Electrical permit history — 9009 E Broadway Bl

9009 E Broadway Bl, Tucson — built 1978, with 64 permits on record. Review electrical, HVAC and remodel history with links to official records.

Electrical Property Screening Report · Multifamily property

9009 E Broadway Bl

A screening report for electrical planning, assembled from public-record indicators. It is not an official record and every figure in it should be verified against the issuing agency before it is relied on.

Verify parcel data at official source ↗

Built 1978 — 1970s multifamily stock · last permitted panel/service work 2025 (finaled); a newer 2025 permit is issued

Is it time to upgrade?

  • Electrical service & distributionFinaled permit foundA newer 2025 permit for the same system is recorded as “Inspections” — The work was permitted, but final completion is not confirmed. The permit description states “Replace like 200 amp all in one panel with new 200 all in one panel. Per TEP specs.”. Last permitted 2025 (1 year ago). City inspection record: COT - LCEL - Electrical Final approved 2026-01-21. Worth reading the permit itself: it names the service but does not read as an increase in capacity, so this may have been a like-for-like replacement rather than an upgrade. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service. TC-COM-1125-02040 — Replace like 200 amp all in one panel with new 200 all in one panel. Per TEP specs.
  • Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2025 fire operational permit is on file — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
  • Fire alarm & life safetyFinaled permit foundLast permitted 2025 (1 year ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. TF-FOP-1025-01310 — Need verification that there is no sprinkler system on this property.
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitized. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Era-based check

    A finaled 2025 panel/service permit is on record for this parcel, which makes it unlikely the original 100–150 A equipment is still in place. That is a permit record, not an inspection — verify the installed rating and the panel brand on site before sizing anything new. The permit record does not confirm this; an on-site inspection is required.

  • Era-based check — high priority

    Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.

  • Worth confirming

    Multifamily property. House panels, unit meters, and common-area loads are usually metered and maintained separately — worth confirming which side of the meter a problem falls on before scheduling work.

  • Era-based check

    NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.

  • Worth confirming

    There is an electrical reconnect permit from 2003. The service was disconnected at some point and brought back — usually after a vacancy, a utility disconnect, or work that required the power off. Worth knowing what prompted it.

Solar and energy potential

Roof footprint
≈ 67,687 sq ft (county building-footprint layer, 23 structures)
Usable for solar, planning estimate
≈ 47,400 sq ft (~70% after setbacks, rooftop equipment and access paths)
Array that could fit
on the order of 520 kW — roughly 1,300 panels (low-tilt ballasted rows, 400 W class modules)
Estimated annual production
≈ 860,000 kWh (PVWatts, Tucson sun, low-tilt south)
Energy-charge offset at TEP commercial rates
$69,000–$112,000 a year (8–13¢/kWh energy + power-supply charges, by season and rate class)

Planning-level arithmetic on the roof area above — not a shading study, a structural review or a design. The offset assumes the building uses the power as it is generated; TEP pays far less (its export rate is about 5¢/kWh) for surplus sent to the grid, so the load profile decides the real value. The 30% federal credit (§48E) still applies to commercial systems placed in service by the end of 2027 — projects that began construction by July 4, 2026 have longer; confirm timing with a tax adviser.

TEP grid capacityThis parcel is not inside any of the 11 areas TEP has mapped as saturated with distributed generation (the nearest, “Irvington and Houghton”, is about 2.5 miles away — TEP’s map set, July 2020). New generation still goes through TEP’s interconnection screens, and a heavy new load still merits a utility capacity check — the maps only mark where that review is most likely to bite.

Get a commercial solar & switchgear analysis

See the property

Satellite imagery © Google. Imagery can predate recent work and shows nothing about what is inside — context, not evidence.

Flood and drainage

The federal flood map and the local one are not the same map, and they do not always agree. FEMA’s is the insurance map; the City of Tucson regulates against its own, and that is the one a permit here is judged against.

The record behind this read

Parcel
13332507D
Year constructed
1978 (county record)
Permitting authority
Tucson
Zoning
R-2
Property type
Apartments 25 - 99 Units 2 Story
Sewer
No connection on file (sewer or septic status not confirmed by the record — verify on site)
Flood zone
X — minimal flood hazard (FEMA)
Service on record
City records show the 2025 permit was finalized; the permit description states “Replace like 200 amp all in one panel with new 200 all in one panel. Per TEP specs.”.

The most recent permitted work on this parcel was in 2026. That says the parcel was worked on under permit, not what the work covered — a roof, a pool or a changeout tells you nothing about the electrical service. Work done without a permit leaves no trace here at all.

What this means for work here

Informational public-record summary — not engineering, inspection, valuation or purchasing advice, and not the official record.

The most recent permitted work on this parcel was in 2026. That says the parcel was worked on under permit, not what the work covered — a roof, a pool or a changeout tells you nothing about the electrical service. Work done without a permit leaves no trace here at all.

