Electrical permit history — 2200 N Wilmot Rd
2200 N Wilmot Rd
- Electrical service: service or distribution work passed final inspection in 1999 (400 A per the permit).
- Watch for: built 1974; distribution gear this age is often past manufacturer support.
- Other work on record: addition or alteration permit 2017, trade permit 2015, permanent sign permit 2007, and 13 more — see the records below.
From City of Tucson permits and the Pima County Assessor, checked 13 Nov 2026. Not an inspection.
The permanent link and the summary above, sent once. No list.One email when a new permit, inspection result or code case appears on this parcel — nothing else, and you can stop any time. No list.
Is it time to upgrade?
Probably not: the service was upgraded to 400 A in 1999.
- Electrical service & distributionLooks currentService or distribution work under a 1999 permit that passed final inspection (400 A per the permit). The nameplate on the service equipment is the final word. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service. T99EL01676 — UPGRADE:ELECTRICAL 200 AMP TO 400 AMP
- Heating, cooling & mechanicalWorth checkingNo permit on record names this system. Worth knowing: a 2017 addition / alteration permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
- Fire alarm & life safetyWorth checkingNo permit on record names this system. Any alarm or sprinkler work here predates this feed. For an occupied commercial building that is worth confirming from the panel and the inspection tags rather than assuming.
- RoofWorth checkingNo permit on record names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.
What that usually means electrically
- Era-based check — high priority
Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown.
- Era-based check
NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear.
- Routine
Office and medical tenant improvements are usually limited by available panel spaces and branch circuit capacity, not by the service itself.
- Routine
A trade permit was pulled in 2015. Trade permits cover electrical, plumbing, and mechanical work individually, so some permitted trade work has been done here since.
Solar and energy potential
- Roof footprint
- ≈ 10,087 sq ft (county building-footprint layer)
- Usable for solar, planning estimate
- ≈ 7,100 sq ft (~70% after setbacks, rooftop equipment and access paths)
- Array that could fit
- on the order of 80 kW — roughly 200 panels (low-tilt ballasted rows, 400 W class modules)
- Estimated annual production
- ≈ 130,000 kWh (PVWatts, Tucson sun, low-tilt south)
- Energy-charge offset at TEP commercial rates
- Estimate $10,000–$17,000 a year (8–13¢/kWh energy + power-supply charges, by season and rate class)
The offset assumes the building uses the power as it is generated; TEP pays far less (its export rate is about 5¢/kWh) for surplus sent to the grid, so the load profile decides the real value. The 30% federal credit (§48E) still applies to commercial systems placed in service by the end of 2027 — projects that began construction by July 4, 2026 have longer; confirm timing with a tax adviser.
TEP grid capacityThis parcel is not inside any of the 11 areas TEP has mapped as saturated with distributed generation (the nearest, “El Con Mall - Reid Park Area”, is about 3.3 miles away — TEP’s map set, July 2020). New generation still goes through TEP’s interconnection screens, and a heavy new load still merits a utility capacity check — the maps only mark where that review is most likely to bite.
Flood and drainage
The federal flood map and the local one are not the same map, and they do not always agree. FEMA’s is the insurance map; the City of Tucson regulates against its own, and that is the one a permit here is judged against.
- FEMA: we did not read the federal flood map for this snapshot. Check FEMA’s flood map for this address ↗
- Local floodplain (the City of Tucson): local floodplain mapping is not reproduced here. A property can sit outside FEMA’s zone and still be inside a locally regulated floodplain, floodway, sheet-flooding area or erosion hazard setback, so check the authority’s own map before planning work. Pima County RFCD flood hazard map for parcel 13316025E ↗ · the City of Tucson ↗
The record behind this read
- Parcel
- 13316025E
- Year constructed
- 1974 (assessor record)
- Permitting authority
- Tucson
- Zoning
- C-2
- Property type
- Office Building 2 Story
- Building area
- 19,076 sq ft
- Electrical service
- Service or distribution work under a 1999 permit that passed final inspection (400 A per the permit). The nameplate on the service equipment is the final word.
Building area comes from the Pima County Assessor’s file published 28 Jan 2026. Check any row against Pima County’s own parcel record ↗.
What this means for work here
The most recent permit with evidence of issuance is dated 2017. City records show the permit was finalized. The permit covers only the work described in that record.
What that reading rests on. The issuing offices hold 37 building permits for this parcel dated between 1997 and 2017. 18 addition or alteration permits, seven permanent sign permits, four trade permits and three pre-application conference permits. 17 of them carry a final inspection; the other 20 were issued, expired or are still open, which is not the same as work completed.
