below.
From City of Tucson permits and the Pima County Assessor, checked 13 Nov 2026. Not an inspection.
The permanent link and the summary above, sent once. No list.One email when a new permit, inspection result or code case appears on this parcel — nothing else, and you can stop any time. No list.
Is it time to upgrade?
Probably not: no service or distribution work is on record, which is normal for a building built in 2008.
- Electrical service & distributionLooks currentNo service or distribution permit on record for this 2008 building. The live question is spare capacity for new loads (EV charging, kitchen or process equipment), not the age of the gear. Worth knowing: a 2023 fire automatic extinguishing system permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
- Heating, cooling & mechanicalLooks currentLast permitted 2023 (3 years ago) — the permit passed final inspection. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. TC-COM-0523-01249 — Tenant Improvement: Convert existing Bed Bath & Beyond space to a Sportsman's Warehouse. Includes sales floor, offices, toilet rooms, and storage. Mezzanine for Storage. Exterior improvements include site improvements and painting the building. New roof top units.
- Fire alarm & life safetyLooks currentLast permitted 2023 (3 years ago) — the permit passed final inspection. Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. TF-FCP-0823-01013 — Modification to existing fire sprinkler system to accommodate new tenant
- RoofWorth checkingNo permit on record names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.
What that usually means electrically
- Worth confirming
A pool or spa was permitted in 2023. Pool equipment brings its own bonding grid, GFCI requirements, and usually a subpanel — and the bonding rules have tightened since, so older installations are worth verifying.
- Era-based check
A capacity and condition review is the usual starting point before any tenant improvement or added load.
Solar and energy potential
- Roof footprint
- ≈ 98,871 sq ft (assessor’s building area ÷ recorded stories — approximate)
- Usable for solar, planning estimate
- ≈ 69,200 sq ft (~70% after setbacks, rooftop equipment and access paths)
- Array that could fit
- on the order of 760 kW — roughly 1,900 panels (low-tilt ballasted rows, 400 W class modules)
- Estimated annual production
- ≈ 1,250,000 kWh (PVWatts, Tucson sun, low-tilt south)
- Energy-charge offset at TEP commercial rates
- Estimate $100,000–$163,000 a year (8–13¢/kWh energy + power-supply charges, by season and rate class)
The offset assumes the building uses the power as it is generated; TEP pays far less (its export rate is about 5¢/kWh) for surplus sent to the grid, so the load profile decides the real value. The 30% federal credit (§48E) still applies to commercial systems placed in service by the end of 2027 — projects that began construction by July 4, 2026 have longer; confirm timing with a tax adviser.
TEP grid capacityThis parcel is not inside any of the 11 areas TEP has mapped as saturated with distributed generation (the nearest, “Aviation Pkwy and Kino Pkwy”, is about 4.5 miles away — TEP’s map set, July 2020). New generation still goes through TEP’s interconnection screens, and a heavy new load still merits a utility capacity check — the maps only mark where that review is most likely to bite.
Flood and drainage
The federal flood map and the local one are not the same map, and they do not always agree. FEMA’s is the insurance map; the City of Tucson regulates against its own, and that is the one a permit here is judged against.
- FEMA: we did not read the federal flood map for this snapshot. Check FEMA’s flood map for this address ↗
- Local floodplain (the City of Tucson): local floodplain mapping is not reproduced here. A property can sit outside FEMA’s zone and still be inside a locally regulated floodplain, floodway, sheet-flooding area or erosion hazard setback, so check the authority’s own map before planning work. Pima County RFCD flood hazard map for parcel 137055290 ↗ · the City of Tucson ↗
The record behind this read
- Parcel
- 137055290
- Year constructed
- 2008 (assessor record)
- Permitting authority
- Tucson
- Zoning
- C-3
- Property type
- Power Center
- Building area
- 98,871 sq ft
- Electrical service
- No service or distribution permit on record for this 2008 building. (the era estimate is from the year built, 2008 — not a measurement)
Building area comes from the Pima County Assessor’s file published 28 Jan 2026. Check any row against Pima County’s own parcel record ↗.
What this means for work here
The most recent permit with evidence of issuance is dated 2026. The work was permitted, but final completion is not confirmed. The permit covers only the work described in that record.
