Electrical permit history — 2002 S Cathy Av
2002 S Cathy Av, Tucson — built 1973, with 21 permits on record. Review electrical, HVAC and remodel history with links to official records.
Commercial property
2002 S Cathy Av
Built 1973 — 1970s commercial stock · last permitted panel/service work 2005 (finaled)
Permanent link: Electrical permit history for 2002 S Cathy Av (aztucsonelectricalsolutions.com/property/136074040/2002-s-cathy-av-tucson-az-85710) · Public records last checked 2026-08-16
- Parcel
- 136074040
- Built
- 1973 (county record)
- Jurisdiction
- Tucson
- Zoning
- R-1
- Assessor use
- Assisted Living Facility Licensed
- Parcel size
- 0.21 acres
- Sewer
- Connection on file (1973) (county sewer connection records)
- Flood zone
- X — minimal flood hazard (FEMA)
- Historic preservation
- Not on file (City of Tucson HP layers)
- Service on record
- City records show the 2005 permit was finalized; the permit description states “upgrade electric 150amp to 200amp” — an increase in capacity as described, not a confirmed installed rating.
See the property
Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.
Is it time to upgrade?
- Electrical service & distributionCurrentLast permitted 2005 (21 years ago). City inspection record: ELECTRIC - FINAL approved 2005-02-25. Contractor of record: RIDGEPOINT ELECTRIC *C. The permit describes an increase in capacity, which is the single best sign the electrical has actually been brought forward. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service. T05EL00345 — upgrade electric 150amp to 200amp
- Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2025 solar pv permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
- Fire alarm & life safetyCurrentLast permitted 2013 (13 years ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. T13BU00424 — FIRE SPRINKLER
- RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.
A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.
What that usually means electrically
- Era-based check — high priority
Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.
- Era-based check
NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.
- Worth confirming
Solar was permitted here in 2025. That means there is an existing interconnection, and the main breaker and busbar rating already carry a PV backfeed — so anything else you add (an EV charger, a heat pump) has to be checked against what is left under the 120% rule, not against the service size alone.
- Worth confirming
An ADU or casita was permitted in 2005, which means load has already been added to this property. Whether there is headroom left for anything more depends on how that was fed — a subpanel off the existing service, or its own.
Most recent permit on record for this parcel: 2026-07-28 (TF-FOP-0726-01003) — NEED TO RENEW MY PERMIT.
Permit history (21)
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2026-07-28 | TF-FOP-0726-01003City permit record | Fire OperationalNEED TO RENEW MY PERMIT | Fees paid | |
| 2026-07-22 | TF-FOP-0726-00984City permit record | Fire OperationalVOID - Submit a Fire State Licensed Facility Permit - I NEED TO RENEW MY EXPIRED FIRE PERMIT | Void | |
| 2026-05-29finaled | TC-RES-0526-02848City permit record | Residential Building - One or Two FamilyEMERGENCY GAS RECONNECT WITH MEDICAL NEEDS. GAS LINE EXTENSION DUE TO SWGAS METER RELOCATION PROJECT. | Complete | |
| 2025-09-21finaled | TC-RES-0925-04641City permit record | Solar PVREV_1, Sub Panel Substitution; SYSTEM SIZE: DC SIZE : 35 X 415W=14.53 kW DC AC SIZE : 1 X 11500W=11.50 kW AC (35) TALESUN TP7G54M (415W) SOLAR MODULES (1) TESLA POWERWALL 3 (MODEL NO- 1707000-XX-Y) (1) TESLA BACKUP SWITCH (MODEL NO -1624171-XX-Y) (1) 200A/225A BUS LOAD CNETER; PNW4264B1225C | Complete | |
| 2025-02-19finaled | TF-FOP-0225-00243City permit record | Fire OperationalAutumn House / R4 / 10 beds / ALF | Complete | |
| 2022-09-07finaled | T22FO00762City permit record | FIREOPER10 BEDS | Final | |
| 2021-06-03finaled | T21FO00323City permit record | FIREOPERAUTUMN HOUSE ASSISTED LIVING 10 BEDS | Final | |
| 2020-03-11finaled | T20FO00194City permit record | FIREOPERAUTUMN HOUSE ASST LIVING - OCC: 10 BEDS | Final |
Show 13 older records
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2017-03-07finaled | T17FO00193City permit record | FIREOPERAssisted Living - 10 beds | Final | |
| 2013-04-09finaled | T13BU00424City permit record | SPKLRFIRE SPRINKLER | Final | |
| 2013-03-19finaled | T13BU00323City permit record | SPKLRFIRE SPRINKLER | Final | |
| 2012-12-27finaled | T12CM08195City permit record | COMBOFIRE DAMAGE REPAIR ON GARAGE | Final | |
| 2012-12-27finaled | T12OT01712City permit record | FLOODPLNFUP - T12CM08195 FIRE DAMAGE REPAIR ON GARAGE | Final | |
| 2006-03-14finaled | T06BU00566City permit record | BUILDCHANGE TWO DOORS | Final | |
| 2005-11-10finaled | T05EL02266City permit record | ELECTELEC TO SPRINKLER SYSTEM | Final | |
| 2005-07-19finaled | T05CM03804City permit record | COMBOCHANGING AN ARIZONA ROOM INTO 2 BEDROOMS | Final | |
| 2005-06-23finaled | T05BU01610City permit record | SPKLRFIRE SPKR: 28 NEW | Final | |
| 2005-05-03finaled | T05OT01122City permit record | ADU / casitaC OF O: ADULT HOME | C of o | |
| 2005-02-16 | T05EL00341City permit record | ELECTUPGRADE:ELECTRIC INC TO 200 AMP | Void | |
| 2005-02-16finaled | T05EL00345City permit record | ELECTupgrade electric 150amp to 200amp | Final | |
| 2003-04-29expired 2003-10-29 | T03EL00811City permit record | ELECTUPGRADE:ELECTRIC 150AMP TO 200AMP (APA) | Closed |
How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.
Code enforcement (4)
Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.
| Date | Record | What | Status |
|---|---|---|---|
| 2018-06-05 | T18DV03235Code enforcement case | Code enforcement case | Noverify |
| 2012-10-16 | T12DV09670Code enforcement case | Fire | Complian |
| 2011-08-26 | T11DV06821Code enforcement case | Vegetation | Complian |
| 2011-03-16finaled | T11FR00636Code enforcement case | Fire | Complete |
Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.
This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel.
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
The permanent link and the summary above, once. No list, no follow-up unless you ask for it.
How this report was built
This is a reading of public records for parcel 136074040 — 21 permits on file from 2003 to 2026 (4 fireoper, 4 elect, 3 fire operational, 3 spklr) and 4 code enforcement cases — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.
The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).
Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.