Street and utility work at this address. The City’s file also shows two right-of-way or utility permits here (2023, 2024) — work in the street or on a utility’s lines, not on the building, so they are left out of the counts above.
Go straight to the records
Each link opens the issuing office’s own file for that record — dates, scope, status and inspections are theirs to publish, and they are all on the other side of these links.
City permit record (37): 2017 T17CM01678 · 2017 T17SE00015 · 2015 T14CM04297 · 2014 T14SE00008 · 2013 T13PRE0073 · 2013 T13PRE0024 · 2013 T13PRE0022 · 2007 T07OT01031 · 2007 T07OT00004 · 2006 T06CM04258 · 2006 T06CM04259 · 2006 T06CM04260 · 2006 T06CM04261 · 2006 T06CM04256 · 2006 T06CM04443 · 2006 T06OT01833 · 2006 T06OT01834 · 2006 T06OT01832 · 2006 T06OT01835 · 2006 T06CM01788 · 2006 T06OT00882 · 2006 T06OT00136 · 2005 T05OT02942 · 2005 T05OT02973 · 2005 T05BU02835 · 2005 T05BA00116 · 2005 T05OT00011 · 2004 T04OT02240 · 2004 T04OT02215 · 2002 T02OT00146 · and 7 older — search the parcel at the office below
Permit records courtesy of the City of Tucson — each link opens the City’s own file. The files are held by City of Tucson permit record (PRO) ↗ — search the parcel number 13316025E.
See an error? Report a correction · About this data.
Utility and upgrade pathElectric service here is Tucson Electric Power (TEP). A service or panel upgrade needs a TEP meter release and has to meet TEP’s service requirements — meter height and location, clearances, and the point of attachment. See TEP new-service requirements and the TEP standards notes.
In the public record: All commercial property · Commercial property in 85712 · Commercial & industrial reports · Homes in 85712 · Permit data by neighborhood
Planning work at this property?
Arizona Electrical Solutions — electrical, HVAC, underground, design-build and general contracting in Tucson (four Arizona ROC licenses). The address, parcel and this report travel with your request.
Want a plain-English brief of this record first?
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
Permanent link: Electrical permit history for 2200 N Wilmot Rd (aztucsonelectricalsolutions.com/property/13316025e/2200-n-wilmot-rd-tucson-az-85712)
Electrical summary — 2200 N Wilmot Rd, Tucson, AZ 85712
Parcel 13316025EYear built 1974Building area 19,076 sq ftPermit history City of TucsonRecord checked 13 Nov 2026
- Electrical service: service or distribution work passed final inspection in 1999 (400 A per the permit).
- Watch for: built 1974; distribution gear this age is often past manufacturer support.
- Other work on record: addition or alteration permit 2017, trade permit 2015, permanent sign permit 2007, and 13 more — see the records below.
Permits on record, newest first
| Date | Permit | Type | Status |
|---|---|---|---|
| Mar 2017 | T17CM01678 | Addition or alteration permit | Final |
| Feb 2017 | T17SE00015 | Mayor council special exception permit | Open |
| Apr 2015 | T14CM04297 | Trade permit | Final |
| Mar 2014 | T14SE00008 | Zoning examiner special exception permit | Open |
| May 2007 | T07OT01031 | Permanent sign permit | Final |
| Aug 2006 | T06CM04258 | Addition or alteration permit | Final |
| Aug 2006 | T06CM04259 | Addition or alteration permit | Final |
| Aug 2006 | T06CM04261 | Addition or alteration permit | Final |
and 12 more at the live report.
Voided or withdrawn permit records: 17 (not listed).
Street and utility work at this address: 2 (work in the street, not on the building; not listed).
Era flags
- Built 1974: distribution gear this age is often past manufacturer support.
Ask your inspector or engineer to check
- The main switchboard’s nameplate rating and the age and make of the distribution gear.
- Whether the arc-flash labels match the installed gear (NFPA 70E reviews them every five years).
Live report: https://www.aztucsonelectricalsolutions.com/property/13316025e/2200-n-wilmot-rd-tucson-az-85712
How this property compares nearby
Properties on N WILMOT RD hold 1,222 City permits on record, 265 of them since 2022.
Counts and years from the same public records.
