Electrical permit history — 550 N Harrison Rd

550 N Harrison Rd, Tucson — built 2003, with 74 permits on record. Review electrical, HVAC and remodel history with links to official records.

Electrical Property Screening Report · Multifamily property

550 N Harrison Rd

A screening report for electrical planning, assembled from public-record indicators. It is not an official record and every figure in it should be verified against the issuing agency before it is relied on.

Verify parcel data at official source ↗

Built 2003 — 2000s multifamily stock · 74 permits on record; no permitted panel/service or HVAC work among them

Is it time to upgrade?

  • Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2024 pool / spa permit is on file (and 1 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. No permitted service or distribution work shows in the record we read. Gear of this era is generally still supported, but spare capacity drifts with every tenant improvement — worth a load check against the panel schedule before adding major equipment. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
  • Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2024 pool / spa permit is on file (and 1 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
  • Fire alarm & life safetyNot in this windowNothing in the permit records we read for this parcel that names this system. Any alarm or sprinkler work here predates this feed. For an occupied commercial building that is worth confirming from the panel and the inspection tags rather than assuming.
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitized. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Worth confirming

    Multifamily property. House panels, unit meters, and common-area loads are usually metered and maintained separately — worth confirming which side of the meter a problem falls on before scheduling work.

  • Era-based check

    NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.

  • Worth confirming

    A pool or spa was permitted in 2024. Pool equipment brings its own bonding grid, GFCI requirements, and usually a subpanel — and the bonding rules have tightened since, so older installations are worth verifying.

Solar and energy potential

Roof footprint
≈ 65,699 sq ft (county building-footprint layer, 18 structures; 1 neighbouring structure crossing the lot line excluded)
Usable for solar, planning estimate
≈ 46,000 sq ft (~70% after setbacks, rooftop equipment and access paths)
Array that could fit
on the order of 510 kW — roughly 1,280 panels (low-tilt ballasted rows, 400 W class modules)
Estimated annual production
≈ 840,000 kWh (PVWatts, Tucson sun, low-tilt south)
Energy-charge offset at TEP commercial rates
$67,000–$109,000 a year (8–13¢/kWh energy + power-supply charges, by season and rate class)

Planning-level arithmetic on the roof area above — not a shading study, a structural review or a design. The offset assumes the building uses the power as it is generated; TEP pays far less (its export rate is about 5¢/kWh) for surplus sent to the grid, so the load profile decides the real value. The 30% federal credit (§48E) still applies to commercial systems placed in service by the end of 2027 — projects that began construction by July 4, 2026 have longer; confirm timing with a tax adviser.

TEP grid capacityThis parcel is not inside any of the 11 areas TEP has mapped as saturated with distributed generation (the nearest, “Irvington and Houghton”, is about 2.6 miles away — TEP’s map set, July 2020). New generation still goes through TEP’s interconnection screens, and a heavy new load still merits a utility capacity check — the maps only mark where that review is most likely to bite.

Get a commercial solar & switchgear analysis

See the property

Satellite imagery © Google. Imagery can predate recent work and shows nothing about what is inside — context, not evidence.

Flood and drainage

The federal flood map and the local one are not the same map, and they do not always agree. FEMA’s is the insurance map; the City of Tucson regulates against its own, and that is the one a permit here is judged against.

The record behind this read

Parcel
133369540
Year constructed
2003 (county record)
Permitting authority
Tucson
Zoning
R-3
Property type
Apartments 100+ Units 2 Story
Sewer
No connection on file (sewer or septic status not confirmed by the record — verify on site)
Flood zone
X — minimal flood hazard (FEMA)

The most recent permitted work on this parcel was in 2026. That says the parcel was worked on under permit, not what the work covered — a roof, a pool or a changeout tells you nothing about the electrical service. Work done without a permit leaves no trace here at all.

What this means for work here

Informational public-record summary — not engineering, inspection, valuation or purchasing advice, and not the official record.

The most recent permitted work on this parcel was in 2026. That says the parcel was worked on under permit, not what the work covered — a roof, a pool or a changeout tells you nothing about the electrical service. Work done without a permit leaves no trace here at all.

What that reading rests on. The issuing offices hold 74 building permits for this parcel dated between 1997 and 2026. By category the work is commercial building (11), addition / alteration (10) and excav (7). 36 of them carry a final inspection; the other 38 were issued, expired or are still open, which is not the same as work completed. There are 28 code-enforcement cases recorded against the parcel, all of them closed. We do not reproduce complaint text — it routinely names people with no connection to the property.

Go straight to the records

Each link opens the issuing office’s own file for that record — dates, scope, status and inspections are theirs to publish, and they are all on the other side of these links.

Read the records yourself. We republish selected facts and record numbers so you can find the file; the issuing agency’s record controls. The files are held by City of Tucson permit record (PRO) ↗ — search the parcel number 133369540. Permit and parcel information courtesy of the City of Tucson and Pima County; their files are the official record and control over anything summarized here.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.

Utility and upgrade pathElectric service here is Tucson Electric Power (TEP). A service or panel upgrade needs a TEP meter release and has to meet TEP’s service requirements — meter height and location, clearances, and the point of attachment. See TEP new-service requirements and the TEP standards notes.

In the public record: All multifamily property · Commercial property in 85748 · Commercial & industrial reports · Homes in 85748 · Permit data by neighborhood

Planning work at this property?

Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

What the flood note is not. The flood zone shown is FEMA’s National Flood Hazard Layer — the federal insurance map. Local floodplain mapping is not reproduced here; use the authority’s own map, linked above. Nothing here is a floodplain determination, an elevation certificate, or a substitute for one. A parcel can straddle a boundary, and a Letter of Map Amendment can remove a structure the map still covers. For a determination, ask the floodplain administrator for the jurisdiction named above; for a design that has to satisfy one, that is work we do.

