Electrical permit history — 530 S Pantano Rd
530 S Pantano Rd, Tucson — built 1981, with 38 permits on record. Review electrical, HVAC and remodel history with links to official records.
Commercial property
530 S Pantano Rd
Built 1981 — 1980s commercial stock · 38 permits on record; no permitted panel/service or HVAC work among them
Permanent link: Electrical permit history for 530 S Pantano Rd (aztucsonelectricalsolutions.com/property/13414014a/530-s-pantano-rd-tucson-az-85710) · Public records last checked 2026-08-17
- Parcel
- 13414014A
- Built
- 1981 (county record)
- Jurisdiction
- Tucson
- Zoning
- RX-1
- Assessor use
- Misc Commercial
- Parcel size
- 14.86 acres
- Building area
- 84,159 sq ft (assessor record)
- Sewer
- No connection on file (sewer or septic status not confirmed by the record — verify on site)
- Flood zone
- X — minimal flood hazard (FEMA)
- Historic preservation
- Not on file (City of Tucson HP layers)
See the property
Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.
Is it time to upgrade?
- Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2026 fire construction permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
- Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2026 fire construction permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
- Fire alarm & life safetyCurrentLast permitted this year (2026). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. TF-FCP-0526-00317 — change 15 pendents to uprights at new stage ceiling
- RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.
A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.
What that usually means electrically
- Era-based check — high priority
Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.
- Era-based check
NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.
- Worth confirming
Solar was permitted here in 2013. That means there is an existing interconnection, and the main breaker and busbar rating already carry a PV backfeed — so anything else you add (an EV charger, a heat pump) has to be checked against what is left under the 120% rule, not against the service size alone.
Most recent permit on record for this parcel: 2026-05-12 (TF-FCP-0526-00317) — change 15 pendents to uprights at new stage ceiling.
Permit history (38)
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2026-05-12finaled | TF-FCP-0526-00317City permit record | Fire Constructionchange 15 pendents to uprights at new stage ceiling | Inspections complete | |
| 2026-05-04finaled | TF-FOP-0526-00575City permit record | Fire OperationalSLF E Occupancy with 16 classrooms | Complete | |
| 2025-09-30expires 2027-08-03 | TC-COM-0925-01784City permit record | Pool / spaRenovation of existing sanctuary, new seating, finishes, av equipment, and new sound booth. Along with a future broadcasting space. REV1: Updated all electrical sheets. | Inspections | |
| 2024-09-17finaled | TF-FOP-0924-01060City permit record | Fire OperationalChrist Community Church/Family Life Academy 9 classrooms | Complete | |
| 2024-09-16finaled | TF-FOP-0924-01059City permit record | Fire OperationalSchool E | Complete | |
| 2024-06-27 | TF-FOP-0624-00751City permit record | Fire OperationalVOID-Submit a Fire State Licensed Facility Permit - Need an inspection to renew our permit for state-licensed child care center. | Void | |
| 2022-07-19finaled | T22FO00628City permit record | FIREOPER200 PEOPLE | Final | |
| 2021-04-29finaled | T21FO00258City permit record | FIREOPERCHRIST COMMUNITY CHURCH FAMILY LIFE ACADEMY 200 PERSONS | Final |
Show 30 older records
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2021-04-13finaled | T21RW01735City permit record | ROWTEP REPLACED HIT/DAMAGED POLE WO 6346431. CREW WORKED FROM PARKING LOT. EMERGENCY - AFTER THE FACT | Final | |
| 2020-10-09 | DP20-0206City permit record | Development PackageSite/Grading/Floodplain - Christ Community Church of Tucson, redevelopment. | Approved | |
| 2020-01-09finaled | T20CM00203City permit record | COMBOTI CHURCH | Final | |
| 2019-10-09finaled | T19FO00841City permit record | FIREOPERFamily Life Academy - OCC: 240 | Final | |