What that reading rests on. The issuing offices hold 64 building permits for this parcel dated between 2000 and 2026. By category the work is commercial building (46), elect (5) and build (2). 36 of them carry a final inspection; the other 28 were issued, expired or are still open, which is not the same as work completed. There are 76 code-enforcement cases recorded against the parcel, all of them closed. We do not reproduce complaint text — it routinely names people with no connection to the property.

Go straight to the records

Each link opens the issuing office’s own file for that record — dates, scope, status and inspections are theirs to publish, and they are all on the other side of these links.

Read the records yourself. We republish selected facts and record numbers so you can find the file; the issuing agency’s record controls. The files are held by City of Tucson permit record (PRO) ↗ — search the parcel number 13332507D. Permit and parcel information courtesy of the City of Tucson and Pima County; their files are the official record and control over anything summarized here.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.

Utility and upgrade pathElectric service here is Tucson Electric Power (TEP). A service or panel upgrade needs a TEP meter release and has to meet TEP’s service requirements — meter height and location, clearances, and the point of attachment. See TEP new-service requirements and the TEP standards notes.

In the public record: All multifamily property · Commercial property in 85710 · Commercial & industrial reports · Homes in 85710 · Permit data by neighborhood

Planning work at this property?

Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

What the flood note is not. The flood zone shown is FEMA’s National Flood Hazard Layer — the federal insurance map. Local floodplain mapping is not reproduced here; use the authority’s own map, linked above. Nothing here is a floodplain determination, an elevation certificate, or a substitute for one. A parcel can straddle a boundary, and a Letter of Map Amendment can remove a structure the map still covers. For a determination, ask the floodplain administrator for the jurisdiction named above; for a design that has to satisfy one, that is work we do.

Complete permit record (140 entries)

Every permit and case we hold for this parcel, newest first. Each number links to the official file.

