Electrical permit history — 8535 E Speedway Bl

8535 E Speedway Bl, Tucson — built 2024, with 20 permits on record. Review electrical, HVAC and remodel history with links to official records.

Commercial property

8535 E Speedway Bl

Built 2024 — 2020s commercial stock · 20 permits on record; no permitted panel/service or HVAC work among them

Parcel
133100210
Built
2024 (assessor record)
Jurisdiction
Tucson
Zoning
C-1
Assessor use
Store Front Commercial Bldg
Parcel size
3.68 acres
Building area
38,900 sq ft (assessor record)
Sewer
Connection on file (2024) (county sewer connection records)
Flood zone
X — minimal flood hazard (FEMA)
Historic preservation
Not on file (City of Tucson HP layers)

See the property

County aerial photograph centered on 8535 E Speedway Bl, parcel outlined

Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.

Is it time to upgrade?

  • Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2024 fire construction permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
  • Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2024 fire construction permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
  • Fire alarm & life safetyCurrentLast permitted 2024 (2 years ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. TF-FCP-0424-00331 — Installation of a new fire alarm system at this location (Valuation = 51,725)
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Worth confirming

    A pool or spa was permitted in 2023. Pool equipment brings its own bonding grid, GFCI requirements, and usually a subpanel — and the bonding rules have tightened since, so older installations are worth verifying.

  • Era-based check

    A capacity and condition review is the usual starting point before any tenant improvement or added load. The permit record does not confirm this; an on-site inspection is required.

Recorded sales (2)

Recorded transfers from the Pima County Assessor — 2 of 2
DatePriceType
2024-12-24$9,280,000Warranty Deed
2023-11-13$1,350,000Warranty Deed

Recorded sales are the sales the Pima County Assessor has on file from affidavits of property value — not every transfer, not listings, and not a valuation. Parties are never shown here. A sale with no permitted electrical work since is worth knowing before the next sale or a remodel.

Most recent permit on record for this parcel: 2024-11-07 (TZ-CMP-1124-00154) — Zoning Verification Letter.

Permit history (20)