Complete permit record (102 entries)

Every permit and case we hold for this parcel, newest first. Each number links to the official file.

YearNumberTypeStatus
2026TC-COM-0426-00512Commercial Addition/Alteration PermitIssued
2026TC-COM-0426-00518Commercial Addition/Alteration PermitIssued
2026TC-COM-0426-00508Commercial Addition/Alteration PermitInspections
2026TC-COM-0426-00507Commercial Addition/Alteration PermitInspections
2026TC-COM-0426-00510Commercial Addition/Alteration PermitInspections
2026TC-COM-0426-00514Commercial Addition/Alteration PermitInspections
2026TC-COM-0426-00519Commercial Addition/Alteration PermitInspections
2026TC-COM-0426-00503Commercial Addition/Alteration PermitInspections
2026TC-COM-0426-00506Commercial Addition/Alteration PermitInspections
2026TC-COM-0426-00504Commercial BuildingInspections
2026TC-COM-0426-00521Commercial BuildingInspections
2026TC-COM-0426-00522Commercial BuildingFees due
2026TC-COM-0426-00523Commercial BuildingFees due
2026TC-COM-0426-00524Commercial BuildingNeeds resubmittal
2026TC-COM-0426-00525Commercial BuildingApproved - awaiting cust
2026TC-COM-0426-00526Commercial BuildingInspections
2026TC-COM-0426-00527Commercial BuildingInspections
2026TC-COM-0426-00528Commercial BuildingInspections
2025TS-PRM-1025-00441Permanent Sign PermitInspections Complete
2024TZ-CMP-1124-00171Zoning Verification LetterComplete
2023TC-COM-0323-00902Commercial BuildingIssued
2023CE-VIO0323-02176Code enforcement caseClosed - unfounded
2022T22RW03210Right-of-Way (ROW)Complete
2022T22DV05021Code enforcement caseComplian
2022T22DV03991ElectricalComplian
2022T22DV02177Code enforcement caseNoverify
2021T21RW05219ROWFinal
2021T21RW03990ROWFinal
2021T21DV05257Code enforcement caseComplian
2021T21RW00833ROWVoid
2020T20CM05744COMBOFinal
2020T20CM04395Commercial BuildingExpired
2020T20BU00242DEMOVoid
2020T20DV02371Code enforcement caseNoverify
2020T20DV02256FireComplian
2020T20DV02257FireComplian
2020T20DV02258FireComplian
2020T20DV02259FireComplian
2020T20DV00523Code enforcement caseVoid
2020T20DV00230Code enforcement caseVoid
2019T19PL00037PLUMBWithdrwn
2019T19DV05177Code enforcement caseNoverify
2018T18DV08207ElectricalComplian
2017T17DV02938VegetationComplian
2017T17DV02928Code enforcement caseNoverify
2015T15DV03129Code enforcement caseNoverify
2014T14DV07468VegetationNoverify
2014T14DV03163Code enforcement caseComplian
2013T13DV00318GraffitiNoverify
2012T12DV02103Code enforcement caseComplian
2010T10FR00855Code enforcement caseComplete
2009T09DV06444Work without permitComplian
2006T06FR02475Code enforcement caseComplete
2006T06FR02280Code enforcement caseComplete
2006T06VL00725FireComplian
2003T03BU00935BUILDExpired
2003T03OT00423SIGNFinal
2003T03BU00237POOL/SPAFinal
2002T02PL01817PLUMBFinal
2002T02EX01095EXCAVClosed
2002T02OT01463FLOODPLNFinal
2002T02BU02366TEMP-FBBWithdrwn
2002T02EL01668ELECTFinal
2002T02CM02104COMBOFinal
2002T02CM02073COMBOC of o
2002T02CM02074COMBOC of o
2002T02CM02075COMBOC of o
2002T02CM02076COMBOC of o
2002T02CM02077COMBOC of o
2002T02CM02078COMBOC of o
2002T02CM02079COMBOC of o
2002T02CM02080COMBOC of o
2002T02BU00724GRADINGFinal
2002T02CM00727COMBOExpired
2001T01BU03280GRADINGExpired
2000T00VL01236SignComplian
1999T99BU03422GRADINGWithdrwn
1999T99VL00437SignComplian
1999T99EX00018EXCAVClosed
1998T98EX01169EXCAVClosed
1998T98BU02102BUILDExpired
1998T98EX00885EXCAVClosed
1998T98BU01651WALL/FENFinal
1998T98EL00869ELECTFinal
1998T98EX00446EXCAVClosed
1998T98BU00749POOL/SPAExpired
1998T98EL00129ELECTFinal
1998T98EX00011EXCAVClosed
1998T98EX00002EXCAVClosed
1997T97CM04142COMBOC of o
1997T97CM04143COMBOC of o
1997T97CM04144COMBOC of o
1997T97CM04145COMBOC of o
1997T97CM04146COMBOC of o
1997T97CM04147COMBOC of o
1997T97CM04148COMBOC of o
1997T97CM04149COMBOC of o
1997T97CM04150COMBOC of o
1997T97CM04151COMBOC of o
1997T97BU01796GRADINGFinal
1997T97CM02794COMBOC of o
1997P97AN01983ADDRNEWIssued

prints this report — permits, comparisons and sources — as a clean document

How this report was built

This is a reading of public records for parcel 133369540 — 74 permits on file from 1997 to 2026 (22 combo, 11 commercial building, 10 addition / alteration, 7 excav) and 28 code enforcement cases — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-22; the permit record is refreshed on a rolling cycle (at least every 45 days), and the assessor’s building file when the county publishes a new roll. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.

Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.