Electrical permit history — 9300 E Broadway Bl

9300 E Broadway Bl, Tucson — built 1974, with 9 permits on record. Review electrical, HVAC and remodel history with links to official records.

Commercial property

9300 E Broadway Bl

Built 1974 — 1970s commercial stock · 9 permits on record; no permitted panel/service or HVAC work among them

Parcel
13401002E
Built
1974 (assessor record)
Jurisdiction
Tucson
Zoning
SR
Assessor use
State School Prop
Parcel size
25.21 acres
Building area
95,054 sq ft (assessor record)
Sewer
No connection on file (sewer or septic status not confirmed by the record — verify on site)
Flood zone
X — minimal flood hazard (FEMA)
Historic preservation
Not on file (City of Tucson HP layers)

See the property

County aerial photograph centered on 9300 E Broadway Bl, parcel outlined

Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.

Is it time to upgrade?

  • Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2018 solar pv permit is on file (and 1 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
  • Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2018 solar pv permit is on file (and 1 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
  • Fire alarm & life safetyNot in this windowNothing in the permit records we read for this parcel that names this system. Any alarm or sprinkler work here predates this feed. For an occupied commercial building that is worth confirming from the panel and the inspection tags rather than assuming.
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Era-based check — high priority

    Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.

  • Era-based check

    NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.

  • Worth confirming

    A pool or spa was permitted in 2022. Pool equipment brings its own bonding grid, GFCI requirements, and usually a subpanel — and the bonding rules have tightened since, so older installations are worth verifying.

  • Worth confirming

    Solar was permitted here in 2018. That means there is an existing interconnection, and the main breaker and busbar rating already carry a PV backfeed — so anything else you add (an EV charger, a heat pump) has to be checked against what is left under the 120% rule, not against the service size alone.

Most recent permit on record for this parcel: 2023-02-20 (TR-UTL-0223-00918) — RE: Permit T22RW03109. WO T39219. Performing aerial maintenance on existing poles. No civil work required..

Permit history (9)

Permit history for this parcel — 8 of 9 records
DateRecordWhatStatusValue
2023-02-20finaledTR-UTL-0223-00918City permit recordRight-of-Way (ROW) - UtilityRE: Permit T22RW03109. WO T39219. Performing aerial maintenance on existing poles. No civil work required.Complete
2022-08-27finaledT22RW03109City permit recordPool / spaWO T39219. Performing aerial maintenance on existing poles. No civil work required. NOTE: If Night work is required - Work will not exceed night time residential maximum permissible sound levels. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. DAN ROBERTSON AT 520-400-6722 OR TOM ADKINS AT 520-400-3813. OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP. BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. 1. BUS STOP IN THE AREA, CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 24-HOURS PRIOR TO START OF WORK FOR COORDINATION. 2. PLACE "BUSINESS ACCESS" SIGNS APPROPRIATELY. SEVERAL BUSINESSES ALONG ROUTE. 3. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 4. ALL AERIAL WORK MUST BE A MINIMUM OF 16-FT HIGH. AND MUST BE A MINIMUM OF 18-FT HIGH WHEN CROSSING INTERSECTIONS, PAVEMENT AND ALLEYS. 5. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION 6. MAINTAIN PEDESTRIAN ACCESS 7. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. IF WEEKEND WORK, MAKE CONTACT 48 HOURS PRIOR TO THE WEEKEND. DAN ROBERTSON- 520-400-6722Complete
2020-12-23T20CM08977City permit recordCOMBOInstalling three antennae, one radio and associated cabling on the existing wireless facility.Withdrwn
2020-11-07T20CM07773City permit recordCommercial BuildingREPL CELL TOWER ANTENNASIn review
2020-06-01finaledT20RW03096City permit recordROWHalcyon Acres Block 1, DP18-0168, FOR PIA NUMBER T1-PI00037 INSTALLING NEW TURN LANE AND PROPERTY ENTRANCE ON HARRISON ADDRESS ON APPLICATION IS 9440 E BROADWAY BLFinal
2018-02-12finaledT18CM01089City permit recordSolar PVSOLAR PROJECTL of c
2015-01-21T15TC00191City permit recordBARRICADMaintenanceExpired
2014-12-15finaledT14TC03274City permit recordBARRICADTucson Water Maintenance Daily 12-04-14Final
Show 1 older record
Permit history for this parcel — remaining 1 records
DateRecordWhatStatusValue
2014-02-03finaledT14CM00659City permit recordSolar PVADDITION; CANOPIES W/SOLAR - TUSD SCHOOLL of c

How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.

Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this report was built

This is a reading of public records for parcel 13401002E — 9 permits on file from 2014 to 2023 (2 solar pv, 2 barricad, 1 right-of-way (row) - utility, 1 pool / spa) — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.

The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.