Electrical permit history — 2286 N Catalina Vista Lp

2286 N Catalina Vista Lp

  • Electrical service: panel or service replaced in 2015 (400 A per the permit), passed final inspection.
  • Watch for: built 1998, before AFCI breakers were required in most rooms.
  • Other work on record: water heater replacement permitted 2025 (permit not closed), solar added 2015, trade permit 2015, and 2 more — see the records below.

From City of Tucson permits and the Pima County Assessor, checked 13 Nov 2026. Not an inspection.

I am a
Get a free panel check

Is it time to upgrade?

Probably not: the 2015 permit shows 400 A of service, and it passed final inspection.

  • Electrical service & panelLooks currentPanel or service replaced under a 2015 permit that passed final inspection (400 A per the permit). The label in your panel is the final word. T15CM01644 — ELECTRIC SERVICE UPGADE TO 400AMP
  • Heating & coolingLikely needs attentionLast permitted 1997 (29 years ago) — the permit passed final inspection. The assessor records cooling as Refrigeration and heating as Forced Air. Cooling equipment works harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Equipment from before about 2010 generally runs R-22, which has not been produced since 2020 — repairs mean reclaimed refrigerant at a price that often exceeds replacing the unit. T97CM02342 — SFR:PRIV GARAGE:PORCH:FIREPLACE:A/C: TD#13-35-25
  • Water heaterWorth checkingA 2025 permit covers this work, but the record shows no final inspection (official status: Inspections). TC-RES-1025-04940 — Water heater replacement, 50-gallon gas, like for like
  • RoofWorth checkingNo permit on record names this system. The assessor records the roof as Tile.

What that usually means electrically

  • Era-based check

    AFCI protection did not enter the code until the 1999 NEC (bedroom circuits, effective 2002) and was not expanded to most living areas until 2008 — so houses from the earlier part of this range typically have none at all.

  • Worth confirming

    The assessor records a pool on this parcel. Equipment bonding, the equipotential bonding grid and GFCI protection on the pump and light circuits are the usual findings on pool equipment — the pool-bonding rules in NEC Article 680 were expanded in the 2008 cycle, so a pool built before that is worth an on-site check.

  • Routine

    A trade permit was pulled in 2015. Trade permits cover electrical, plumbing, and mechanical work individually, so some permitted trade work has been done here since.

What to check at the panel

These are the things only someone standing at the panel can settle — about a minute’s work. Check them against the 400 A the 2015 permit describes.

  1. The number stamped on the main breaker handle. The 2015 permit describes 400 A; the handle and the panel label are the final word.
  2. The busbar rating printed on the panel label. It is a different number from the main breaker, and it is the one that decides how much solar a panel can take under the 120% rule.
  3. The manufacturer and catalog number on the label inside the door.
  4. How many full-size spaces are left, how many positions the label permits a tandem breaker in, and the tandem limit the label states. A full panel is a different job from a full service.
  5. The conductor material at the main lugs, and whether the terminations look clean and tight.
  6. Whether there is a separate meter-main outside as well as the panel indoors — that changes where a disconnect and any new feeder would land.
  7. Whether the water heater, dryer and range are gas or electric. No public record carries fuel type, and it is the single biggest variable in a load calculation — it can move the calculated load on the same house by more than 40 A.

With those in hand you can run the numbers yourself. The load calculator does the NEC 220.82 optional-method calculation — the same method a permit application uses — and shows its work. It offers to start from the 3,520 sq ft on the assessor record; every other value is yours to enter. Open the load calculator

What these jobs cost here

Panel or service replaced under a 2015 permit that passed final inspection (400 A per the permit) — an upgrade is not the job here.

Air conditioning or heat pump replacement Estimate

$13,300

Most jobs like this land between $10,300 and $16,800.

Priced from 3 ton on a finalled permit (T15CM02769) — the size actually installed here, not a square-foot estimate; cooling on the assessor record reads “Refrigeration”; City of Tucson permit fee.

What would move this price
  • Only if the duct has to be replaced — no record carries its condition, and on an attic system at this age it is a real possibility +$16,200

If every one of those turned out to apply, this becomes about $33,000. That is the worst realistic case.

  • Because a permit names the size, this is priced at that size rather than from floor area. Worth asking whether that size was ever right: a Manual J often comes out smaller, and a correctly sized machine costs less and behaves better in the monsoon.
Before you spend anything
  • If someone quotes you “just the outside unit” on a system installed between about 2010 and 2024, stop. New condensers use R-454B or R-32; an R-410A indoor coil cannot be matched to one unless the manufacturer publishes that exact combination with a mitigation kit. The honest options are to find remaining pre-2025 R-410A stock — still legal to install, but scarce, and it still has to meet the Arizona efficiency floor — or to replace both halves as a matched system.
  • If you are told a heat pump means you need a 200 A service, ask which load. It is almost never the compressor — a 5-ton outdoor unit is about a 31 A circuit. It is the electric BACKUP HEAT STRIP, which on a large kit can be a 109 A circuit on its own. In Tucson's mild heating season the strip kit can often be sized far smaller, or left out, and the service question disappears with it.
  • Equipment here lasts ten to fourteen years, not the fifteen to twenty you will read nationally — a rooftop package unit at the short end. Replace rather than repair if the unit is twelve or more and the repair is over $1,500, if the compressor has failed and it is eight or more, or if the repair is over 40% of a new system.