| 2019-10-08expired 2020-04-27 | T19FC00829City permit record | Fire ConstructionFire Alarm & Detection Systems - T.I install strobes in renovated restrooms and smoke detectors in the classrooms-connect to existing facp; Fire Alarm Systems - Devices Modified: 12 | Expired | |
| 2019-07-12finaled | T19RW03922City permit record | ROWStarting on the South West side of E Scarlett St, Riser up and overlash going South 505' continue going 436' continue going North 126' continue West 80' Riser down. ADDRESS ON APPLICATION: 530 S PANTANO RD | Final | |
| 2019-05-29expired 2024-01-29 | T19CM03787City permit record | Commercial BuildingTI: WASH ROOMS TO EXISITING BUILDING | Issued | |
| 2019-04-08finaled | T19CM02419City permit record | COMBORELOCATE GAS METER | Final | |
| 2016-05-18finaled | T16BU00782City permit record | BUILDFIRE ALARM | Final | |
| 2013-03-20finaled | DP13-0047City permit record | Development PackageSITE | Complete | |
| 2013-03-20finaled | T13CM01586City permit record | Solar PVPHOTOVOLTATIC SOLAR CANOPIES | Final | |
| 2009-06-10 | C10-01-36City permit record | Zoning Verification LetterC10-01-36 Christ Community Church / Terry Cropp - - No | Approved | |
| 2008-02-04expired 2008-08-03 | T08BU00210City permit record | SPKLR6 new sprinkler heads | Expired | |
| 2006-10-30finaled | T06OT02792City permit record | SIGN12067 | Final | |
| 2005-09-23expired 2006-04-25 | T05OT02365City permit record | SIGNSIGN:9755 CHRIST COMMUNITY CHURCH | Expired | |
| 2004-08-16finaled | T04BU02039City permit record | SPKLRFIRE SPKR:ADD 119 | Final | |
| 2003-01-23finaled | T03BU00164City permit record | BUILDFIRE SPKR:KITCHEN EXHAUST HOOD SYSTEM | Final | |
| 2002-12-26finaled | T02CM05913City permit record | COMBOREMODEL:CHURCH | C of o | |
| 2002-11-21expired 2003-01-20 | T02EX01351City permit record | EXCAVEXCAV:INSTALL UTILITIES 150LF | Closed | |
| 2002-10-09finaled | T02BU02645City permit record | SPKLRFIRE SPKR:ADD 109 | Final | |
| 2002-10-02expired 2002-12-01 | T02EX01142City permit record | EXCAVTRENCH:FIRE SERVICE | Closed | |
| 2002-09-17finaled | T02BU02514City permit record | SPKLRSPRINKLER: | Final | |
| 2002-09-13 | T02BU02496City permit record | SPKLRFIRE SPKR:ADD 71 | Void | |
| 2002-08-27 | T02AN00803City permit record | ADDRNEW | Issued | |
| 2002-08-27expired 2003-05-07 | T02CM04066City permit record | COMBOMODULAR:CLASSROOM | Expired | |
| 2002-05-22finaled | T02PL01014City permit record | PLUMBINSTALL: WATER LINES (APA) | Final | |
| 2002-02-27finaled | T02CM01099City permit record | COMBOCHURCH:NEW | C of o | |
| 2001-12-17expired 2002-02-15 | T01EX01451City permit record | EXCAVEXCAV:TRENCH 10 LF | Closed | |
| 2000-09-27finaled | T00BU02893City permit record | BUILDFIRE ALARM | Final | |
| 2000-09-07 | T00CM04462City permit record | COMBOMODULAR:CLASSROOM (3) | Withdrwn |
How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.
Code enforcement (7)
Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.
| Date | Record | What | Status |
|---|---|---|---|
| 2021-05-28 | T21DV03216Code enforcement case | Refuse | Noverify |
| 2019-08-06 | T19DV06281Code enforcement case | Code enforcement case | Noverify |
| 2010-10-12finaled | T10FR02077Code enforcement case | Fire | Complete |
| 2009-11-10 | T09FR03503Code enforcement case | Fire | Field |
| 2009-03-23finaled | T09FR01038Code enforcement case | Fire | Complete |
| 2006-07-25finaled | T06FR02289Code enforcement case | Code enforcement case | Complete |
| 2005-04-21 | T05VL00368Code enforcement case | Sign | Complian |
Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.
This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.
Planning work at this property?
Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
The permanent link and the summary above, sent once. No list.One email when a new permit, inspection result or code case appears on this parcel — nothing else, and you can stop any time. No list.
How this report was built
This is a reading of public records for parcel 13414014A — 38 permits on file from 2000 to 2026 (6 combo, 5 spklr, 4 fire operational, 3 fireoper) and 7 code enforcement cases — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-17; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.
The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).