What that reading rests on. The issuing offices hold 30 building permits for this parcel dated between 2007 and 2026. Seven permanent sign permits, seven addition or alteration permits, five fire automatic extinguishing system permits and four zoning compliance permits. 26 of them carry a final inspection; the other 4 were issued, expired or are still open, which is not the same as work completed.
Go straight to the records
Each link opens the issuing office’s own file for that record — dates, scope, status and inspections are theirs to publish, and they are all on the other side of these links.
Sign (3): 2026 TS-PRM-0926-00339 · 2026 TS-PRM-0626-00244 · 2023 TS-PRM-0723-00431
City permit record (26): 2025 TZ-CMP-1125-00202 · 2023 TF-FCP-0823-01013 · 2023 TF-FCP-0823-00994 · 2023 TZ-CMP-0823-00167 · 2022 T22CM07850 · 2020 T20FC00770 · 2020 T20FC00798 · 2020 T20OT00698 · 2020 T20FC00550 · 2020 T20CM03529 · 2020 T20CM02144 · 2019 T19SA00487 · 2019 T19SA00071 · 2008 T08OT01598 · 2008 T08BU00932 · 2008 T08CM01101 · 2008 T08BU00885 · 2008 T08CM00320 · 2008 T08OT00738 · 2008 T08BU00592 · 2008 T08OT00614 · 2008 T08OT00230 · 2008 T08BU00091 · 2007 T07BU02497 · 2007 T07CM01781 · 2007 T07CM00965
Certificate of occupancy (1): 2023 TC-COM-0523-01249
Permit records courtesy of the City of Tucson — each link opens the City’s own file. The files are held by City of Tucson permit record (PRO) ↗ — search the parcel number 137055290.
See an error? Report a correction · About this data.
Utility and upgrade pathElectric service here is Tucson Electric Power (TEP). A service or panel upgrade needs a TEP meter release and has to meet TEP’s service requirements — meter height and location, clearances, and the point of attachment. See TEP new-service requirements and the TEP standards notes.
In the public record: All commercial property · Commercial property in 85706 · Commercial & industrial reports · Homes in 85706 · Permit data by neighborhood
Planning a tenant improvement here?
Arizona Electrical Solutions — electrical, HVAC, underground, design-build and general contracting in Tucson (four Arizona ROC licenses). The address, parcel and this report travel with your request.
Want a plain-English brief of this record first?
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
Permanent link: Electrical permit history for 5225 S Calle Santa Cruz (aztucsonelectricalsolutions.com/property/137055290/5225-s-calle-santa-cruz-tucson-az-85706)
Electrical summary — 5225 S Calle Santa Cruz, Tucson, AZ 85706
Parcel 137055290Year built 2008Building area 98,871 sq ftPermit history City of TucsonRecord checked 13 Nov 2026
- Electrical service: no service or distribution permit on record for this 2008 building.
- Watch for: built 2008; the live question is spare capacity for new loads, not the age of the gear.
- Other work on record: permanent sign permit 2026 (permit not closed), zoning compliance permit 2025, fire automatic extinguishing system permit 2023, and 27 more — see the records below.
Permits on record, newest first
| Date | Permit | Type | Status |
|---|---|---|---|
| Oct 2026 | TS-PRM-0926-00339 | Permanent sign permit | Open |
| Jul 2026 | TS-PRM-0626-00244 | Permanent sign permit | Open |
| Nov 2025 | TZ-CMP-1125-00202 | Zoning compliance permit | Final |
| Sep 2023 | TF-FCP-0823-01013 | Fire automatic extinguishing system permit | Final |
| Aug 2023 | TF-FCP-0823-00994 | Fire alarm system permit | Final |
| Aug 2023 | TZ-CMP-0823-00167 | Zoning compliance permit | Final |
| Aug 2023 | TS-PRM-0723-00431 | Permanent sign permit | Final |
| Jul 2023 | TC-COM-0523-01249 | Heating & cooling | Final |
and 22 more at the live report.
Ask your inspector or engineer to check
- The main switchboard’s nameplate rating and the age and make of the distribution gear.
- Whether the arc-flash labels match the installed gear (NFPA 70E reviews them every five years).
