Electrical permit history — 6565 E Grant Rd

6565 E Grant Rd, Tucson — built 1974, with 27 permits on record. Review electrical, HVAC and remodel history with links to official records.

Commercial property

6565 E Grant Rd

Built 1974 — 1970s commercial stock · last permitted panel/service work 2023 (finaled)

Parcel
13316020X
Built
1974 (county record)
Jurisdiction
Tucson
Zoning
C-1
Assessor use
Restaurant Fast Food
Parcel size
0.58 acres
Building area
2,424 sq ft (assessor record)
Sewer
Connection on file (2022) (county sewer connection records)
Flood zone
X — minimal flood hazard (FEMA)
Historic preservation
Not on file (City of Tucson HP layers)
Service on record
City records show the 2023 permit was finalized; the permit description states “Water Main Extension, new fire hydrant, and new fire service”.

See the property

County aerial photograph centered on 6565 E Grant Rd, parcel outlined

Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.

Is it time to upgrade?

  • Electrical service & distributionCurrentLast permitted 2023 (3 years ago). Applicant on the permit: Ben Lozano / Border Traffic Safety LLC. Worth reading the permit itself: it names the service but does not read as an increase in capacity, so this may have been a like-for-like replacement rather than an upgrade. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service. TR-UTL-0123-00671 — Water Main Extension, new fire hydrant, and new fire service
  • Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2023 fire operational permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
  • Fire alarm & life safetyCurrentA newer 2025 permit for the same system is recorded as “Inspections” — The work was permitted, but final completion is not confirmed. The permit description states “To upgrade the existing Ansul suppression system with an additional 3-gal cylinder to cover the overage in flow points on the existing system”. Last permitted 2023 (3 years ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. TF-FCP-0523-00692 — FIRE ALARM FOR ANSUL, TMPER/FLOW AND CO2 INTERFACE
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Era-based check — high priority

    Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.

  • Era-based check

    NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.

  • Worth confirming

    Food service carries heavy, cycling kitchen loads and exhaust interlocks. Capacity and existing panel space are the first things to verify on any remodel.

  • Worth confirming

    A pool or spa was permitted in 2022. Pool equipment brings its own bonding grid, GFCI requirements, and usually a subpanel — and the bonding rules have tightened since, so older installations are worth verifying.

Recorded sales (5)

Recorded transfers from the Pima County Assessor — 5 of 5
DatePriceType
2023-12-18$3,169,811Warranty Deed
2021-03-24$900,000Warranty Deed
2017-09-05$710,000Warranty Deed
2008-03-28$790,000
2004-04-29$515,000Special Warranty Deed

Recorded sales are the sales the Pima County Assessor has on file from affidavits of property value — not every transfer, not listings, and not a valuation. Parties are never shown here. A sale with no permitted electrical work since is worth knowing before the next sale or a remodel.

Most recent permit on record for this parcel: 2025-07-22 (TF-FCP-0725-00593) — To upgrade the existing Ansul suppression system with an additional 3-gal cylinder to cover the overage in flow points on the existing system.

Permit history (27)