Complete permit record (37 entries)
Every permit and case we hold for this parcel, newest first. Each number links to the official file.
| Year | Number | Type | Status |
|---|---|---|---|
| 2017 | T17CM01678 | Commercial Addition/Alteration Permit | Complete |
| 2017 | T17SE00015 | Mayor Council Special Exception | Approved |
| 2015 | T14CM04297 | Commercial Trade Permit | Complete |
| 2014 | T14SE00008 | Zoning Examiner Special Exception | Approved |
| 2013 | T13PRE0073 | Pre-Application Conference | Canceled |
| 2013 | T13PRE0024 | Pre-Application Conference | Canceled |
| 2013 | T13PRE0022 | Pre-Application Conference | Canceled |
| 2007 | T07OT01031 | Permanent Sign Permit | Complete |
| 2007 | T07OT00004 | Commercial Addition/Alteration Permit | Withdrawn |
| 2006 | T06CM04258 | Commercial Addition/Alteration Permit | Complete |
| 2006 | T06CM04259 | Commercial Addition/Alteration Permit | Complete |
| 2006 | T06CM04260 | Commercial Addition/Alteration Permit | Canceled |
| 2006 | T06CM04261 | Commercial Addition/Alteration Permit | Complete |
| 2006 | T06CM04256 | Commercial Addition/Alteration Permit | Complete |
| 2006 | T06CM04443 | Commercial Addition/Alteration Permit | Withdrawn |
| 2006 | T06OT01833 | Commercial Addition/Alteration Permit | Withdrawn |
| 2006 | T06OT01834 | Commercial Addition/Alteration Permit | Withdrawn |
| 2006 | T06OT01832 | Commercial Addition/Alteration Permit | Withdrawn |
| 2006 | T06OT01835 | Commercial Addition/Alteration Permit | Withdrawn |
| 2006 | T06CM01788 | Commercial Addition/Alteration Permit | Withdrawn |
| 2006 | T06OT00882 | Commercial Addition/Alteration Permit | Withdrawn |
| 2006 | T06OT00136 | Commercial Addition/Alteration Permit | Withdrawn |
| 2005 | T05OT02942 | Permanent Sign Permit | Complete |
| 2005 | T05OT02973 | Permanent Sign Permit | Complete |
| 2005 | T05BU02835 | Commercial Trade Permit | Complete |
| 2005 | T05BA00116 | Stormwater Basin | Approved |
| 2005 | T05OT00011 | Permanent Sign Permit | Complete |
| 2004 | T04OT02240 | Permanent Sign Permit | Complete |
| 2004 | T04OT02215 | Permanent Sign Permit | Complete |
| 2002 | T02OT00146 | Permanent Sign Permit | Canceled |
| 2000 | T00BU03339 | Commercial Trade Permit | Canceled |
| 2000 | T00BU03337 | Storage Tank Permit | Withdrawn |
| 2000 | T00BU00524 | Grading | Complete |
| 2000 | T99CM04985 | Commercial Addition/Alteration Permit | Canceled |
| 1999 | T99EL01676 | Commercial Trade Permit | Complete |
| 1997 | T97OT00141 | Commercial Addition/Alteration Permit | Complete |
| 1997 | T97OT00021 | Commercial Addition/Alteration Permit | Complete |
How this report was built
This is a reading of public records for parcel 13316025E — 37 City permits on file from 1997 to 2017 and 2 street or utility permits — assembled from the Pima County parcel file and the City of Tucson’s published permit layers together with the City’s own migrated permit archive. City of Tucson permit records go back to the mid-1990s, with fewer before 2006, when the City’s older paper files were only partly digitized. The construction year and living area on this page come from our saved copy of the Assessor’s own published data file (dated 28 Jan 2026). The sewer connection file and the flood map were not read for this snapshot. A permit that is absent here may predate the digitized record or sit in a system this snapshot did not read. This record was built 13 Nov 2026 from the City’s permit export of that day.
What this report is and is not. This is a screening report written by Arizona Electrical Solutions from public records — the year the building went up, how it is classified and what has been permitted. It is not an inspection, an appraisal, a floodplain determination, or engineering, legal or purchasing advice, and nothing in it confirms what is installed at this address: a permit shows what was permitted, a missing permit does not mean nothing was done, and era notes describe what was common when the building went up, not what is in this one. Price figures are estimates, not quotes. The issuing agency’s own record is the official one and controls over anything summarized here — every permit links to it. Only someone looking at the panel can confirm the service size, the panel brand or the wiring.
Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).
Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.
Permit history: City of Tucson addresses, back to the mid-1990s. Elsewhere in Pima County: property facts from the Assessor, no permit history yet.