Live report: https://www.aztucsonelectricalsolutions.com/property/137055290/5225-s-calle-santa-cruz-tucson-az-85706
How this property compares nearby
Properties on S CALLE SANTA CRUZ hold 629 City permits on record, 103 of them since 2022.
Counts and years from the same public records.
Complete permit record (30 entries)
Every permit and case we hold for this parcel, newest first. Each number links to the official file.
| Year | Number | Type | Status |
|---|---|---|---|
| 2026 | TS-PRM-0926-00339 | Permanent Sign Permit | Issued |
| 2026 | TS-PRM-0626-00244 | Permanent Sign Permit | Inspections |
| 2025 | TZ-CMP-1125-00202 | Zoning Compliance | Complete |
| 2023 | TF-FCP-0823-01013 | Fire Automatic Extinguishing System Permit | Complete |
| 2023 | TF-FCP-0823-00994 | Fire Alarm System Permit | Complete |
| 2023 | TZ-CMP-0823-00167 | Zoning Compliance | Complete |
| 2023 | TS-PRM-0723-00431 | Permanent Sign Permit | Complete |
| 2023 | TC-COM-0523-01249 | Commercial Addition/Alteration Permit | Complete |
| 2022 | T22CM07850 | Commercial Trade Permit | Expired |
| 2020 | T20FC00770 | Fire Alarm System Permit | Complete |
| 2020 | T20FC00798 | Fire Alarm System Permit | Complete |
| 2020 | T20OT00698 | Permanent Sign Permit | Complete |
| 2020 | T20FC00550 | Fire Automatic Extinguishing System Permit | Complete |
| 2020 | T20CM03529 | Commercial Addition/Alteration Permit | Complete |
| 2020 | T20CM02144 | Commercial Addition/Alteration Permit | Expired |
| 2019 | T19SA00487 | Zoning Compliance | Complete |
| 2019 | T19SA00071 | Zoning Compliance | Complete |
| 2008 | T08OT01598 | Annual Portable Sign Compliance | Complete |
| 2008 | T08BU00932 | Commercial Addition/Alteration Permit | Complete |
| 2008 | T08CM01101 | Commercial Addition/Alteration Permit | Complete |
| 2008 | T08BU00885 | Fire Automatic Extinguishing System Permit | Complete |
| 2008 | T08CM00320 | Commercial Addition/Alteration Permit | Complete |
| 2008 | T08OT00738 | Permanent Sign Permit | Complete |
| 2008 | T08BU00592 | Commercial Addition/Alteration Permit | Complete |
| 2008 | T08OT00614 | Permanent Sign Permit | Complete |
| 2008 | T08OT00230 | Permanent Sign Permit | Complete |
| 2008 | T08BU00091 | Fire Automatic Extinguishing System Permit | Complete |
| 2007 | T07BU02497 | Fire Automatic Extinguishing System Permit | Complete |
| 2007 | T07CM01781 | Commercial New Building Permit | Complete |
| 2007 | T07CM00965 | Commercial New Building Permit | Complete |
How this report was built
This is a reading of public records for parcel 137055290 — 30 City permits on file from 2007 to 2026 — assembled from the Pima County parcel file and the City of Tucson’s published permit layers together with the City’s own migrated permit archive. City of Tucson permit records go back to the mid-1990s, with fewer before 2006, when the City’s older paper files were only partly digitized. The construction year and living area on this page come from our saved copy of the Assessor’s own published data file (dated 28 Jan 2026). The sewer connection file and the flood map were not read for this snapshot. A permit that is absent here may predate the digitized record or sit in a system this snapshot did not read. This record was built 13 Nov 2026 from the City’s permit export of that day.
What this report is and is not. This is a screening report written by Arizona Electrical Solutions from public records — the year the building went up, how it is classified and what has been permitted. It is not an inspection, an appraisal, a floodplain determination, or engineering, legal or purchasing advice, and nothing in it confirms what is installed at this address: a permit shows what was permitted, a missing permit does not mean nothing was done, and era notes describe what was common when the building went up, not what is in this one. Price figures are estimates, not quotes. The issuing agency’s own record is the official one and controls over anything summarized here — every permit links to it. Only someone looking at the panel can confirm the service size, the panel brand or the wiring.
Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).
Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.
Permit history: City of Tucson addresses, back to the mid-1990s. Elsewhere in Pima County: property facts from the Assessor, no permit history yet.