YearNumberTypeStatus
2026TR-ROW-0826-00879Right-of-Way (ROW)In review
2026TC-COM-0226-00167Commercial BuildingComplete
2025TC-COM-1125-02026Commercial BuildingInspections
2025TC-COM-1125-02027Commercial BuildingInspections
2025TC-COM-1125-02028Commercial BuildingInspections
2025TC-COM-1125-02030Commercial BuildingInspections
2025TC-COM-1125-02031Commercial BuildingInspections
2025TC-COM-1125-02032Commercial BuildingInspections
2025TC-COM-1125-02033Commercial BuildingInspections
2025TC-COM-1125-02034Commercial BuildingInspections
2025TC-COM-1125-02035Commercial BuildingInspections
2025TC-COM-1125-02036Commercial BuildingInspections
2025TC-COM-1125-02037Commercial BuildingInspections
2025TC-COM-1125-02039Commercial BuildingInspections
2025TC-COM-1125-02040Commercial BuildingComplete
2025TC-COM-1125-02041Commercial BuildingComplete
2025TC-COM-1125-02042Commercial BuildingComplete
2025TC-COM-1125-02048Commercial BuildingComplete
2025TC-COM-1125-02049Commercial BuildingComplete
2025TC-COM-1125-02050Commercial BuildingComplete
2025TC-COM-1125-02051Commercial BuildingComplete
2025TC-COM-1125-02052Commercial BuildingComplete
2025TC-COM-1125-02053Commercial BuildingComplete
2025TC-COM-1125-02054Commercial BuildingComplete
2025TC-COM-1125-02055Commercial BuildingComplete
2025TC-COM-1025-01946Commercial BuildingInspections
2025TC-COM-1025-01947Commercial BuildingInspections
2025TC-COM-1025-01933Commercial BuildingInspections
2025TC-COM-1025-01934Commercial BuildingInspections
2025TC-COM-1025-01935Commercial BuildingInspections
2025TC-COM-1025-01936Commercial BuildingInspections
2025TF-FOP-1025-01310Fire Operational PermitComplete
2025TC-COM-0425-00853Commercial BuildingComplete
2025TC-COM-0425-00854Commercial BuildingComplete
2025TC-COM-0425-00855Commercial BuildingComplete
2025TC-COM-0425-00856Commercial BuildingComplete
2025TC-COM-0425-00858Commercial BuildingComplete
2025TC-COM-0325-00562Commercial BuildingInspections
2025TC-COM-0325-00563Commercial BuildingComplete
2025TC-COM-0325-00565Commercial BuildingComplete
2025TC-COM-0325-00570Commercial BuildingComplete
2025TC-COM-0325-00572Commercial BuildingComplete
2025TC-COM-0125-00190Commercial BuildingComplete
2025TC-COM-0125-00191Commercial BuildingInspections
2025TC-COM-0125-00193Commercial BuildingInspections
2025TC-COM-0125-00134Commercial BuildingComplete
2025TC-COM-0125-00136Commercial BuildingComplete
2025TC-RES-0125-00345Residential Building - One or Two FamilyVoid
2023TC-COM-1023-02551Commercial BuildingComplete
2023CE-VIO0323-02563ElectricalClosed - unfounded
2023CE-VIO0323-02231Code enforcement caseClosed - resolved
2023TR-UTL-0123-00602Right-of-Way (ROW) - UtilityComplete
2021T21DV07483Code enforcement caseComplian
2021T21DV03496RefuseComplian
2020T20DV08121RefuseNoverify
2020T20DV08122VegetationNoverify
2019T19RW00662ROWFinal
2019T19DV00444Code enforcement caseNoverify
2017T17CM06099COMBOFinal
2016T16DV06636VegetationComplian
2016T16DV01991RefuseComplian
2015T15DV02527ElectricalNoverify
2015T15EX00306EXCAVFinal
2015T15TC00725BARRICADExpired
2014T14DV03243Code enforcement caseComplian
2014T14DV02332Code enforcement caseComplian
2013T13DV08677Code enforcement caseComplian
2013T13DV02414Code enforcement caseComplian
2012T12DV05536RefuseComplian
2012T12DV03509Code enforcement caseNoverify
2011T11DV07138Code enforcement caseComplian
2011T11DV03567VegetationComplian
2011T11DV00378Code enforcement caseComplian
2010T10FR00390Code enforcement caseComplete
2009T09OT01006SIGNFinal
2009T09DV02027Code enforcement caseComplian
2008T08DV05449VegetationComplian
2004T04VL00654SignComplian
2004T04DV00649Code enforcement caseComplian
2004T04DV00606Code enforcement caseComplian
2004T04DV00388RefuseComplian
2004T04DV00351Code enforcement caseComplian
2004T04EL00290ELECTFinal
2003T03EL02335ELECTFinal
2003T03EL02336ELECTExpired
2003T03EL02337ELECTFinal
2003T03EL02338ELECTFinal
2003T03DV00994Code enforcement caseInvalid
2003T03DV00830Code enforcement caseClosed
2003T03DV00749Code enforcement caseComplian
2003T03DV00562Code enforcement caseInvalid
2003T03DV00180Code enforcement caseClosed
2003T03DV00171Code enforcement caseComplian
2003T03DV00172Code enforcement caseComplian
2003T03DV00174Code enforcement caseComplian
2003T03DV00155Code enforcement caseClosed
2002T02VL02436Code enforcement caseClosed
2002T02VL02272Code enforcement caseComplian
2002T02VL02151ElectricalComplian
2002T02VL01913Code enforcement caseComplian
2002T02VL01836Code enforcement caseComplian
2002T02VL01815Code enforcement caseComplian
2002T02VL01775Code enforcement caseComplian
2002T02VL01749Code enforcement caseComplian
2002T02VL01729ElectricalComplian
2002T02VL01635Code enforcement caseComplian
2002T02VL01636Code enforcement caseComplian
2002T02VL01503Code enforcement caseComplian
2002T02VL01328Code enforcement caseComplian
2002T02BU01195BUILDExpired
2002T02VL00609Code enforcement caseComplian
2002T02CM01221COMBOWithdrwn
2002T02VL00339Code enforcement caseComplian
2001T01VL03292Code enforcement caseComplian
2001T01VL03259Work without permitComplian
2001T01VL03200Code enforcement caseComplian
2001T01BU03456BUILDWithdrwn
2001T01VL03123Code enforcement caseComplian
2001T01VL03106Code enforcement caseComplian
2001T01VL02704Code enforcement caseComplian
2001T01VL01788Code enforcement caseClosed
2001T01VL01791ElectricalComplian
2001T01VL01569VegetationComplian
2001T01VL01570ElectricalComplian
2001T01VL01571ElectricalClosed
2001T01VL01572Code enforcement caseComplian
2001T01VL01576ElectricalClosed
2001T01VL01577ElectricalComplian
2001T01VL01578ElectricalComplian
2001T01VL01579ElectricalComplian
2001T01VL00686Code enforcement caseClosed
2001T01VL00461ElectricalClosed
2001T01VL00463ElectricalClosed
2001T01VL00162Code enforcement caseClosed
2001T01VL00061Code enforcement caseClosed
2000T00ME01080MECHFinal
2000T00VL00629Code enforcement caseClosed
1999T99VL01341Code enforcement caseClosed
1999T99VL01253SignComplian
1998T98VL00713Code enforcement caseClosed

prints this report — permits, comparisons and sources — as a clean document

How this report was built

This is a reading of public records for parcel 13332507D — 64 permits on file from 2000 to 2026 (46 commercial building, 5 elect, 2 combo, 2 build) and 76 code enforcement cases — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-22; the permit record is refreshed on a rolling cycle (at least every 45 days), and the assessor’s building file when the county publishes a new roll. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.

Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.