Electrical permit history — 7890 E Speedway Bl

7890 E Speedway Bl, Tucson — built 1986, with 30 permits on record. Review electrical, HVAC and remodel history with links to official records.

Commercial property

7890 E Speedway Bl

Built 1986 — 1980s commercial stock · 30 permits on record; no permitted panel/service or HVAC work among them

Parcel
13323090A
Built
1986 (county record)
Jurisdiction
Tucson
Zoning
C-1
Assessor use
Restaurant Fast Food
Parcel size
0.54 acres
Building area
1,843 sq ft (assessor record)
Sewer
Connection on file (2013) (county sewer connection records)
Flood zone
X — minimal flood hazard (FEMA)
Historic preservation
Not on file (City of Tucson HP layers)

See the property

County aerial photograph centered on 7890 E Speedway Bl, parcel outlined

Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.

Is it time to upgrade?

  • Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2022 fire construction permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
  • Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2022 fire construction permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
  • Fire alarm & life safetyCurrentLast permitted 2022 (4 years ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. T22FC00705 — Automatic Fire Extingshing Sys - Add two new sprinkler heads and relocate 8 for new tenant imrovement.; Commercial Fire Sprinkler Systems - Modification of heads: 10
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Era-based check — high priority

    Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.

  • Era-based check

    NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.

  • Worth confirming

    Food service carries heavy, cycling kitchen loads and exhaust interlocks. Capacity and existing panel space are the first things to verify on any remodel.

Recorded sales (1)

Recorded transfers from the Pima County Assessor — 1 of 1
DatePriceType
2005-03-15$725,000Special Warranty Deed

Recorded sales are the sales the Pima County Assessor has on file from affidavits of property value — not every transfer, not listings, and not a valuation. Parties are never shown here. A sale with no permitted electrical work since is worth knowing before the next sale or a remodel.

Most recent permit on record for this parcel: 2023-01-03 (TC-COM-0123-00398) — STARBUCKS 19981 - DRIVE THRU MENU RELOCATION.

Permit history (30)