Permit history for this parcel — 8 of 27 records
DateRecordWhatStatusValue
2025-07-22expired 2026-03-09TF-FCP-0725-00593City permit recordAddition / alterationTo upgrade the existing Ansul suppression system with an additional 3-gal cylinder to cover the overage in flow points on the existing systemInspections
2025-05-23finaledTR-UTL-0525-00837City permit recordRight-of-Way (ROW) - UtilityPRJ293932-1 cox to bore 14' to install new conduit for system tie.Complete
2024-11-23expired 2026-02-02TC-COM-1124-02252City permit recordCommercial BuildingEMERGENCY - City Clearance required for TEP to re-energize at the transformer. A phase lugs needing to be replaced on line side of 600A service disconnect. All parts to be replaced like for like. Repairs being made over the weekend need emergency inspection first thing Monday morning to obtain clearance.Inspections
2024-03-21finaledTR-ROW-0324-00324City permit recordRight-of-Way (ROW)323063 Site 4 - Install Approximately 84 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. A bench Rehab will be completed on MH 8638-01.Complete
2023-11-21finaledTC-CFO-1123-00226City permit recordCertificate of OccupancyNew single-story quickserve restaurant with drive-thru. Proposed building will be roughly 3000 squarComplete
2023-11-15finaledTF-FOP-1123-01771City permit recordFire OperationalPlace of Assembly Permit as Indicated on Approved Building Permit Drawings.Complete
2023-11-08TF-FCP-1123-01293City permit recordFire ConstructionVOID-SUBMIT A FIRE AUTOMATIC FIRE EXTINGUISHING SYSTEM - Hood system - expedite pleaseVoid
2023-11-08finaledTF-FCP-1123-01296City permit recordFire ConstructionEXPEDITE - HoodComplete
Show 19 older records
Permit history for this parcel — remaining 19 records
DateRecordWhatStatusValue
2023-10-31finaledTZ-CMP-1023-00201City permit recordZoning Verification LetterPlease see attached and address as much zoning information as possible.Complete
2023-06-29finaledTR-ROW-0623-00918City permit recordRight-of-Way (ROW)Close lane to park trucks for paving inside property ***Complete
2023-06-02finaledTF-FCP-0623-00727City permit recordFire Constructionconnect to existing 4" fire stub at property line and run 143 feet of 4" C900 to buildingComplete
2023-05-23finaledTR-UTL-0523-01623City permit recordRight-of-Way (ROW) - UtilityAPC WILL NEED TO EXCAVATE A 5X5 BELL HOLE IN CONCRETE SIDEWALK TO REPLACE GAS SERVICE AT 6565 E GRANT ROADComplete
2023-05-22TF-FCP-0523-00700City permit recordFire ConstructionVOID-PLEASE SUBMIT A FIRE OTHER IFC CONSTRUCTION PERMIT & GENERAL OPERATIONAL PERMIT & ALSO THE PLANS INDICATE ADDRESS 6365 E GRANT RD NOT 6565 E GRANT RD-co2 detection systemVoid
2023-05-15finaledTF-FCP-0523-00692City permit recordFire ConstructionFIRE ALARM FOR ANSUL, TMPER/FLOW AND CO2 INTERFACEComplete
2023-02-07TF-FCP-0223-00375City permit recordFire ConstructionVOID-PLEASE SUBMIT AS FIRE AUTOMATIC EXTINGUISHING SYSTEM PERMIT-Connect to existing 4" fire stub at property line and run 143 feet of 4" C900 to building.Void
2023-01-23finaledTR-UTL-0123-00671City permit recordRight-of-Way (ROW) - UtilityWater Main Extension, new fire hydrant, and new fire serviceComplete
2023-01-10finaledTS-PRM-0123-00113City permit recordFence / wall5 ILLUMINATED wall signs and 1 Ground signComplete
2022-12-30TR-ROW-1222-00199City permit recordRight-of-Way (ROW)Water main extension, new fire hydrant, and new fire serviceNeeds resubmittal
2022-08-24finaledT22FC00595City permit recordAddition / alterationAutomatic Fire Extingshing Sys - Installation of a new fire sprinkler system in a new restarurant.; Additional Plan Reviews: 1Complete
2022-08-23finaledT22RW03031City permit recordPool / spaDEVELOPMENT PLAN NUMBER - DP21-0108 SOUTHEAST OF PROPERTY SIDEWALK CLOSURE - 150' TRENCH IN DIRT BEHIND EXISTING SIDEWALK FOR 2" WATER LINE, 4" FIRE LINE, TELEPHONE, IRRAGATION, AND TAP INTO SEWER. DEMO OF EXISTING SIDEWALK & REPLACE SIDEWALK & ADD CURB, AND ADD TO EXISTING DRIVEWAY PAVING. ADA ACCESS. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. DAN ROBERTSON AT 520-400-6722 OR TOM ADKINS AT 520-400-3813. OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP. BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.Complete
2022-05-10finaledT22RW01783City permit recordPool / spa1) 5'X5' BELL HOLE LOCATED IN ROW TO ABANDON GAS SERVICE. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 50’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. 1. BUS STOP IN THE AREA, CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 24-HOURS PRIOR TO START OF WORK FOR COORDINATION. 2. PLACE "BUSINESS ACCESS" SIGNS APPROPRIATELY. SEVERAL BUSINESSES ALONG ROUTE. 3. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 4. PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION. 5. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH. 6. BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.) 7. ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE. 8. REPLACE/ REFRESH ALL STRIPING THAT IS INTERRUPTED BY PATCHES. 9. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. 10. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION. 11. MAINTAIN PEDESTRIAN ACCESS 12. MAINTAIN ACCESS TO BUS STOPS AND FOR PEDESTRIAN INGRESS/ EGRESS. 13. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. IF WEEKEND WORK, MAKE CONTACT 48 HOURS PRIOR TO THE WEEKEND. DAN ROBERTSON- 520-400-6722 OR TOM ADKINS- 520-400-3813Final
2021-06-11expired 2024-05-05T21CM04893City permit recordCommercial BuildingNew Popeyes site utility plan review and Permits. existing development package application DP21-0108Issued
2021-06-11finaledT21CM04894City permit recordCommercial BuildingNew single-story quickserve restaurant with drive-thru. Proposed building will be roughly 3000 squarComplete
2021-06-11finaledT21BU00307City permit recordDEMODemo plan for our proposed Popeyes, existing building is a single story office building. EX Building size is ~4,470 SF. FYI we have an existing Development Package for site DP21-0108 Hope to get Demo Permit + Fee so we can get the ball rolling on demo. Please contact me if you or your team have questions (Or if I filled out something wrong) Please and Thank you!Final
2021-04-22finaledDP21-0108City permit recordDevelopment PackageSite/Grading/Swppp - Popeye's Louisiana Kitchen. New restaurant.Complete
2013-09-24expired 2014-03-26T13OT01126City permit recordFence / wall1- METAL WALL SIGNDenied
2009-04-28finaledT09OT00829City permit recordSIGN16587Final

How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.

Code enforcement (7)

Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.

Code enforcement history for this parcel — 7 of 7 records
DateRecordWhatStatus
2022-02-04T22DV00938Code enforcement caseCode enforcement caseComplian
2018-02-21T18DV00897Code enforcement caseGraffitiComplian
2012-08-31T12DV07957Code enforcement caseCode enforcement caseNoverify
2011-04-21T11DV02796Code enforcement caseCode enforcement caseNoverify
2010-08-10T10DV05314Code enforcement caseCode enforcement caseComplian
2010-03-26T10DV01649Code enforcement caseCode enforcement caseComplian
2010-01-25T10DV00320Code enforcement caseCode enforcement caseCancel

Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this report was built

This is a reading of public records for parcel 13316020X — 27 permits on file from 2009 to 2025 (6 fire construction, 3 right-of-way (row) - utility, 3 commercial building, 3 right-of-way (row)) and 7 code enforcement cases — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.

The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.