The label in your panel is the final word; the permit on record is T15CM01644. If you need more circuits rather than more service, a subpanel is the far cheaper job.

What the record cannot tell us
  • The pool equipment. A pool pump and any electric heater sit on the same service as the new cooling, which matters for the panel rather than for the tonnage — worth raising with whoever runs the load calculation.
  • The duct. No record carries its condition, and on a Tucson house with duct in an unconditioned attic it is often worth more than a bigger machine.
  • Whether that floor area is all conditioned space. An assessor figure can include a garage, an enclosed porch or an addition that was never cooled, and every square foot of that oversizes the equipment this page priced.

Price it for your house — change the assumptions (the panel’s location, the duct, the tonnage, whether the service is overhead or underground) and watch the number move.

Solar on this property

Solar was permitted here in 2015 and passed final inspection. What that means if you add anything: the panel’s busbar already carries the solar backfeed, so an EV charger, a heat pump or a bigger air conditioner has to fit what is left under the 120% rule in NEC 705.12, not just the service size. Check the busbar rating on the panel label before you add a load.

A battery, more panels or an EV charger tied to the solar is new permitted work, and anything that changes the solar connection usually needs a new interconnection application with TEP. TEP credits exported surplus at its RCP rate — about 5¢/kWh for new applications, locked for 10 years — so sizing to the home’s own use matters more than filling the roof.

Flood and drainage

The federal flood map and the local one are not the same map, and they do not always agree. FEMA’s is the insurance map; the City of Tucson regulates against its own, and that is the one a permit here is judged against.

The record behind this read

Parcel
133477210
Year constructed
1998 (county record)
Permitting authority
Tucson
Zoning
R-1
Living area
3,520 sq ft
Cooling
Refrigeration
Heating
Forced Air
Electrical service
Panel or service replaced under a 2015 permit that passed final inspection (400 A per the permit). The label in your panel is the final word.

Living area, cooling and heating come from the Pima County Assessor’s file published 28 Jan 2026. Check any row against Pima County’s own parcel record ↗.

What this means for work here

The most recent permit with evidence of issuance is dated 2025. The work was permitted, but final completion is not confirmed. The permit covers only the work described in that record.

What that reading rests on. The issuing offices hold 6 building permits for this parcel dated between 1997 and 2025. Three trade permits, one solar permit, one pool or spa permit and one new-construction permit. 5 of them carry a final inspection; the other one was issued, expired or is still open, which is not the same as work completed.

Go straight to the records

Each link opens the issuing office’s own file for that record — dates, scope, status and inspections are theirs to publish, and they are all on the other side of these links.

Permit records courtesy of the City of Tucson — each link opens the City’s own file. The files are held by City of Tucson permit record (PRO) ↗ — search the parcel number 133477210.

See an error? Report a correction · About this data.

Utility and upgrade pathElectric service here is Tucson Electric Power (TEP). A service or panel upgrade needs a TEP meter release and has to meet TEP’s service requirements — meter height and location, clearances, and the point of attachment. See TEP new-service requirements and the TEP standards notes.

In the public record: All homes in 85749 · Homes by ZIP code · Commercial property in 85749 · Permit data by neighborhood

Planning work at this home?

Arizona Electrical Solutions — electrical, HVAC, underground, design-build and general contracting in Tucson (four Arizona ROC licenses). The address, parcel and this report travel with your request.

Get a free panel check

Want a plain-English brief of this record first?

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this property compares nearby

Built in 1998 — earlier than about 23% of the 7,518 homes in ZIP 85749. 3,520 sq ft of living area — above this ZIP’s median of 2,418 sq ft. About 13% of homes in this ZIP still cool with evaporative — this one has moved to refrigeration cooling. Properties on N CATALINA VISTA LP hold 42 City permits on record, 3 of them since 2022.

Counts and years from the same public records.

How this report was built

This is a reading of public records for parcel 133477210 — 6 City permits on file from 1997 to 2025 — assembled from the Pima County parcel file and the City of Tucson’s published permit layers together with the City’s own migrated permit archive. City of Tucson permit records go back to the mid-1990s, with fewer before 2006, when the City’s older paper files were only partly digitized. The construction year, living area, cooling, heating, roof, walls and pool on this page come from our saved copy of the Assessor’s own published data file (dated 28 Jan 2026). The sewer connection file and the flood map were not read for this snapshot. A permit that is absent here may predate the digitized record or sit in a system this snapshot did not read. This record was built 22 Aug 2026 and compared against the City’s 13 Nov 2026 permit export, with no change for this parcel.

What this report is and is not. This is a screening report written by Arizona Electrical Solutions from public records — the year the building went up, how it is classified and what has been permitted. It is not an inspection, an appraisal, a floodplain determination, or engineering, legal or purchasing advice, and nothing in it confirms what is installed at this address: a permit shows what was permitted, a missing permit does not mean nothing was done, and era notes describe what was common when the building went up, not what is in this one. Price figures are estimates, not quotes. The issuing agency’s own record is the official one and controls over anything summarized here — every permit links to it. Only someone looking at the panel can confirm the service size, the panel brand or the wiring.

Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.