Permit history for this parcel — 8 of 30 records
DateRecordWhatStatusValue
2023-01-03expired 2023-07-02TC-COM-0123-00398City permit recordCommercial BuildingSTARBUCKS 19981 - DRIVE THRU MENU RELOCATIONWithdrawn
2022-12-16TC-COM-1222-00309City permit recordAddition / alterationThe following permit will be VOID, please resubmit under the correct application type for processing. Commercial Addition/Alteration Permit. STARBUCKS 19981 - DRIVE THRU MENU RELOCATIONVoid
2022-12-05TS-PRM-1222-00055City permit recordSign - Permanent(CONTRACTOR NOT WORKING ON THIS ANY LONGER, OTHER CONTRACTOR SUBMITTED - WITHDRAWN) Remove Existing Drive Thru 5 Panel Menu Board - Steel Pipe Bollard and Foundation - Remove Pre Menu Board Install New Drive Thru 5 Panel Menu Board Re-install Pre Menu Board and Drive Thru Speaker Post Install New steel Pipe BollardWithdrawn
2022-10-19finaledT22OT00775City permit recordSign - Permanent1-illum pre order+1-illum menuComplete
2022-10-12finaledT22FC00705City permit recordFire ConstructionAutomatic Fire Extingshing Sys - Add two new sprinkler heads and relocate 8 for new tenant imrovement.; Commercial Fire Sprinkler Systems - Modification of heads: 10Complete
2022-02-26expired 2023-11-05T22CM01426City permit recordCommercial BuildingRemodel of existing Starbucks coffee shop. Interior work to include updated flooring, casework, andExpired
2022-02-14expired 2023-09-12T22CM01112City permit recordCommercial BuildingMove the menu boardWithdrawn
2020-07-09finaledT20RW03905City permit recordROWKE&G WILL INVESTIGATE WATER MAIN USING POTHOLINIG AND REPLACING 24" WATER MAIN NOTES: BUS STOP IN AREA, YOU WILL HAVE TO NOTIFY SUNTRAN 24 HOURS PRIOR TO WORK SUN TRAN CONTACTS: BEA PAULUS 520-206-8826 CHRISTINA ROCK 520-206-8934 ***SUN TRAN AND PEDESTRIAN ACCESS MUST BE MAINTAINED***Final
Show 22 older records
Permit history for this parcel — remaining 22 records
DateRecordWhatStatusValue
2019-07-19finaledT19RW04023City permit recordROWEMERGENCY (AFTER THE FACT) REPLACE OR FIX STRUCK HYDRANT 15 BY 15 SQUARE; SOUTHEST CORNER OF SPEEDWAY AND PANATNOFinal
2015-01-22finaledT15TC00210City permit recordBARRICADMedian, Central & Graffiti Daily 01-22-15Final
2014-09-17expired 2014-11-16T14EX01021City permit recordEXCAVSCOPE OF WORK CONSISTS OF INTERCEPTING EXISTING COX PEDESTAL AND TRENCH/BORE EAST ALONG SPEEDWAY BLVD, 363' TO THE PROPETY LINE FOR 7890 E SPEEDWAY E10795Closed
2014-04-02finaledT14OT00386City permit recordFence / wall1- ILLUM WALL SIGNFinal
2014-01-29finaledT14BU00107City permit recordBUILDFIRE ALARMFinal
2014-01-28finaledT14BU00101City permit recordSPKLRADD 22 FIRE SPRINKLERSFinal
2013-12-12expired 2014-02-10T13EX01309City permit recordEXCAVConstruct offsite improvements per approved Development Plan DP13-0061. Close two driveway openings, place sidewalk, curb and 4 sidewalk scuppers.Closed
2013-12-02finaledT13BU01325City permit recordSPKLRFIRE SPRINKLERFinal
2013-11-05finaledT13BU01220City permit recordSPKLRInstall 146" of 4" fire service undergroundFinal
2013-11-05expired 2014-01-04T13EX01204City permit recordEXCAV4" FIRE SERVICE, NO SIDEWALK, NO DIRT, 102 FEET OF PAVEMENT; WITH TYPE B PATCHVoid
2013-10-10expired 2014-11-24T13OT01204City permit recordFence / wallILLUM WALL, DD, & DF SIGNSExpired
2013-09-27expired 2014-09-10T13CM05957City permit recordCOMBOTI: RESTAURANTExpired
2013-08-30finaledT13BU00998City permit recordDEMODEMO;COMMFinal
2013-08-22T13BU00953City permit recordDEMODEMO COMMERCIAL BUILDINGWithdrwn
2013-07-16finaledT13CM04304City permit recordCOMBONEW SHELL- RESTAURANT/CAFEL of c
2013-05-30finaledT13OT00658City permit recordFLOODPLNFLOODPLAIN USE PERMIT: StarbucksFinal
2013-04-10finaledDP13-0061City permit recordDevelopment PackageSITE AND GRADING: StarbucksComplete
2011-09-07finaledT11BU01145City permit recordTANKSUNDERGROUND TANK REMOVALFinal
2007-02-21finaledT07OT00413City permit recordSIGN12684Final
2007-02-14finaledT07CM00570City permit recordCOMBOREMODEL:REFACE CANOPY OVER PUMPSFinal
2005-05-16finaledT05EL00990City permit recordELECTREINSTALL RECEPTACLE & CABLING FOR P.O.SFinal
2005-04-22finaledT05EL00828City permit recordELECTDISPENSER REPLACEMENTFinal

How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.

Code enforcement (6)

Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.

Code enforcement history for this parcel — 6 of 6 records
DateRecordWhatStatus
2020-05-18T20DV03425Code enforcement caseSignComplian
2018-01-25T18DV00465Code enforcement caseCode enforcement caseComplian
2014-07-10T14DV04630Code enforcement caseVegetationComplian
2012-07-05T12DV05662Code enforcement caseGraffitiComplian
2012-04-27T12DV03464Code enforcement caseVegetationComplian
2008-11-25finaledT08FR04441Code enforcement caseCode enforcement caseComplete

Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.

Planning work at this property?

Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this report was built

This is a reading of public records for parcel 13323090A — 30 permits on file from 2005 to 2023 (3 commercial building, 3 excav, 3 spklr, 3 combo) and 6 code enforcement cases — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-17; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.

The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.