Permit history for this parcel — 8 of 20 records
DateRecordWhatStatusValue
2024-11-07finaledTZ-CMP-1124-00154City permit recordZoning Verification LetterZoning Verification LetterComplete
2024-08-23expired 2024-10-25TC-CFO-0824-00181City permit recordCertificate of OccupancyConstruction of a new 38,900 sf, single story retail building for Tractor Supply CompanyIssued
2024-08-22TC-CFO-0824-00178City permit recordCertificate of OccupancyThis project needs the okay for TCO from Engineering Inspector with building level. Please schedule Engineering Final. Once the inspector has given the okay re-request TCO. Any questions please email building_official@tucsonaz.gov Construction of a new 38,900 sf, single story retail building for Tractor Supply CompanyDenied
2024-06-18finaledTR-UTL-0624-01161City permit recordRight-of-Way (ROW) - Utility3' x 6' BELL HOLE IN DIRT ALLEY.Complete
2024-06-14expired 2025-03-11TS-PRM-0624-00274City permit recordFence / wall*Revision #1 (monument sign relocated) started 8/23/24* Install (1) non illuminated building sign, (2) illuminated wall signs and (1) illuminated ground signIssued
2024-06-04finaledTC-COM-0624-01071City permit recordCommercial BuildingInstallation of Tenant provided racking systemComplete
2024-05-30finaledTR-ROW-0524-00644City permit recordRight-of-Way (ROW)Installation of new wet and dry utilities to cross sidewalk right of way on Goebel Ave side of property. installing Water and Sewer utility connections for related Development Package TD-DEV-0623-00286. Updated - 4/04/2024 - Revision Hard Closure Traffic control plan attached for placement of Sewer lines Renewal request update 7/11/2024: Installation of new wet and dry utilities to cross sidewalk right of way on Goebel Ave side of property. installing Water and Sewer utility connections for related Development Package TD-DEV-0623-00286.Complete
2024-04-30finaledTR-UTL-0424-00888City permit recordRight-of-Way (ROW) - UtilityCox to trench 2' and bore 82' to install CATV conduit and place vault for system tie.Complete
Show 12 older records
Permit history for this parcel — remaining 12 records
DateRecordWhatStatusValue
2024-04-26finaledTF-FCP-0424-00331City permit recordFire ConstructionInstallation of a new fire alarm system at this location (Valuation = 51,725)Complete
2024-04-22finaledTR-ROW-0424-00441City permit recordRight-of-Way (ROW)Request for ROW permit along Speedway Blvd for barricades to be place in order to place sidewalk and driveway into new Tractor SupplyComplete
2024-02-23finaledTF-FCP-0224-00142City permit recordFire ConstructionInstall New Automatic Fire Sprinkler system in new commercial building. 360 headsComplete
2024-02-23finaledTR-UTL-0224-00374City permit recordRight-of-Way (ROW) - UtilityInstalling 6" fire hydrant, 6" fire protection service, 2-1" water services with 1" water metersComplete
2023-12-11finaledTF-FCP-1223-01389City permit recordPool / spaProvide and install 192 feet of 6" C900, 1 - 6" backflow preventer, 1 - 6" fire riser spoolComplete
2023-11-30finaledTR-ROW-1123-01407City permit recordRight-of-Way (ROW)Installation of new wet and dry utilities to cross sidewalk right of way on Goebel Ave side of property. installing Water and Sewer utility connections for related Development Package TD-DEV-0623-00286. Updated - 4/04/2024 - Revision Hard Closure Traffic control plan attached for placement of Sewer linesComplete
2023-10-31finaledTF-FCP-1023-01264City permit recordFire ConstructionPropane UST for Tractor Supply CompanyComplete
2023-09-20finaledTC-COM-0923-02247City permit recordCommercial BuildingConstruction of a new 38,900 sf, single story retail building for Tractor Supply CompanyComplete
2023-06-23finaledTD-DEV-0623-00286City permit recordDevelopment Package*Revision #3 (speed table adjustment) started 7/10/2024* *Revision #2 started 1/31/24 (relocating storm pipes)* New construction of a single story, 38,869 SF retail building for Tractor Supply Company.Complete
2023-03-14finaledTZ-CMP-0323-00075City permit recordZoning Verification LetterNEW Tractor Supply Company storeComplete
2022-03-29T22SA00161City permit recordZoning Verification LetterIn review
2008-01-16T08AN00055City permit recordADDRNEWIssued

How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.

Code enforcement (15)

Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.

Code enforcement history for this parcel — 8 of 15 records
DateRecordWhatStatus
2024-07-05CE-VIO0724-02607Code enforcement caseCode enforcement caseClosed - unfounded
2019-11-06T19DV08731Code enforcement caseRefuseNoverify
2019-08-24T19DV06789Code enforcement caseRefuseComplian
2019-05-13T19DV03911Code enforcement caseVegetationComplian
2019-01-11T19DV00204Code enforcement caseRefuseComplian
2014-06-04T14DV03656Code enforcement caseRefuseComplian
2014-02-20T14DV01001Code enforcement caseGraffitiNoverify
2013-01-25T13DV00549Code enforcement caseCode enforcement caseNoverify
Show 7 older records
Code enforcement history for this parcel — remaining 7 records
DateRecordWhatStatus
2012-01-19T12DV00367Code enforcement caseRefuseComplian
2011-06-02T11DV03944Code enforcement caseFireComplian
2011-03-10T11DV01508Code enforcement caseCode enforcement caseNoverify
2008-06-23T08DV05281Code enforcement caseRefuseNoverify
2008-01-11T08DV00469Code enforcement caseCode enforcement caseComplian
2007-07-17T07DV06619Code enforcement caseCode enforcement caseComplian
2007-03-05T07DV02038Code enforcement caseSignComplian

Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.

Planning work at this property?

Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this report was built

This is a reading of public records for parcel 133100210 — 20 permits on file from 2008 to 2024 (3 zoning verification letter, 3 right-of-way (row) - utility, 3 right-of-way (row), 3 fire construction) and 15 code enforcement cases — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-17; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.

The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.